Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

A possible scratch build project for richotrain.

11610 views
186 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2010
  • From: Chi-Town
  • 7,712 posts
Posted by zstripe on Tuesday, November 4, 2014 12:10 AM

Rich,

I'm not letting You sneak away from this thread.

We got all the where's and shots of the building.....now whatcha' going do? Inquiring minds want to know?

I took the plunge today and removed my whole grain elevator complex, started on  repositioning the three tracks that are there. Gonna have to break down and buy two sticks of flex track. Also had to redesign the three open air Transload buildings. Three to gether will be 36'' long, will have to make it 28''. That will be 5 1/2 wide and 28'' long. Should have taken pic's of it before I took it down, but didn't think of it until I removed it and packed it away. The grain elevator complex that is.

 

So are You going do it? Or do You need more research? LOL.

Take Care! Big Smile

Frank

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Sunday, November 2, 2014 4:18 PM

hon30critter

Rich:

Sorry for not giving you proper credit for posting the track drawing.

Dave

 

Dave, I normally wouldn't mind one little bit, but to give the credit to JaBear???

Oh, the humanity !

Laugh

Rich

Alton Junction

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Sunday, November 2, 2014 3:48 PM

Rich:

Sorry for not giving you proper credit for posting the track drawing.

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    September 2003
  • 10,582 posts
Posted by mlehman on Sunday, November 2, 2014 11:56 AM

richhotrain
I need to rent a warehouse to build my Dream layout so that I can include all six Downtown Chicago passenger stations (including Northwestern Station). LOL

See, I knew this discussion might bring you out of the modeling doldrums. That should keep you busy until 2025 or so...Dinner

BTW, nice annotated map.

My main interest in the Monon is far to the south in the limestone quarry lines and the old Bedford & Bloomfield (originally 3', then widened into a rather rambling standard gauge branch that lasted in shrinking form almost to the end of the Monon as a quarry branch on the northwest side of Bedford.) I deeply regret finances have led me to temporarily drop my Monon RR Historical & Technical Society membership, but highly recommend them for anyone interested in the Monon. Their website is well worth some quality time, too.

Mike Lehman

Urbana, IL

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Sunday, November 2, 2014 11:38 AM

Frank, that photo of the west side of the C&EI inbound freight house was invaluable, because the window and door arrangement was different than on the more commonly viewed east side of the freight house.  

Regarding the other freight house complexes, you are correct.  My track diagram for Dearborn Station only covers the six railroads that it served.  To the west of Dearborn Station was LaSalle Station and its freight houses, then Grand Central Station and its freight houses, then Union Station and its freight houses.  To the east of Dearborn Station was Central Station and its freight houses.

I need to rent a warehouse to build my Dream layout so that I can include all six Downtown Chicago passenger stations (including Northwestern Station).    LOL

Rich

Alton Junction

  • Member since
    January 2010
  • From: Chi-Town
  • 7,712 posts
Posted by zstripe on Sunday, November 2, 2014 11:24 AM

Rich,

As You are well aware....some I guess don't realize, the diagram You provided is a gigantic railroad/truck shipping/unloading facility, that is only half of what is there. On the other side of the river, is another facility with a similar diagram and just as large as the one You provided, but with different railroads. Erie,PRR,etc. In the 20's/30's,  40's/50's, LTL (Less Truck Load), LCL (Less Car Load) was in it's hey day. Thousands of jobs in that area, after the war.

Btw: I glad I found that other pic, cause I wanted to show what the truck docks looked like, so if You decide to make Your Dream freight house free standing You'll need to see what it looked like. Back then the Railroads/Trucks worked hand in hand in the LTL,LCL,freight business. Like You already know from our conversations....I was there, My memory may be a little cloudy....but not by much.

Take Care! Big Smile

Frank

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Sunday, November 2, 2014 10:27 AM

As you might imagine, with Dearborn Station serving six railroads, the competition for freight storage space was at a premium.  Each railroad had one or more freight houses (inbound, outbound, storage) of its own.   I highlighted these facilities on the attached track diagram.

Since there have been several photo links to Monon in the replies, I highlighted the old Monon lead and its former freight house.  By the 1950's, Monon moved over the Annex, just east of Dearborn Station.

Rich

Alton Junction

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Sunday, November 2, 2014 5:24 AM

Richs track diagram would also make the caption for this photo wrong, (The freight house on the right is the C&EI outbound freight house. The building dead ahead center is the C&EI inbound freight house.”), as the freight house on the right would be the C&EI inbound freight house.

JaBear, you mixed up the caption and photo link in this reply.  In an earlier reply, you included the correct photo link with the caption.

This is the correct photo link for that caption, and the outbound freight house is, indeed, on the right, and the infound freight house (the subject of this thread) is dead ahead.

http://monon.monon.org/chicago/MESYDChicag901.jpg

Rich

P.S.  Frank includes this same photo in his most recent reply.

Alton Junction

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Sunday, November 2, 2014 5:02 AM

The map was drawn and dated December, 1953.

Rich

Alton Junction

  • Member since
    August 2011
  • From: A Comfy Cave, New Zealand
  • 6,251 posts
Posted by "JaBear" on Sunday, November 2, 2014 4:20 AM
Gidday Dave, Rich actually came up with that track diagram and yes it would be definitely interesting to when it was dated. Looking at it I would have to say that you and Doughless are both right in that the building did not have a loading dock and awning, and without any justification, I would suggest that the portion of awning and dock we see are later additions.
Richs track diagram would also make the caption for this photo wrong, (The freight house on the right is the C&EI outbound freight house. The building dead ahead center is the C&EI inbound freight house.”), as the freight house on the right would be the C&EI inbound freight house.

Mike, a 1950s photo, preferably at ground level and unobstructed by box cars would be the “money shot” for me.

Cheers, the Bear.
 

"One difference between pessimists and optimists is that while pessimists are more often right, optimists have far more fun."

  • Member since
    January 2010
  • From: Chi-Town
  • 7,712 posts
Posted by zstripe on Saturday, November 1, 2014 9:55 PM

Rich,

Here is another shot of the C&EI freight house, but of the truck trailer dock that is on the other side of the flat roof building. Part of the Monon freight house is on the left. This shot is looking south.

This one:

http://monon.monon.org/chicago/MESYDChicag901.jpg

Take Care!

Frank

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Saturday, November 1, 2014 7:51 PM

mlehman

Now if we just find a 1950 shot from roughly that angle, so we can see what the doors looked like then. One thing's for sure, there willl a lot fewer walk-out doors for people along there without a dock in place.

 

Mike, that is a good point about the walk-out doors, or absence thereof, without a dock in place.
 
Rich

Alton Junction

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Saturday, November 1, 2014 4:30 PM

Regarding the presence/absense of docks, JaBear's Rich's drawing of the track arrangement suggests that there were outside docks but only on the north end of the inbound freight house where they show in Rich's original photo. The drawing shows a track close to the building for most of its length but the track curves away from the building towards the end and there appear to be external docks on the last bit.

Is there a date on the drawing?

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    September 2003
  • 10,582 posts
Posted by mlehman on Saturday, November 1, 2014 4:30 PM

This one is captioned 1970...... http://i147.photobucket.com/albums/r293/VIEWLINER/2011%20VLTD/GH02.jpg and now we have freight cars in the way Super Angry...... http://condrenrails.com/ATSF/ATSF-U28CGs.html ..again, just a less than tantalising glimpse..... https://www.tumblr.com/search/dearborn+station I guess that freight houses just weren't sexy enough for a photo in their own right.Sigh

Great finds, there, Bear. I tried looking for better shots and also was suprised at so few on the interwebz. As Rich noted, other lines used Dearborn. I dug through my Monon stuff without any luck, too.

Now if we just find a 1950 shot from roughly that angle, so we can see what the doors looked like then. One thing's for sure, there willl a lot fewer walk-out doors for people along there without a dock in place.

Mike Lehman

Urbana, IL

  • Member since
    December 2008
  • From: Heart of Georgia
  • 5,406 posts
Posted by Doughless on Saturday, November 1, 2014 9:11 AM

hon30critter

JaBear:

The 1970 picture is definately the right building. What is interesting in that shot is that there are no docks and the track does run right next to the building. That begs the question of whether or not the 1950s version had docks or was it set up the same way as the 1970s photo.

As I have said before, I personally think that there were no outside docks on the original building. The partial docks in Rich's original photo are far too sloppy to have been built in the era of the original building, and there is no obvious evidence of docks or roofs along the remainder of the building. Besides, not having docks saves you the better part of an inch in depth for your scene.

Dave

I think the original building didn't have docks and boxcars were loaded directly from the door.  However, the spacing of the doors were probably built for 40 foot boxcars, and when longer boxcars became the norm the railroad could only load/unload as many boxcars that lined up to the existing doors.  So they relocated the track and built a covered dock so more doors could be opened for loading/unloading.

To have a dock or not would depend upon which era Rich wants to model.

IIRC, the spacing of the DPM modulars that Rich is using places the center of dock doors at about 40 foot intervals, so I think the model would be close for either era.

- Douglas

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Saturday, November 1, 2014 7:53 AM

Here is the text of the message that I just posted on the C&EI forum.

I am thinking about modeling that huge freight house that stretches from Roosevelt Road almost to 14th Street in HO scale on my layout.

 

From photos and diagrams that I have seen, the 1-story section of the freight house on the south measured 474' x 60' and the 2-story section on the north measured 288' x 60'.  These dimensions do not include smaller 1-story sections at the far south and north ends of the freight house.

 

Can anyone provide me with more detail on a few aspects of the inbound freight house.  In the photos that I can find from the 1970s, there was a short dock section on the north end of the 2-story section of the freight house and a dilapidated awning over the dock.  Question: did a dock exist at one time over the entire length of the freight house?

 

The configuration of doors and windows in the photos show 3 doors, an overhead door in the middle and a small freight door on each side of the overhead door.  These three doors are flanked by a pair of small windows on either side of the three doors.  Question: why were some doors overhead and some doors not and were these doors spaced to accommodate the doors on box cars?

 

Any information on the C&EI inbound freight house at Dearborn Station, no matter how trivial, would be useful to me.

 

Thanks in advance for any help or comment.

 

Rich

Alton Junction

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Saturday, November 1, 2014 7:29 AM

EDIT: Aaaaah, I see Rich has added some clarification and to think I was accused of being devious.Sad I did say that it appeared to be a different freight house.

LOL    What's the verse in that old song, JaBear, "you always hurt the one you love".   LOL
 
Seriously, though, you continue to amaze me with these neat photos that you keep coming up with.  Here is a map of a portion of Dearborn Station showing the two C&EI freight houses and the trackage around them.  Dearborn Station itself is to the right (north) of these two freight houses.  The inbound freight house is to the left (south) of Roosevelt Road and the outbound freight house is to the right (north) of Roosevelt Road.
 
Rich
 

Alton Junction

  • Member since
    August 2011
  • From: A Comfy Cave, New Zealand
  • 6,251 posts
Posted by "JaBear" on Saturday, November 1, 2014 6:31 AM
To be perfectly honest Dave, I’m totally perplexed. I would have thought that a loading dock would have been a part of the original building, if only to negate the hassle of lining up the boxcar doors with the freight house doors. However looking at the how substantial the building is, I would have expected that the loading dock would have been equally as solid and to have demolished it at some stage and then replaced with that, as you say “sloppy” partial dock just doesn’t make sense. 
To further confuse the issue it would appear that the C&EI had two freight houses according to the caption of this photo, “The freight house on the right is the C&EI outbound freight house. The building dead ahead center is the C&EI inbound freight house.
 
This is the caption for this photo,  Looking south from the old Monon freight house tracks, part of the house is seen on the left. The freight house on the right is the C&EI outbound freight house. The building dead ahead center is the C&EI inbound freight house.”
 
I am starting to feel like Mr Gumby.........
 
Cheers, the Bear Confused
 
 EDIT: Aaaaah, I see Rich has added some clarification and to think I was accused of being devious.Sad I did say that it appeared to be a different freight house.
Yes I think that the C&EI Historical Society would be well worthy of enquiry.
Hmm Research is FunQuestionQuestion Huh?Laugh
 

"One difference between pessimists and optimists is that while pessimists are more often right, optimists have far more fun."

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Saturday, November 1, 2014 6:25 AM

Time out!

JaBear, in his usual devious manner, tried to trick me.

That flat roof on the 1-story portion of the freight house bothered me since, in later years it was sloped.

So, I put my glasses on and looked closer at that photo.

Aha, the freight house in that photo is the C&EI outbound freight house, just to the north of the C&EI inbound freight house.

In my photo, taken from the Roosevelt Road overpass looking south, you can see the C&EI inbound freight house.

In JaBear's photo, taken from the Roosevelt Road overpass looking north, you can see the C&EI outbound freight house.

If you look closely at JaBear's photo, you can see the train shed and station clock tower to the northeast in the upper right portion of the photo.

http://www.pinterest.com/pin/355995545517154497/

Still, it is a very neat photo, and one that I had never seen before.

Rich

Alton Junction

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Saturday, November 1, 2014 5:53 AM

JaBear, that first photo link in your most recent reply is fascinating.

I had never seen that one before.

The C&EI signage at the top of the wall, very interesting.

Also, that first story portion of the building has a flat roof, whereas in my photo, it is sloped.

I am a member of the C&EI forum on Yahoo.  I am going to start a thread there and inquire about the specifics of that building, including the docks, the roof slopes, and anything else that the members care to share.

I can tell you this.  Besides the ATSF as a tenant, five other railroads owned Dearborn Station, C&EI, GTW, Monon, Wabash, and Erie.   Each of those five railroads had two large freight houses at Dearborn, an inbound freight house and an outbound freight house.  The topic of this thread is the C&EI inbound freight house, and that is the one shown in your photo links.

I have several books with photos of trains coming and going on the 4-track C&WI mainline leading into and out of Dearborn Station.  Before making the turn west at 15th Street, that 4-track mainline ran a stretch of 7 blocks, nearly a mile, to Dearborn Station at Polk St. (8th) and Dearborn St. (thus, the name of the station, sometimes called Polk Street Station).  Perhaps the most prominent structure over that stretch of track was the 2-block long C&EI inbound freight house, a combination of 1-story and 2-story structures.

Rich

Alton Junction

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Saturday, November 1, 2014 3:08 AM

Bear:

Your ramblings are always coherent, and very interesting and relevant too I might say.

Now mine on the other hand..... well lets just say that some times I am a bit slow to recognize that I should have shut up a while ago!

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Saturday, November 1, 2014 3:04 AM

JaBear:  Rich:

What is interesting in that shot is that there are no docks and the track does run right next to the building. That begs the question of whether or not the 1950s version had docks or was it set up the same way as the 1970s photo.

As I have said before, I personally think that there were no outside docks on the original building. The partial docks in Rich's original photo are far too sloppy to have been built in the era of the original building, and there is no obvious evidence of docks or roofs along the remainder of the building. Besides, not having docks saves you the better part of an inch in depth for your scene.

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    August 2011
  • From: A Comfy Cave, New Zealand
  • 6,251 posts
Posted by "JaBear" on Saturday, November 1, 2014 2:36 AM
Darn it Rich, this is like chasing that pot of gold at the end of the rainbow!!!Angry
Thought I was on to an early shot of the Freight house but in spite of the caption and unless there was a major rebuild, this is a different C&EI freight house.
 
This one is captioned 1970......
 
and now we have freight cars in the way Super Angry......
 
 
..again, just a less than tantalising glimpse.....
 
 
I guess that freight houses just weren't sexy enough for a photo in their own right.Sigh
 
Cheers, the Bear.Crying
 
PS, Thanks Wayne, I sometimes wonder it my ramblings are that coherent.Laugh
 

"One difference between pessimists and optimists is that while pessimists are more often right, optimists have far more fun."

  • Member since
    September 2003
  • 10,582 posts
Posted by mlehman on Saturday, November 1, 2014 2:26 AM

richhotrain
What I fear most with scratch building is a close match to the prototype from afar but a mediocre, amateurish look from up close.

Rich,

A couple of thoughts on this...

If only you will see it, then you only have to satisfy yourself it's good enough. This is always a good opportunity to go easy on yourself because you found the motivation to do it. My projects often still turn out all over the field, from Shazzam! to I'd rather not talk about it. Yet I enjoy every one once I set aside my own tendencies toward being a perfectionist. In fact, I think model railroading is what finally taught me to accept the fact that "I made it" is more important than "I made it perfect." My baling wire FT truck fix thing this week was a good example of that, pics includedClown

To make this easier, how far away will the installed freight station be from the viewer? If you normally can't get close enough to see the faults, then you're goodBig Smile

Paint and weathering -- if it's in the 50s, it's gonna be dirty -- hide a multitude of sins.

Mike Lehman

Urbana, IL

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Saturday, November 1, 2014 12:16 AM

Rich:

I think your idea of shortening the 1st storey windows is great. It gives you both a more prototypical appearance for the 1st storey windows, and it also makes the 2nd storey windows look better because of the more obvious difference in height between the upper and lower windows. I would still shorten the 2nd storey walls a bit so the ratio of window height to wall height is greater.

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Friday, October 31, 2014 11:45 PM

....As I see it, in this case disappointment has two sides, the possible disappointment in the final result, or the actual disappointment in one day realising you didn’t accept the challenge when you had the chance.....


If you set a goal realistic to your abilities, it's unlikely that you'll be disappointed, and if you're not all that interested in the challenge, then you'll not likely be later disappointed by not accepting it.  Only you can decide.

 

...Model Railroads are FUN, pushing yourself model beyond your comfort zone may seem contrary to that premise, but for me aiming for mediocrity is not fun....

 

A project in which you're truly interested usually draws you in more deeply than you originally intend.  That added interest usually results in you coming out of the project with new-found skills and renewed confidence.

 

...Disclaimer. Now there may be some who read this and manage to take from my ramblings that I somehow look down upon non scratch builders as lesser modellers. Having spent my working life working with my hands, I tend to make the invalid assumption that if I can do something, so can anyone else. Well some can’t, their abilities lie elsewhere, and as long as Model railroads is fun for them, the I have no right to criticize!...


Well said, Bear. Thumbs Up  Those who "can" often assume that anyone "can", but it's not realistic for most people to take up an unfamiliar task and immediately excel.  Modelling, like most skills, is best learned by doing - if you have the courage to take the first step, and have even some success, it can give you confidence to take the next step.   Success builds success, but eventually, your latest efforts may make you dissatisfied with your earlier successes - that is the first step onto the "slippery slope".  While it can take you to a depth of skills you've not imagined, it can also make you lose sight of what is "good enough", and by that, I mean good enough for you.  That's often how overly-ambitious projects get bogged down.
Anyone else for whom your "good enough" isn't good enough meets my definition of a rivet counter and shouldn't cause you any dismay.  In a hobby, the only person you need to please is yourself. Smile, Wink & Grin


Wayne

  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,797 posts
Posted by hon30critter on Friday, October 31, 2014 8:31 PM

Thanks Rich!

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    August 2014
  • 30 posts
Posted by Damon on Friday, October 31, 2014 7:18 PM
the long tractor trailer with its cab at angle is the exact same spot I would park my truck in during the early 2000's, up until they moved the market to its new location. As the length of the trailers grew over the years to the current 54', often times the "street" as we called it could be blocked. often times it could take an hour just to drive the length of the market, and this was at 2am!
  • Member since
    December 2008
  • From: Heart of Georgia
  • 5,406 posts
Posted by Doughless on Friday, October 31, 2014 4:21 PM

richhotrain

I think that I may have resolved my biggest objection to the DPM modules and that is the lack of height difference between the 1st and 2nd story windows.

I could take blank 1st story wall modules and cut them horizontally to cover the lower have of the 1st story windows, making those 1st story windows lower in height in proportion to the 2nd story windows.

I have a jeweler's saw and some fine and xtra fine blades, so with care and caution, I could cut to fit.

What do you think?

Rich

 

 I think I would just chop the bottom off of the top modular walls.  No cut lines to see as they would blend right in to the top of the bottom wall. 

And the smaller DPM walls tend to have a brick banding that stretches about dock height as well, so you need to factor in whether or not your wall would look out of place if the banding was missing, or present where it shouldn't be.

- Douglas

  • Member since
    August 2011
  • From: A Comfy Cave, New Zealand
  • 6,251 posts
Posted by "JaBear" on Friday, October 31, 2014 3:06 PM

richhotrain
What I fear most with scratch building is a close match to the prototype from afar but a mediocre, amateurish look from up close.

That, for me, is a big part of the challenge that I referred to in my digression.  I look at the modelling presented on the forums and am constantly inspired, and what often inspires me the most is that not only was the modeller prepared to give it a go but to share it with us as well.  To be fair some may be more aspiring, to me, than others, in fact there is modelling at a level that I can only aspire too in my dreams. Though having a certain amount of ignorance/ arrogance I will give it a go any way, that is part of doctorwaynes “Slippery Slope”. Being one’s own harshest critic can be a two edged sword and can lead to procrastination, just look at how long my ferry project is taking!! SighThe secret for me, to avoid personal disappointment, is that I now know when to stop before I make a complete pigs ear of the task at hand. 
As I see it, in this case disappointment has two sides, the possible disappointment in the final result, or the actual disappointment in one day realising you didn’t accept the challenge when you had the chance.
Model Railroads are FUN, pushing yourself model beyond your comfort zone may seem contrary to that premise, but for me aiming for mediocrity is not fun.
Disclaimer. Now there may be some who read this and manage to take from my ramblings that I somehow look down upon non scratch builders as lesser modellers. Having spent my working life working with my hands, I tend to make the invalid assumption that if I can do something, so can anyone else. Well some can’t, their abilities lie elsewhere, and as long as Model railroads is fun for them, the I have no right to criticize!
 
"Now you see why I have been procrastinating".
In your case Rich I would suggest that at present you should substitute “planning” for procrastination.Smile, Wink & Grin

Now to further confuse the planning process....

Cheers, the Bear.Smile
 
 

"One difference between pessimists and optimists is that while pessimists are more often right, optimists have far more fun."

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!