Trains.com

Bad train pictures

77223 views
2468 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Wednesday, June 2, 2004 11:02 AM
Mkie,

The cabosse is a transfer caboose used mainly in yard service(doesnt ventrue far from home) and in this case is used for a backup move, the conductor is watching the ROW ahead of him and probably has to flag a few crossings. This type of cabosse is rare these days in most places. Hope this helps and LONG LIVE THE ROCK!!!!!!!!!!!!
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Wednesday, June 2, 2004 11:02 AM
Mkie,

The cabosse is a transfer caboose used mainly in yard service(doesnt ventrue far from home) and in this case is used for a backup move, the conductor is watching the ROW ahead of him and probably has to flag a few crossings. This type of cabosse is rare these days in most places. Hope this helps and LONG LIVE THE ROCK!!!!!!!!!!!!
  • Member since
    December 2001
  • From: Northern New York
  • 25,019 posts
Posted by tree68 on Wednesday, June 2, 2004 12:01 PM
Gotta love that paint job!

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    December 2001
  • From: Northern New York
  • 25,019 posts
Posted by tree68 on Wednesday, June 2, 2004 12:01 PM
Gotta love that paint job!

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    January 2001
  • From: WV
  • 1,251 posts
Posted by coalminer3 on Wednesday, June 2, 2004 1:29 PM
Bow coal train runs to power plant at Bow, NH.

When I was living in that part of the country, they used to originate at Consol mines in WV and then run via PC to the B&M (I'm sure they are people that have better memories abt. this than I do as it was a looong time ago). PC used some interesting power on these trains. I recall photographing a PC Alco RS32/B&M GP9/PC F7B/B&M GP9 set of power on one of these runs.

Hope this helps

work safe
  • Member since
    January 2001
  • From: WV
  • 1,251 posts
Posted by coalminer3 on Wednesday, June 2, 2004 1:29 PM
Bow coal train runs to power plant at Bow, NH.

When I was living in that part of the country, they used to originate at Consol mines in WV and then run via PC to the B&M (I'm sure they are people that have better memories abt. this than I do as it was a looong time ago). PC used some interesting power on these trains. I recall photographing a PC Alco RS32/B&M GP9/PC F7B/B&M GP9 set of power on one of these runs.

Hope this helps

work safe
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, July 11, 2004 5:35 PM
We have not had any questions, stupid or otherwise, in this thread now for over a month. Time to get it back on track. <pun> [(-D][sigh][:-^]
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, July 11, 2004 5:35 PM
We have not had any questions, stupid or otherwise, in this thread now for over a month. Time to get it back on track. <pun> [(-D][sigh][:-^]
  • Member since
    June 2002
  • From: Independence, MO
  • 1,570 posts
Posted by UPTRAIN on Sunday, July 11, 2004 6:03 PM
A little transfer caboose with a LOAD of grafitti, that's awful!!!

Pump

  • Member since
    June 2002
  • From: Independence, MO
  • 1,570 posts
Posted by UPTRAIN on Sunday, July 11, 2004 6:03 PM
A little transfer caboose with a LOAD of grafitti, that's awful!!!

Pump

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Monday, July 12, 2004 1:13 AM
OK, I have one. [:D]

I saw a coal train of empties headed out of town Saturday. I noticed on the cars the following words:

Aluminum Car

Radiant Thaw

Heat Only

The words might not be in correct order but you get the message.

Someone explain how you thaw a car with radiant heat? Is it with heat lamps or are they too hot? And how long does it take to thaw a coal car using radiant heat?

Next question, what other methods of thawing a coal car are used? [?]

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Monday, July 12, 2004 1:13 AM
OK, I have one. [:D]

I saw a coal train of empties headed out of town Saturday. I noticed on the cars the following words:

Aluminum Car

Radiant Thaw

Heat Only

The words might not be in correct order but you get the message.

Someone explain how you thaw a car with radiant heat? Is it with heat lamps or are they too hot? And how long does it take to thaw a coal car using radiant heat?

Next question, what other methods of thawing a coal car are used? [?]

  • Member since
    April 2001
  • From: US
  • 2,849 posts
Posted by wabash1 on Monday, July 12, 2004 7:24 AM
they thaw a car ( around here anyways) with what looks like big toaster grids. before you get to the dumping pit there is a building extension built off of the pit. it has big heaters ( some time used in old manufacturing shops) they are 5ft long and 3 feet wide and hung on the wall 4 high. from ground up and spaced 4ft apart. then the go back to 4- 5 cars long. both sides.( there is plenty of heaters) now when a train is comming through the building even the engines get hot but we are going faster than what we drag the cars at (so we dont get over heated) the coal cars will be in this heated arrangement for over 30 minutes . at 3 tenths of 1 mph it goes by slow and it is only to thaw the ice in the coal so it will dump easier .
  • Member since
    April 2001
  • From: US
  • 2,849 posts
Posted by wabash1 on Monday, July 12, 2004 7:24 AM
they thaw a car ( around here anyways) with what looks like big toaster grids. before you get to the dumping pit there is a building extension built off of the pit. it has big heaters ( some time used in old manufacturing shops) they are 5ft long and 3 feet wide and hung on the wall 4 high. from ground up and spaced 4ft apart. then the go back to 4- 5 cars long. both sides.( there is plenty of heaters) now when a train is comming through the building even the engines get hot but we are going faster than what we drag the cars at (so we dont get over heated) the coal cars will be in this heated arrangement for over 30 minutes . at 3 tenths of 1 mph it goes by slow and it is only to thaw the ice in the coal so it will dump easier .
  • Member since
    December 2001
  • From: Northern New York
  • 25,019 posts
Posted by tree68 on Monday, July 12, 2004 11:00 AM
The unloader at the steam plant here uses a car shaker. You can tell if they are using it from some distance as it shakes other buildings in the area. I've never actually seen it, so have no idea what it looks like - it's in the dumping shed. They dump one car at a time, then advance the string using a RCL.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    December 2001
  • From: Northern New York
  • 25,019 posts
Posted by tree68 on Monday, July 12, 2004 11:00 AM
The unloader at the steam plant here uses a car shaker. You can tell if they are using it from some distance as it shakes other buildings in the area. I've never actually seen it, so have no idea what it looks like - it's in the dumping shed. They dump one car at a time, then advance the string using a RCL.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Monday, July 12, 2004 2:55 PM
Rail-to-Water Transfer (aka KCBX Terminals) in Chicago at 100th St and the Calumet River also uses a car shaker. It lowers onto the top of the hopper and shakes the car on its springs. The cars stay coupled and are on a continuous track.
The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Monday, July 12, 2004 2:55 PM
Rail-to-Water Transfer (aka KCBX Terminals) in Chicago at 100th St and the Calumet River also uses a car shaker. It lowers onto the top of the hopper and shakes the car on its springs. The cars stay coupled and are on a continuous track.
The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Monday, July 19, 2004 9:48 AM
I heard a railroader say once that signals were always red in one direction and green for the other. That made sense to me. BUT the other day I noticed a red signal for one direction and just up the line not more than one quarter of a mile another signal was red for the opposite direction. How can that be? There were no trains coming from either direction and wouldn't be for at least an hour or more. I am sooooooo confussed. [B)] [;)]
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Monday, July 19, 2004 9:48 AM
I heard a railroader say once that signals were always red in one direction and green for the other. That made sense to me. BUT the other day I noticed a red signal for one direction and just up the line not more than one quarter of a mile another signal was red for the opposite direction. How can that be? There were no trains coming from either direction and wouldn't be for at least an hour or more. I am sooooooo confussed. [B)] [;)]
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Monday, July 19, 2004 10:43 AM
CTC Plant, lined up for direction of movement. (In ABS territory you could have green in both directions, and then there is CTC/ABS overlap sections)

Or you have a signal maintainer out there somewhere doing tests (making sure those pesky DC electrons do what they're told!)

Really truly have to know the turf you're operating on and then always be looking for the unexpected. When you get too complacent around a signal system, it will sooner or later jump up and bite you....

[X-)][X-)][X-)][}:)][}:)][}:)]
Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Monday, July 19, 2004 10:43 AM
CTC Plant, lined up for direction of movement. (In ABS territory you could have green in both directions, and then there is CTC/ABS overlap sections)

Or you have a signal maintainer out there somewhere doing tests (making sure those pesky DC electrons do what they're told!)

Really truly have to know the turf you're operating on and then always be looking for the unexpected. When you get too complacent around a signal system, it will sooner or later jump up and bite you....

[X-)][X-)][X-)][}:)][}:)][}:)]
Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Monday, July 19, 2004 11:18 AM
Jim, your signals in opposite directions, facing outward less than a quarter-mile apart, sound like home signals for an interlocking. They'll stay red until the interlocking operator (usually the dispatcher nowadays, but maybe a train itself in the case of an automatic interlocking) lines up a route.

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Monday, July 19, 2004 11:18 AM
Jim, your signals in opposite directions, facing outward less than a quarter-mile apart, sound like home signals for an interlocking. They'll stay red until the interlocking operator (usually the dispatcher nowadays, but maybe a train itself in the case of an automatic interlocking) lines up a route.

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Tuesday, July 20, 2004 2:46 AM
The line is single tracked and runs from the wye (North Little Rock) at around 12th or 13th street and towards Conway, Russelville, Van Buren, Fort Smith. This is the Van Buren sub of Union Pacific. I will get some milepost numbers and post them later on.

The guy who told me they were always red in one direction is a retired MOPAC engineer. He also told me a story about him running 2 engines on a heavy train. He said he was going uphill and making only like 5 mph. All of a sudden a HIrail popped up over the hill headed for them. He put his train in emergency and the Hirail slammed on the brakes. They met bumber to bumber. Turned out to be some managers or such out joyridding and they didn't bother to ask for track and time. Their attitude was "no harm, no foul, now keep it quite, and back to work".

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Tuesday, July 20, 2004 2:46 AM
The line is single tracked and runs from the wye (North Little Rock) at around 12th or 13th street and towards Conway, Russelville, Van Buren, Fort Smith. This is the Van Buren sub of Union Pacific. I will get some milepost numbers and post them later on.

The guy who told me they were always red in one direction is a retired MOPAC engineer. He also told me a story about him running 2 engines on a heavy train. He said he was going uphill and making only like 5 mph. All of a sudden a HIrail popped up over the hill headed for them. He put his train in emergency and the Hirail slammed on the brakes. They met bumber to bumber. Turned out to be some managers or such out joyridding and they didn't bother to ask for track and time. Their attitude was "no harm, no foul, now keep it quite, and back to work".

  • Member since
    July 2003
  • From: Philadelphia, PA, USA
  • 655 posts
Posted by Mikeygaw on Tuesday, July 20, 2004 5:57 PM
ok here's one, ther'e some track work being done on a line that serves a chemical company near me... they seem to be replacing the track... seems like they're replacing one side of the rails, waiting, then replacing the other side several weeks later with the line being used in between... any reason for that? could i just be perseving it wrong?
Conrail Forever!
  • Member since
    July 2003
  • From: Philadelphia, PA, USA
  • 655 posts
Posted by Mikeygaw on Tuesday, July 20, 2004 5:57 PM
ok here's one, ther'e some track work being done on a line that serves a chemical company near me... they seem to be replacing the track... seems like they're replacing one side of the rails, waiting, then replacing the other side several weeks later with the line being used in between... any reason for that? could i just be perseving it wrong?
Conrail Forever!
  • Member since
    September 2003
  • From: Southern Region now, UK
  • 820 posts
Posted by Hugh Jampton on Tuesday, July 20, 2004 8:30 PM
How much track are they replacing, is it CWR, and how long is the line closed for this work?
It could be that the scheduling and the amount of work that can be done during a closure makes more sense to do it this way.

Think about this: You have to fry 3 slices of bread.. It takes 10 seconds to fry one side of each piece. You have a frying pan that holds 2 slices of bread at a time. What's the shortest time that this can be done?
Generally a lurker by nature

Be Alert
The world needs more lerts.

It's the 3rd rail that makes the difference.
  • Member since
    September 2003
  • From: Southern Region now, UK
  • 820 posts
Posted by Hugh Jampton on Tuesday, July 20, 2004 8:30 PM
How much track are they replacing, is it CWR, and how long is the line closed for this work?
It could be that the scheduling and the amount of work that can be done during a closure makes more sense to do it this way.

Think about this: You have to fry 3 slices of bread.. It takes 10 seconds to fry one side of each piece. You have a frying pan that holds 2 slices of bread at a time. What's the shortest time that this can be done?
Generally a lurker by nature

Be Alert
The world needs more lerts.

It's the 3rd rail that makes the difference.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy