Trains.com

Redeployment or One-Person Crews?

10461 views
134 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    June 2009
  • From: Dallas, TX
  • 6,952 posts
Posted by CMStPnP on Wednesday, May 26, 2021 3:37 PM

SD70Dude
Longer trains have the potential to cause additional congestion compared to the same amount of traffic moving in shorter trains.   Many sidings were lengthened out here, but many others were removed or rendered nearly useless by the shift to longer trains.   It is nice to talk about revamping yards to accommodate longer trains, but in reality that usually doesn't happen (big $$$ for little reward and publicity).  So the road crew builds their train out of two or more shorter tracks while everyone else waits for them to clear the lead.   The longer the train, the fewer places you can stop without blocking a crossing.  That 13,000' siding looks great on paper, but if there is a crossing halfway down it you can only park a 6,500' train there.  And due to the aforementioned yard congestion it has become more and more common for trains to be staged in sidings or on double track, sometimes for days at a time.   One of the more egregious examples in my area is a 10 mile section of double track that will hold exactly one 11,000' train.  Or two 10,000' trains.  Or four 9,000' trains.  Or five 8,000' trains.  And so on..... What that you say, cut the crossing?  In some cases this may be a little harder than it sounds.  Walking to and from the cut and applying and releasing handbrakes takes time but isn't a big deal, what is worse is the fact that many crossings are not 'smart', that is the warning devices will not deactivate if equipment is left in the first approach circuit, meaning you have to cut off up to half a mile before the crossing, which in some locations now means your tail end portion might be blocking yet another crossing if you are long enough.  The alternative is to call out a signal maintainer to deactivate the crossing, but if you choose this option trains proceeding on the other track will have to stop and manually protect it (yes, I've seen this happen.  I've seen a Chief Dispatcher choose this option over other, better ones on more than one occasion).    In Canada you need portable derails to protect equipment that is left on a siding or main track and not attached to a locomotive.  Again, not a big deal but it will cause even more delay and cost waiting for the Sectionmen to install and remove the derails.  Hopefully they were called on time....... A clogged terminal radiates congestion for hundreds of miles.  Then you start scrambling and looking for places to park all the trains it can't handle.   

I don't understand why they can't make the shorter trains more efficient by running them faster with less interruption.    If I were a shipper thats the direction I would want the railroad to move, since faster and more frequent trains means my shipment moves faster with more times to ship on the clock.    Why not one crew handles two shorter trains per shift vs. 1 monster train?   

Why does this concept work for FEC but not the larger class I's?

I wonder if anyone really worked it out on paper the advantages of short trains vs longer trains before the decision was made to move to longer trains?    Or did they just jump at one because it was easier to implement with far less skill management wise.

Seems to me as well they could potentially speed up the heavier trains by adding another two axles to the cars and improving the suspension so the car can take higher speeds without falling apart or damaging the track.    Think of how much cheaper it would be to transport Powder River Basin Coal if the Unit Trains could move at 80 mph and turn twice as fast.   The Europeans seem to have no issues moving ballast trains across their rail system at speeds 50-60% faster than the same train in the United States would travel.   They have better maintained track and probably lower axle loads though.    In a country as expansive as ours I would think much faster frieght train speeds would have a better advantage then attempting to turn the rail network into a slow pipeline system.

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Wednesday, May 26, 2021 2:58 PM

greyhounds
One very real advantage of “Monster Trains” is that the number of train meets will be greatly reduced.  A meet usually involves a stopped train and thus creates a waste of labor and capital investment.  (If the wheels aren’t turning, you aren’t earning.)
 
Let’s take UP’s former T&P single track line between Ft. Worth and El Paso, TX as an example.  At one time I read they were running 18 trains each way per day over this line.  Assuming it takes 24 hours or more for a freight to go between Ft. Worth and El Paso that means 18 westbound trains would each meet 18 eastbound trains.  Well, 18 x 18 = 324.  That’s a whole lot of meeting going on.
 
But since each meet involves two trains, we can halve the number to 162.   On average, it still means a stopped train, waiting in the hole for another train to pass, every nine minutes somewhere on the line.  That’s quite a waste of resources and capacity.   
 
Now let’s increase the train size from 100 cars to 300 cars using distributed power.  Instead of 18 trains each way there are now but six trains each way.  Well, 6 x 6 = 36.  Again, since each meet will involve two trains, we can halve the number to 18.  18 meets instead of 162 meets.  The trains and crews keep moving.
 
Of course, these benefits will not come without costs.  Passing sidings and terminals will need to be enlarged to accommodate the longer, but fewer, trains.

Longer trains have the potential to cause additional congestion compared to the same amount of traffic moving in shorter trains.  

Many sidings were lengthened out here, but many others were removed or rendered nearly useless by the shift to longer trains.  

It is nice to talk about revamping yards to accommodate longer trains, but in reality that usually doesn't happen (big $$$ for little reward and publicity).  So the road crew builds their train out of two or more shorter tracks while everyone else waits for them to clear the lead.  

The longer the train, the fewer places you can stop without blocking a crossing.  That 13,000' siding looks great on paper, but if there is a crossing halfway down it you can only park a 6,500' train there.  And due to the aforementioned yard congestion it has become more and more common for trains to be staged in sidings or on double track, sometimes for days at a time.  

One of the more egregious examples in my area is a 10 mile section of double track that will hold exactly one 11,000' train.  Or two 10,000' trains.  Or four 9,000' trains.  Or five 8,000' trains.  And so on.....

What's that you say, cut the crossing?  In some cases this may be a little harder than it sounds.  Walking to and from the cut and applying and releasing handbrakes takes time but isn't a big deal, what is worse is the fact that many crossings are not 'smart', that is the warning devices will not deactivate if equipment is left in the first approach circuit, meaning you have to cut off up to half a mile before the crossing, which in some locations now means your tail end portion might be blocking yet another crossing if you are long enough.  The alternative is to call out a signal maintainer to deactivate the crossing, but if you choose this option trains proceeding on the other track will have to stop and manually protect it (yes, I've seen this happen.  I've seen a Chief Dispatcher choose this option over other, better ones on more than one occasion).   

In Canada you need portable derails to protect equipment that is left on a siding or main track and not attached to a locomotive.  Again, not a big deal but it will cause even more delay and cost waiting for the Sectionmen to install and remove the derails.  Hopefully they were called on time.......

A clogged terminal radiates congestion for hundreds of miles.  Then you start scrambling and looking for places to park all the trains it can't handle.   

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Wednesday, May 26, 2021 2:33 PM

Euclid
U.S. railroads are vehemently opposed to adopting ECP brakes. 

Is it that the railroads are opposed, or are the 50,000* private car owners opposed? 

*-insert real number here. 

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Wednesday, May 26, 2021 1:57 PM

U.S. railroads are vehemently opposed to adopting ECP brakes.  So they use every excuse not to, such as saying ECP is not yet perfected for use.  When you say Rio Tinto Railroad in Australia uses ECP brakes, the U.S. detractors offer more excuses, such as saying Rio Tinto only runs unit trains, so ECP is easy for them. 

But when it comes to autonomous trains, I sense that the concept is quickly becoming welcomed by U.S. railroads, so they don’t need excuses not to adopt autonomous operation.  For one think Autonomous operation can be instituted incrementally, and the overall cost is tiny compared to adopting ECP brakes.  Also, autonomous trains are seen as necessary to prevent rail traffic from being taken over by autonomous trucking.  And finally, autonomous trains are a big step toward the railroads wining their cold war with the labor unions. 

So the railroads don’t make excuses for not adopting autonomous trains like they do for not adopting ECP brakes. 

Regarding the issue of grade crossings being compatible with autonomous trains, this is a standard debate point by the unions.  The point must make a leap from;  it takes 15 miles to stop a freight train to:  you need the human engineer to grab the air and stop the train on a dime to avoid striking a grade crossing runner.  The irony is that even if that were possible, the autonomous system could accomplish the same feat.  And unlike the human engineer, the autonomous operation would not hesitate to apply braking... [edit]

  • Member since
    December 2017
  • 2,671 posts
Posted by Lithonia Operator on Wednesday, May 26, 2021 1:55 PM

The long trains give those T-bone motorists better odds at "success."

Still in training.


  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Wednesday, May 26, 2021 12:58 PM

Murphy Siding
Maybe the answer is that these autonomous trains will require major upgrades at all crossings to make them idiot proof? I'm sure that would be a cheap upgrade.  Add

There is no 'idiot proof'. I am aware of cars being driven into the side of a train that is halfway through the crossing.

  • Member since
    May 2005
  • From: S.E. South Dakota
  • 13,569 posts
Posted by Murphy Siding on Wednesday, May 26, 2021 12:37 PM

zugmann

 

 
greyhounds
  A real safety issue is the number of pedestrians and autos struck by trains.  If the number of trains is reduced the likelihood of a pedestrian or auto being struck by a train should also be reduced.

 

But as trains get longer and block crossings for a longer time - won't people start taking more risks to try to beat them at a crossing? 

 

Maybe the answer is that these autonomous trains will require major upgrades at all crossings to make them idiot proof? I'm sure that would be a cheap upgrade. Mischief

Thanks to Chris / CopCarSS for my avatar.

  • Member since
    May 2005
  • From: S.E. South Dakota
  • 13,569 posts
Posted by Murphy Siding on Wednesday, May 26, 2021 12:31 PM

     Isn't there a very long, iron ore carrier in Australia that's automated? I figure most of the line is through sparley populated country. How are they at dealing with the car and pedestrian issues when they get into a city?

Thanks to Chris / CopCarSS for my avatar.

  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Wednesday, May 26, 2021 8:01 AM

greyhounds
  A real safety issue is the number of pedestrians and autos struck by trains.  If the number of trains is reduced the likelihood of a pedestrian or auto being struck by a train should also be reduced.

But as trains get longer and block crossings for a longer time - won't people start taking more risks to try to beat them at a crossing? 

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

  • Member since
    February 2003
  • From: Guelph, Ontario
  • 4,819 posts
Posted by Ulrich on Wednesday, May 26, 2021 7:05 AM

charlie hebdo

 

 
Ulrich

 

 
charlie hebdo

 

 
greyhounds

 

 
Euclid
Beyond the symbolic objective of running monster trains, the real objective is to run crewless, autonomous trains. 

 

I'll disagree.  Here's the real objective:

"For example, empire builder James J. Hill said in an interview with Frank L. McVey at the turn of the twentieth century 'that railroad income is based on ton miles and the expense of operation on train miles. The object is to get the highest rate [operating revenue] on the ton-mile and the smallest rate [operating expense] on the train mile.' In this statement is concentrated the theory of railroad management present day. (See the Ten Principles of Transportation Economics in Box 2.3, which is the authors’ more extended version of a theory of transportation economics and management such as James J. Hill had formulated.)"
 
Gallamore, Robert E.. American Railroads . Harvard University Press. Kindle Edition.
 

 

 

Wouldn't elimination of crews cut labor costs dramatically and thus the expense of operation?

 

 

 

Eliminating crews would cut cost.. but the as yet unproven technology that would allow their elimination wouldn't come for free either. Given that the technology isn't fully cooked, it is impossible to determine the true savings in making the transition. 

 

 

 

The autonomous trains would be a capital investment,  not an expense as labor would.  Only maintenance would be expenses.  The autonomous equipment would be depreciated.

 

But a cost nontheless.. 

 

  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Tuesday, May 25, 2021 11:00 PM

greyhounds
 
Euclid
Beyond the symbolic objective of running monster trains, the real objective is to run crewless, autonomous trains. 

 

I'll disagree.  Here's the real objective:

"For example, empire builder James J. Hill said in an interview with Frank L. McVey at the turn of the twentieth century 'that railroad income is based on ton miles and the expense of operation on train miles. The object is to get the highest rate [operating revenue] on the ton-mile and the smallest rate [operating expense] on the train mile.' In this statement is concentrated the theory of railroad management present day. (See the Ten Principles of Transportation Economics in Box 2.3, which is the authors’ more extended version of a theory of transportation economics and management such as James J. Hill had formulated.)"
 
Gallamore, Robert E.. American Railroads . Harvard University Press. Kindle Edition.
 

I am not sure where we differ.  When I say the real objective is to run autonomous trains I mean the real objective is to run autonomous trains for the purpose of making the most amount of money by reducing crews to zero persons rather than just reducing to one-person.  

If I understand James Hill, he is saying to make the most amount of money; you haul freight at the highest possible price and reduce the operating cost of your trains as low as possible. 

I don’t think monster trains reduce the operating cost compared to normal average size trains.  I think they raise operating cost, but that is partly offset by the reduced crew per ton cost. 

Autonomous trains eliminate crew cost, so there is no need for the autonomous trains to be monster size trains.  So with autonomous trains, you can run say thee 100-car trains instead of one 300-car train because there is no advantage to the 300-car train.  And then you also have a lower operating cost with the three 100-car trains combined, as opposed to one 300-car train.  That is why I said earlier that changing to autonomous trains will end the monster train era.    

I would not conclude that every railroad is on board with this idea, but U.P. and C.N. seem to be.

  • Member since
    August 2003
  • From: Antioch, IL
  • 4,371 posts
Posted by greyhounds on Tuesday, May 25, 2021 10:58 PM
One very real advantage of “Monster Trains” is that the number of train meets will be greatly reduced.  A meet usually involves a stopped train and thus creates a waste of labor and capital investment.  (If the wheels aren’t turning, you aren’t earning.)
 
Let’s take UP’s former T&P single track line between Ft. Worth and El Paso, TX as an example.  At one time I read they were running 18 trains each way per day over this line.  Assuming it takes 24 hours or more for a freight to go between Ft. Worth and El Paso that means 18 westbound trains would each meet 18 eastbound trains.  Well, 18 x 18 = 324.  That’s a whole lot of meeting going on.
 
But since each meet involves two trains, we can halve the number to 162.   On average, it still means a stopped train, waiting in the hole for another train to pass, every nine minutes somewhere on the line.  That’s quite a waste of resources and capacity.   
 
Now let’s increase the train size from 100 cars to 300 cars using distributed power.  Instead of 18 trains each way there are now but six trains each way.  Well, 6 x 6 = 36.  Again, since each meet will involve two trains, we can halve the number to 18.  18 meets instead of 162 meets.  The trains and crews keep moving.
 
Of course, these benefits will not come without costs.  Passing sidings and terminals will need to be enlarged to accommodate the longer, but fewer, trains.
 
As to safety, I’ve yet to see any evidence that longer trains with distributed power are less safe than other trains.  In fact, the longer, but fewer, trains should improve safety.  A real safety issue is the number of pedestrians and autos struck by trains.  If the number of trains is reduced the likelihood of a pedestrian or auto being struck by a train should also be reduced.
 
 
"By many measures, the U.S. freight rail system is the safest, most efficient and cost effective in the world." - Federal Railroad Administration, October, 2009. I'm just your average, everyday, uncivilized howling "anti-government" critic of mass government expenditures for "High Speed Rail" in the US. And I'm gosh darn proud of that.
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Tuesday, May 25, 2021 10:54 PM

This poster has wanted to stay out of thie fray.  However here is a railway age article about in train forces and that looks at derailments for I suppose all RRs but may not.  Notice it only goes thru 2019 wonder why 2020 not listed ? 

WHITE PAPER: Management of In-Train Forces – Challenges and Directions - Railway Age

amd managment of in train forces.

WHITE PAPER: Management of In-Train Forces – Challenges and Directions - Railway Age

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Tuesday, May 25, 2021 10:52 PM

Do long trains free up capacity?  Yes and No.  It frees it up out on the road between terminals, but they can gum up the works at terminals where said trains originate, terminate or do intermediate work.  Often at the beginning and end these trains have to triple or quadruple in and out.

We have one symbol that fairly regularly dies between crew changes on the east end.  It has a couple of work event locations.  As do other trains.  Only so many can work a yard at the same time.  Even where there is two tracks, especially when one has to be kept open for the priority trains. 

And it seems that every train that has to work a specific yard all show up at the same time.

We also have one on the west end that usually falls short.  Because the terminating yard doesn't have room for it.  I recently had it and actually made it in to the yard put the train away and then cabbed another hour to our tie up location without hitting overtime.  (Overtime on that run begins after 9 hrs 55 mins due to miles run.)  The first time in a long time that has happened.

Jeff

  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Tuesday, May 25, 2021 10:03 PM

charlie hebdo
The autonomous trains would be a capital investment,  not an expense as labor would.  Only maintenance would be expenses.  The autonomous equipment would be depreciated.

I was thinking the same thing earlier today - you beat me to it.  Two different pockets involved.  Convince the investors that in the long run they'll see more money in their pockets and they'll be all in.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    September 2002
  • From: Sterling Heights, Michigan
  • 1,691 posts
Posted by SD60MAC9500 on Tuesday, May 25, 2021 10:01 PM
 

Euclid

 

 
SD60MAC9500
 
 
Euclid

 

 
SD60MAC9500
 
 
Euclid

 

 
SD60MAC9500
 
 
Euclid

 

So U.P. plans on one ground roving conductor in charge of several autonomous trains with no human engineers.  This will abruptly end the era of monster trains and their broken knuckles, which will be good news to the roving conductors.  This will be the ultimate solution to the war between labor and management over crew size.  It will also be the ultimate solution to the crew fatigue problem by allowing the roving conductors to rove closer to home, so they can sleep at home every night.  It will also usher in the era of short, fast, and frequent trains with their agility and flexibility to live up to the true implication of Precision Scheduled Railroading.  Finally all the pieces fall into place. 

 

 

 

 

No it won't. Trains size will not be reduced under automonous operation. Even with a "crewless" train you'll want to keep economies of scale in your favor to remain in competition..

 
 

 

 

 

The only economy of scale for monster trains is moving more cars per crew cost.  Otherwise, monster trains cost more to operate due to more mechanical problems and delays. So, if you reduce or eliminate the crew, economic advantage of monster trains drops.  If it drops low enough to not be able to offset the added cost of breakdowns and delays of monster trains, there will likely be no economic advantage to running them.  Then too, the railroads will be in sharp competition with trucking with its fundamentally quicker delivery.  If railroads want to take business from trucking, they will have to speed up their service.  Monster trains slow down service. 

 

 

 

 

PSR style freights were not created to just cut crew cost. PSR cutting train starts created the side effect of cutting crew cost. You are not looking past the human element.. Some of the key features of PSR, RoW rationalization, and in theory increased capacity which has happened for the most part. Equimpent cost do not go away just because you eliminate a crew. Capacity cost do not go away just because you no longer have a crew. Car utilization cost does not go away just because you do not have a crew.. PSR has it's hiccups and will continue to have them as the focus on OR remains.. For now..

 
 
 
 

 

 

I do agree that there are more costs to railroading than just crew costs.  But I don't see how a great increase in train size lowers those costs. It might if they were monster unit trains.  You mention car utilization.  How do monster trains lower the cost of car utilization?  How do they lower the cost of capcity, as you say?

 

 

 

The increase in size creates capacity with the rolling stock instead of CAPEX going toward the physical plant. PSR pre/swap blocking keeps cars moving instead of dwelling in a terminal. Boxcars for example probably only get 1 turn a month. If PSR can double that to 2 turns a month then you lower the cost associated with your boxcar as its greater velocity creates more capacity and improves on the ROI in your boxcar fleet. The more loads you can get per month means less idle time sitting empty not producing revenue miles.

 
 
 
 
 

 

 

I agree with all your points about striving for the best plant utilization.  Get the best productivity out of the investment.  But why run one 300-car train rather than three 100-car trains?  Where are the statistics that show that the longer the train is, the more productive it is?  Why would increasing the number of cars in one train make those cars more productive, or increase track capacity, as you say?

What I am hearing about monster trains breaking knuckles, suffering delays, waiting for track space, running out of crew time, etc. leads me to conclude that plant productivity drops as trains get longer.  The only point where productivity increases is that the number of cars in one train can be increased indefinitely without adding more crewmembers.  So, the crewmember cost per car drops as trains get longer.  Yet this one benefit is not nearly enough to offset the ponderous disruption and unforeseen complications of running monster trains.

I believe the best way to increase plant productivity is to revert to shorter trains, and more of them.  Shorter trains flow with the plant productivity capacity.  Monster trains disrupt the flow.  Shorter, faster trains also provide the best customer service, which was one of the great selling points of PSR before the industry redefined it. 

Automation, and PTC, will work together to increase track utilization by running more trains closer together.  This is the modern method knocking at the door of old thinking. 

 

The mechanical issues are known. Yet how many failures per train start are occuring? I imagine it's acceptable to the railroads to keep the operating model. Running one long train creates more capacity by freeing up slots on RoW. Most freight is not time sensitive and doesn't need to run in shorter faster trains for most markets. Also do you have the capacity to run these shorter faster trains? How many overtakes are needed? You'll still be holding and hopping in front of traffic.. Even European rail freight operators want to get away from short trains due to the poor economics of operation. Which is why trucks dominate land freight over there. 

"But why run one 300-car train rather than three 100-car trains? "

When you go get a couple bottles of water from the fridge do you walk twice to your refrigerator? Or do you grab them all at once? It's about more efficient operation. 

 
Rahhhhhhhhh!!!!
  • Member since
    September 2017
  • 5,636 posts
Posted by charlie hebdo on Tuesday, May 25, 2021 7:36 PM

Ulrich

 

 
charlie hebdo

 

 
greyhounds

 

 
Euclid
Beyond the symbolic objective of running monster trains, the real objective is to run crewless, autonomous trains. 

 

I'll disagree.  Here's the real objective:

"For example, empire builder James J. Hill said in an interview with Frank L. McVey at the turn of the twentieth century 'that railroad income is based on ton miles and the expense of operation on train miles. The object is to get the highest rate [operating revenue] on the ton-mile and the smallest rate [operating expense] on the train mile.' In this statement is concentrated the theory of railroad management present day. (See the Ten Principles of Transportation Economics in Box 2.3, which is the authors’ more extended version of a theory of transportation economics and management such as James J. Hill had formulated.)"
 
Gallamore, Robert E.. American Railroads . Harvard University Press. Kindle Edition.
 

 

 

Wouldn't elimination of crews cut labor costs dramatically and thus the expense of operation?

 

 

 

Eliminating crews would cut cost.. but the as yet unproven technology that would allow their elimination wouldn't come for free either. Given that the technology isn't fully cooked, it is impossible to determine the true savings in making the transition. 

 

The autonomous trains would be a capital investment,  not an expense as labor would.  Only maintenance would be expenses.  The autonomous equipment would be depreciated.

  • Member since
    February 2003
  • From: Guelph, Ontario
  • 4,819 posts
Posted by Ulrich on Tuesday, May 25, 2021 7:20 PM

Backshop

The perfect corporation has one employee-the CEO, who just collects money and doesn't provide any goods or services.

 

 

And the rest  simply try to employ as few people as possible. 

  • Member since
    July 2016
  • 2,631 posts
Posted by Backshop on Tuesday, May 25, 2021 7:12 PM

The perfect corporation has one employee-the CEO, who just collects money and doesn't provide any goods or services.

  • Member since
    February 2003
  • From: Guelph, Ontario
  • 4,819 posts
Posted by Ulrich on Tuesday, May 25, 2021 6:45 PM

charlie hebdo

 

 
greyhounds

 

 
Euclid
Beyond the symbolic objective of running monster trains, the real objective is to run crewless, autonomous trains. 

 

I'll disagree.  Here's the real objective:

"For example, empire builder James J. Hill said in an interview with Frank L. McVey at the turn of the twentieth century 'that railroad income is based on ton miles and the expense of operation on train miles. The object is to get the highest rate [operating revenue] on the ton-mile and the smallest rate [operating expense] on the train mile.' In this statement is concentrated the theory of railroad management present day. (See the Ten Principles of Transportation Economics in Box 2.3, which is the authors’ more extended version of a theory of transportation economics and management such as James J. Hill had formulated.)"
 
Gallamore, Robert E.. American Railroads . Harvard University Press. Kindle Edition.
 

 

 

Wouldn't elimination of crews cut labor costs dramatically and thus the expense of operation?

 

Eliminating crews would cut cost.. but the as yet unproven technology that would allow their elimination wouldn't come for free either. Given that the technology isn't fully cooked, it is impossible to determine the true savings in making the transition. 

  • Member since
    September 2017
  • 5,636 posts
Posted by charlie hebdo on Tuesday, May 25, 2021 5:31 PM

greyhounds

 

 
Euclid
Beyond the symbolic objective of running monster trains, the real objective is to run crewless, autonomous trains. 

 

I'll disagree.  Here's the real objective:

"For example, empire builder James J. Hill said in an interview with Frank L. McVey at the turn of the twentieth century 'that railroad income is based on ton miles and the expense of operation on train miles. The object is to get the highest rate [operating revenue] on the ton-mile and the smallest rate [operating expense] on the train mile.' In this statement is concentrated the theory of railroad management present day. (See the Ten Principles of Transportation Economics in Box 2.3, which is the authors’ more extended version of a theory of transportation economics and management such as James J. Hill had formulated.)"
 
Gallamore, Robert E.. American Railroads . Harvard University Press. Kindle Edition.
 

Wouldn't elimination of crews cut labor costs dramatically and thus the expense of operation?

  • Member since
    August 2003
  • From: Antioch, IL
  • 4,371 posts
Posted by greyhounds on Tuesday, May 25, 2021 12:41 PM

Euclid
Beyond the symbolic objective of running monster trains, the real objective is to run crewless, autonomous trains. 

I'll disagree.  Here's the real objective:

"For example, empire builder James J. Hill said in an interview with Frank L. McVey at the turn of the twentieth century 'that railroad income is based on ton miles and the expense of operation on train miles. The object is to get the highest rate [operating revenue] on the ton-mile and the smallest rate [operating expense] on the train mile.' In this statement is concentrated the theory of railroad management present day. (See the Ten Principles of Transportation Economics in Box 2.3, which is the authors’ more extended version of a theory of transportation economics and management such as James J. Hill had formulated.)"
 
Gallamore, Robert E.. American Railroads . Harvard University Press. Kindle Edition.
"By many measures, the U.S. freight rail system is the safest, most efficient and cost effective in the world." - Federal Railroad Administration, October, 2009. I'm just your average, everyday, uncivilized howling "anti-government" critic of mass government expenditures for "High Speed Rail" in the US. And I'm gosh darn proud of that.
  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Tuesday, May 25, 2021 12:09 PM

Beyond the symbolic objective of running monster trains, the real objective is to run crewless, autonomous trains.  That will win the war by ending the debate of whether to run one-person crews or two-person crews. 

As the unions argue that two persons in the cab are needed for safety, the companies will argue that it is safest if the human crews are replaced by automation because it never gets fatigued or makes mistakes.  And it always follows the rules.

 

  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Tuesday, May 25, 2021 12:03 PM

Lithonia Operator

Job-killing is almost 100% the object of the game.

 

 

Yes job killing is the one and only basic objective of running monster trains.  But even at that, the largest part of the objective is using monster trains only as a symbolic gesture for the point of management winning their war with labor.  It is only a symbolic gesture because it is obvious that even though monster trains eliminate labor, they do not eliminate enough to offset all of operational disadvantages to running monster trains.   

 

  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Tuesday, May 25, 2021 11:10 AM

Unless I missed it, you missed a biggie - terminals need to be able to handle the long trains.  Terminal dwell is a key metric.

Regular viewers at Deshler often see trains hung out due to limited siding lengths at South Deshler (~7000') unable to hold entire trains.  This is especially constricting for the single track N-S Toledo Division.

The E-W line is double track, but still gets hung up.  I've seen trains sitting on the main, basically parked.

And when Joe says "get the plunger out," it's usually because North Baltimore is stuffed to the gills.  It's great for watching trains as the clog gets sorted out, but can't help the bottom line at all.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    December 2017
  • 2,671 posts
Posted by Lithonia Operator on Tuesday, May 25, 2021 8:56 AM

Job-killing is almost 100% the object of the game.

Still in training.


  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Tuesday, May 25, 2021 8:31 AM

blue streak 1

There appeqrs to be several items that allow the PSR metric to work. These come from posters who know much more than this poster.

1,  Great dispatching meaning dispatchers are not overloaded.

2,  Local traffic and switching needs to be off main line so it does not slow up regular trais.  Note this is a biggie that is not very often able .  Maybe why the Class 1s keep trying to eliminate many small shippers ?

3.  Sidings need to be long enough to park the longest train on the district in question.  2 main tracks somewhat mitigate this but too many trains may mean a 3rd track needed on heavy grade sections.  Or the power to weight ratio needs to be enough to keep a train running at track speeds.

4. There needs to be discipline for getting trains to meet the operating plan times.

5.  Sidings need to be in a time distance depending on number of trains.

6. Special moves requiring slow or restrict speeds need to be planned for open track times.

7.  the siding lengths  and distance need to have enough flexibility to handle absolute work windows (AWWs).  Lack of this is the reason the Crescent gets cancelled 4 days a week every Jan and Feb south of Atlanta. 

8.  Yards and block swapping locations need to be off the main unless no traffic for a certain tie of track access

Am sure others can come up with other points.

This is a good list of the disadvantages of super long trains.  I would add the point that these problems increase exponentially as train length increases.  So the downsides of a 300-car train are greater than the sum of three 100-car trains.

Two other important items that should be added to the list are excessive blocking of grade crossings and excessive in-train forces that cause damage, delays, and endanger the public by raising the derailment potential. 

Currently, there is investigation underway to determine whether a Federal mandate to limit train length should be imposed. 

So why is the monster train philosophy so popular with railroad management?

There is only one reason, and that is that monster trains move more cars without increasing the labor needed to move shorter trains.  So while management loves this because job reduction is in their interest; one more item to add to the list of downsides is that monster trains are job killers. 

  • Member since
    June 2003
  • From: South Central,Ks
  • 7,170 posts
Posted by samfp1943 on Monday, May 24, 2021 11:43 PM

I have no direct proof of "Bad or flat-spotting of wheels" BUT... living close to the line; over the last few months, my perception is that we are'hearing' many more of them on the passing traffic. Particularly, since in the past they were not as obviously as noisey, and no-where, near the larger presence, as they seem to be currently.

My location is on a BNSF feeder line, leading to, and from, the Southern Transcon on BNSF  [approx MP 127 on Main 3  Eldorado sub.]

 

 


 

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, May 24, 2021 11:01 PM

There appeqrs to be several items that allow the PSR metric to work. These come from posters who know much more than this poster.

1,  Great dispatching meaning dispatchers are not overloaded.

2,  Local traffic and switching needs to be off main line so it does not slow up regular trais.  Note this is a biggie that is not very often able .  Maybe why the Class 1s keep trying to eliminate many small shippers ?

3.  Sidings need to be long enough to park the longest train on the district in question.  2 main tracks somewhat mitigate this but too many trains may mean a 3rd track needed on heavy grade sections.  Or the power to weight ratio needs to be enough to keep a train running at track speeds.

4. There needs to be discipline for getting trains to meet the operating plan times.

5.  Sidings need to be in a time distance depending on number of trains.

6. Special moves requiring slow or restrict speeds need to be planned for open track times.

7.  the siding lengths  and distance need to have enough flexibility to handle absolute work windows (AWWs).  Lack of this is the reason the Crescent gets cancelled 4 days a week every Jan and Feb south of Atlanta. 

8.  Yards and block swapping locations need to be off the main unless no traffic for a certain tie of track access

EDIT from tree:   Yards need enough lead and trailing sidings to meet longest trains to not block any main tracks.

Am sure others can come up with other points.

 

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Monday, May 24, 2021 10:37 PM

charlie hebdo
 
Juniata Man

Thank you Steven! VERY much appreciated!

BALT; in our area it's a combination of yard congestion and mechanical issues - both locomotive and with individual cars in a train. Which goes directly to your earlier comment that  that block swapping can negatively impact railcar mechanical inspections. And I'll blame psr for reducing locomotive mechanical shop forces with the resulting negative impact on locomotive servicing.

CW 

I don't know if it's PSR or just bean counters,  but maineance on wheels seems to be getting much worse here along the UP West line.  Metra too.  So many flat-spot spots. 

I can't really speak as to what has happened since CSX started EHH's form of PSR.

Before I retired, the WILD detector that was installed on my territory was capturing 3 or 4 Immediate Set Out cars per week and probably a dozen take to destination at a slower than track speed with the weels needing replacement at destination.  Most all the cars that were being detected were loaded coal hoppers.  What has happened in the past 4.5 years - I have no idea.

Never too old to have a happy childhood!

              

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy