Trains were back in regular service soon after 8AM....
RIDEWITHMEHENRY is the name for our almost monthly day of riding trains and transit in either the NYCity or Philadelphia areas including all commuter lines, Amtrak, subways, light rail and trolleys, bus and ferries when warranted. No fees, just let us know you want to join the ride and pay your fares. Ask to be on our email list or find us on FB as RIDEWITHMEHENRY (all caps) to get descriptions of each outing.
As of 1230 not known if this is a CAT failure but it does sound like one ?
http://nypost.com/2014/04/24/morning-commute-delays-for-lirr-amtrak-and-nj-transit-riders/
blue streak 1 Well April 3rd has a major failure on the od PRR CAT south of BAL near Bowie. Is this wire system past its service life? Seems like a failure WASH - BAL - Perry every month ? Wonder if sudden rise of outside air temperature has anything to do with causing this failure ?
Well April 3rd has a major failure on the od PRR CAT south of BAL near Bowie. Is this wire system past its service life? Seems like a failure WASH - BAL - Perry every month ? Wonder if sudden rise of outside air temperature has anything to do with causing this failure ?
April 3, 2014
3:10 p.m. EDTAmtrak Acela Express and Northeast Regional service has resumed in a limited capacity between Washington and Baltimore following temporary repairs to the overhead wire system in the area of Bowie, Md.
Congestion-related delays are to be expected throughout the evening rush hour as we work toward full restoration of service.
Service Disruption: Due to a fallen tree blocking all four tracks east of Paoli (PAO) causing catenary issues, all service between PHL and Harrisburg (HAR) has been temporarily suspended. We will update as more information becomes available.
That work is being done. Mile by mile at about as slow a pace as fast as Congress allows the money for it. But problems have also fallen by the new cat, too.
The catenary along with several bridges (see Feb. "TRAINS") needs to be replaced. That
would take government funding. Unfortunately, in the America of the 2000s, that would
evoke the dirty word "socialism".
An NJT train had a wire drop onto it while on track 4 just east of the Newark NJ station about 5:45. Screwed up Corridor, NJCoast Line and Raritan Valley services. Train could not move for almost 2 hours while "engineers" decided if there was a danger.
Reports CAT failure near Newark
Thanks to Henry in the next post
Now we have 20 miles of variable tension CAT down from Trenton south.
http://www.amtrak.com/servlet/ContentServer?c=AM_Alert_C&pagename=am/AM_Alert_C/Alerts_Popup&cid=1251625357243
This section is not slated for the replacement that will occur north of Trenton. it will not be replaced until the track is straightened for higher speed travel.
Details are not available yet but some speculation may be that the extreme cold stretched the wires too tight causing separations ?
Amtrak bulletin
January 7, 2014 2:00 PM ET
Amtrak Engineering crews working in bitterly cold conditions since early this morning have made significant progress in repairing a 20-mile section of overhead wires between Trenton, NJ and Holmesburg, PA, with three of the four available tracks are now open.Passengers should however, be prepared for congestion-related delays through the affected area, for most of the day. Amtrak continues to operate a modified schedule today because of the extreme cold, with additional changes being made in real-time as conditions continue to change.
9 - 11 Cat down again between BAL and PHL. Did not get details.
Changed the title slightly to reflect both problems.since heat is many time the cause of CAT failures.
There was another problem with the PRR CAT this time involving NJT. There are certainly more problems with the PRR CAT than thre NH - BOS line. However the number of track miles vs route miles ( ~~ 6 times as much for the PRR ?? ) are much more than the BOS line. Anyone have the exact distances ?
Overmod [I would tend to say part of it is related to (5.) the very substantial percentage of fixed electrification components that are aging. Much of that stuff is considerably older than we are... That may not explain the problems with heat impeding the cooling of main transformers or other components, though. It would help to have some sort of tabulation of the causes of the various locomotive failures...
[I would tend to say part of it is related to (5.) the very substantial percentage of fixed electrification components that are aging. Much of that stuff is considerably older than we are... That may not explain the problems with heat impeding the cooling of main transformers or other components, though. It would help to have some sort of tabulation of the causes of the various locomotive failures...
blue streak 1 Some pure speculation. --- Amtrak has had many loco fasilures from Perryville - WASH in the last few months. There are not enough failures to reliably say that this section is having a significant # of failures but someone needs to look at this. The NH - BOS section does not seem to have even 1/4 the failures that are occurring here. What could be the causes. !. Low voltage or wide swings in voltage ? 2. The use of 25 Hz instead of 60 Hz ? 3. CAT sags causing interruptions to the locos ? 4. Present heat ?
Some pure speculation. --- Amtrak has had many loco fasilures from Perryville - WASH in the last few months. There are not enough failures to reliably say that this section is having a significant # of failures but someone needs to look at this. The NH - BOS section does not seem to have even 1/4 the failures that are occurring here.
What could be the causes.
!. Low voltage or wide swings in voltage ?
2. The use of 25 Hz instead of 60 Hz ?
3. CAT sags causing interruptions to the locos ?
4. Present heat ?
I would tend to say part of it is related to (5.) the very substantial percentage of fixed electrification components that are aging. Much of that stuff is considerably older than we are... That may not explain the problems with heat impeding the cooling of main transformers or other components, though. It would help to have some sort of tabulation of the causes of the various locomotive failures...
Amtrak owns the Northeast Corridor Line in New Jersey. Amtrak has been planning for a long time to replace the catenary here. Both high and low temperatures have caused it to break on occasion. I suspect Amtrak has wasted a fair amount of money on repairs that, had the replacement been made, would not be needed. But given the current mood of the Congress, especially the House, Amtrak's budget may not allow this essential work to be done.
This post is late but NJT admits that wire & other problems is causing many heat delays on NJT. It is time to speed up the rebuilding of the CAT all the way from NYP - PHL. I recognize that those sections where the tracks will be moved for HrSR may wait but isn't it time to get things moving ?
http://www.nj.com/middlesex/index.ssf/2013/07/after_delays_on_northeast_corridor_nj_transit_director_says_heat_is_a_real_challenge.html
Amtrak had a NEC regional BOS - NEW PORT NEWS stall south of Baltimore with 404 passengers on board.
http://www.baltimoresun.com/features/commuting/bs-md-amtrak-train-stalled-20130719,0,3691995.story
5. Many of the above were near BAL. % of north bound Vs Southbound failures. These failures have occurred to both BOS & NYP originators. MARC has also had a lot of motor failures as they are HHP-8s Would be interesting to find out % rate of failures of HHP-8s AEM-7ACs, AEM-7DCs based on Also mileage in revenue service before failure. Non powered time in layovers. .
With the oppressive heat on the NEC ( BOS - WASH ) + Harrisburgh & Spriingfield Amtrak is havingf to limit trains to 80 MPH when rail interior temp + 120 degrees.or higher. MARC has announced speed restrictions several days this week WASH - BAL. It probably is just as well as the PRR type CAT ( NYP - WASH ) will sag so much that any high speed trains would probably snag the CAT. CAT NH - BOS is probably imune. Although Amtarak has not installed heat sensors POU - ALB I imagine they are limiting at least to 80 MPH and maybe less since it was previously CSX ? CSX lines for VRE & MARC are limited to 20 MPH below allowed track speed.
Hopefully this heat will abate by the end of this weekend ?
http://www.amtrak.com/servlet/ContentServer?c=AM_Alert_C&pagename=am/AM_Alert_C/Alerts_Popup&cid=1251624249463
Our community is FREE to join. To participate you must either login or register for an account.