I bought an SQ8 from Amazon last week and shot a trainview video of a train traversing the entire length of my mainline from exiting the lower return loop all the way up to the upper return loop and then back down all the way through the lower return loop back to the starting position. I speeded up the video 4X real-time because it took about 27 minutes in real time.
It really highlights numerous issues where I need to work on the track 'smoothosity'. :)
Modeling an HO gauge freelance version of the Union Pacific Oregon Short Line and the Utah Railway around 1957 in a world where Pirates from the Great Salt Lake founded Ogden, UT.
- Photo album of layout construction -
Nice . Looks like you have a daunting task with scernery on all of this. I have been watching from the start.
Mike.
My You Tube