Have fun with your trains
QUOTE: Originally posted by vsmith Ahh, Federal or state building construction of any kind in the US is mind-numbingly slow. Yes, the wheels of Bureuacracy creak slowely in this country, by the time something is finally built, the design is 20 years old and the loads intended have doubled....Thats called "Planning"![:o)]
I tried to sell my two cents worth, but no one would give me a plug nickel for it.
I don't have a leg to stand on.
QUOTE: Originally posted by Limitedclear QUOTE: Originally posted by vsmith Ahh, Federal or state building construction of any kind in the US is mind-numbingly slow. Yes, the wheels of Bureuacracy creak slowely in this country, by the time something is finally built, the design is 20 years old and the loads intended have doubled....Thats called "Planning"![:o)] Damn. I though that was called permitting... LC
QUOTE: Originally posted by mudchicken QUOTE: Originally posted by Limitedclear QUOTE: Originally posted by vsmith Ahh, Federal or state building construction of any kind in the US is mind-numbingly slow. Yes, the wheels of Bureuacracy creak slowely in this country, by the time something is finally built, the design is 20 years old and the loads intended have doubled....Thats called "Planning"![:o)] Damn. I though that was called permitting... LC Permitting is what the locals do to guarantee that the final product looks nothing like the initial idea and is now totally disfunctional like they are![X-)][X-)][X-)]
Quentin
QUOTE: Originally posted by Modelcar Dave I mentioned a question to you about that a week or so ago and perhaps you missed it: Has that new section of north south rail line started to find business yet....It was mentioned that it passes through barrien territory and not too manyt potential customers. We saw a pic of the long silver passenger train I believe it was in TRAINS mag last month or maybe previous month at start up.
QUOTE: Originally posted by Modelcar ...No problem Dave....I'm not sure what post it was under now....On the north south line will they be running a regular scheduled passenger run...?
Never too old to have a happy childhood!
"I like my Pullman Standards & Budds in Stainless Steel flavors, thank you!"
QUOTE: Originally posted by Kozzie [;)] Things don't seem a whole lot different down here. For example, it took us lot a long time to get round to putting the north-south rail link up through the centre of Oz to Darwin. [;)] Dave
-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/)
Our community is FREE to join. To participate you must either login or register for an account.