  I see Amtrak #29 is on time at Martinsburg this evening.

  • Member since
    May 2004
  • From: Valparaiso, In
  • 5,918 posts
Posted by MP173 on Friday, February 10, 2023 7:12 AM

Balt:
Interesting observation regarding trucking the UPS loads at NS's expense.  Wasnt aware of that contractual agreement, but it makes sense.

In today's trucking market, there should not have any issue finding available truckers.

 

Ed

  • Member since
    May 2004
  • From: Valparaiso, In
  • 5,918 posts
Posted by MP173 on Friday, February 10, 2023 8:39 AM

Amtrak 29 rolled thru Chesterton at 835...about an hour late.  Not bad.

UPS trailers/containers returning.

Progress!

ed

  • Member since
    May 2003
  • From: US
  • 24,939 posts
Posted by BaltACD on Friday, February 10, 2023 11:29 AM

MP173
Balt:

Interesting observation regarding trucking the UPS loads at NS's expense.  Wasnt aware of that contractual agreement, but it makes sense.

In today's trucking market, there should not have any issue finding available truckers. 

Ed

That has been part of UPS contracts for decades.  UPS grades the railroads on 'sort failures'.  Each trailer/continer given to the railroads for transport have a specific day and time to be at the destination UPS facility, if a box is late that constitutes a 'sort failure' and is a strike against the railroad in contract performance.

Railroads are responsible for draying boxes from the railroads destination terminal to the UPS terminal at the destination - UPS doesn't really care how the box is actually handled from the time they give it to the railroad until the railroad gives the box back to UPS at destination.  

Never too old to have a happy childhood!

              

  • Member since
    May 2004
  • From: Valparaiso, In
  • 5,918 posts
Posted by MP173 on Friday, February 10, 2023 2:59 PM

Balt:

Didnt realize that the rails are responsible for final mile delivery to the sort station.  That is actually very smart on their behalf.  No dispute over late delivery.

BTW, 26x just rolled thru with 52 UPS containers/trailers.  Normally it has similar number of FedX...none today.

Ed

  • Member since
    February 2018
  • From: Danbury Freight Yard
  • 452 posts
Posted by OldEngineman on Monday, February 13, 2023 12:59 PM

Fred Cain wrote: "Could they possibly have minimized this disaster with a shorter train?  The engineer tried to stop the train but it piled up anyway.  Would the same thing have resulted with a much shorter train?"

Could we see FRA regs mandating this in time...?

At least for trains that will be carrying hazardous materials and chemicals.

Perhaps a move to segregate hazmat cars into special trains that receive "a higher degree of oversight enroute" than what "regular" trains are subjected to.

Perhaps a 50-80 car limit, depending on what's in the consist.

With mandatory "on the ground inspections" after a certain number of miles.

Or, in lieu of "on-ground" inspections, perhaps a manned car at the rear of the train for additional continuous observation and monitoring. Hey, didn't they have those once before...?Devil

  • Member since
    July 2014
  • 565 posts
Posted by Fred M Cain on Tuesday, February 14, 2023 11:06 AM

Yesterday, I came across an online news article that had originated by or through CBS, which claimed that a security camera had caught images of sparks shooting out from under one of the cars nearly 20 miles before the train piled up.  Is that true?  Did anyone else see that?  I was not able to actually view the video myself.

If that were true, that would cast a pretty bad light on both the crew and the railroad.

You know, there was a terrible wreck on CSX a number of years ago, also in some part of Ohio, I think, where the lead truck on the second unit had derailed and dragged on the ground for a number of miles until the train ran over a turnout.  That's when the whole thing piled up.  I don't think hazmat was involved that time but it sure was one helluva mess.

Could this be what might've happened in Palestine?  Was there a switch or a turnout near where the train piled up?

 

Here was the video of the CSX wreck, also caught on a security camera.  I read elsewhere where the train'd had dragging equipment for six miles, I think it was.  YIKES ~ !

CSX Train Derailment - Wellington, Ohio - Video - YouTube

  • Member since
    January 2014
  • 8,148 posts
Posted by Euclid on Tuesday, February 14, 2023 11:22 AM

Fred M Cain
Yesterday, I came across an online news article that had originated by or through CBS, which claimed that a security camera had caught images of sparks shooting out from under one of the cars nearly 20 miles before the train piled up.  Is that true?  Did anyone else see that?  I was not able to actually view the video myself. If that were true, that would cast a pretty bad light on both the crew and the railroad.

This is very dark, but you can hear the train, which is passing from right to left in the video frame.  It is also obscured in certain areas because buildings block the view.  But the car with the fire is brightly illuminated by the fire, and it appears biefely at approx. 0:20 time.  This is at Salem, Ohio.
 
The key question is why the train did not respond to the heat detector at Salem as it passed with a car displaying a large amount open flames.
 
Footage showing a fiery axle 20 miles before East Palestine train derailment raises questions about alert timing
 
  • Member since
    July 2014
  • 565 posts
Posted by Fred M Cain on Tuesday, February 14, 2023 12:45 PM

Euclid,

Thanks for sharing that.  

It could have been inattentiveness on the part of the crew which caused them to miss the transmission at Salem.  Or, it could have just as easily been a malfunction of the detector at that location.

I have a sinking feeling that this is gonna turn out to be a rather messy investigation.  The tragedy of it all was that it was entirely preventable.

  • Member since
    December 2001
  • From: Northern New York
  • 24,865 posts
Posted by tree68 on Tuesday, February 14, 2023 1:15 PM

Fred M Cain
It could have been inattentiveness on the part of the crew which caused them to miss the transmission at Salem.  Or, it could have just as easily been a malfunction of the detector at that location.

Or, it could have been other radio traffic covering the HBD/DED transmission.

Seems like I read that they did get a warmer-than-normal advisory at some point, but that did not require that they stop.

I'm pretty sure the radio traffic is recorded, and I have no doubt that if that's the case, the "tapes" have been pulled.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    December 2001
  • 1,177 posts
Posted by mvlandsw on Tuesday, February 14, 2023 1:42 PM

It's not hard to miss the radio transmission from detectors. Other radio traffic can override the detector. The crew can be on another channel talking to the dispatcher or someone else. CSX had/has one east of Confluence, Pa. that with a certain length of train, would transmit when the head end was in a tunnel where the transmissiom could not be received. 

Separate detectors east of Willard, Oh. would occasionly transmit simultaneously, garbling both messages.

Depending too much on wireless messaging has it's problems. The old fixed signal method of indicating defects would be a good backup for radio.

How deep in the train was the defective car? I think I saw somewhere that it was around twelve cars. If that is true, I wonder how the crew would not have seen that much fire coming from the car for twenty miles, especially at night.

  • Member since
    May 2003
  • From: US
  • 24,939 posts
Posted by BaltACD on Tuesday, February 14, 2023 1:58 PM

tree68
 
Fred M Cain
It could have been inattentiveness on the part of the crew which caused them to miss the transmission at Salem.  Or, it could have just as easily been a malfunction of the detector at that location. 

Or, it could have been other radio traffic covering the HBD/DED transmission.

Seems like I read that they did get a warmer-than-normal advisory at some point, but that did not require that they stop.

I'm pretty sure the radio traffic is recorded, and I have no doubt that if that's the case, the "tapes" have been pulled.

In hearing many CSX Defect Detectors - there are NO 'conditional' reports to the crews.  It is either NO DEFECTS or a statement of where to inspect for specific defects or if there are too many specific defects the instruction is INSPECT ENTIRE TRAIN.

When I was working, Defect Detectors would broadcast a identifying message to the train when it entered the DD.  Upon the train completely passing the DD it then broadcasts the results message.  If a train stops or goes too slow across the DD it will broadcast a DD Malfunction message and the crew is to inspect the entire train.

DD's retain on site a record of EVERYTHING that they have broadcast for a extended period of time.  A period of time long enough to cover any accident that may have happened after a train passed the detector.  Signal Maintainers can secure this data.

Never too old to have a happy childhood!

              

  • Member since
    July 2010
  • 340 posts
Posted by ns145 on Tuesday, February 14, 2023 4:37 PM

The hotbox and dragging equipment detectors on my local ex-Wabash/N&W Norfolk Southern line have a re-transmit feature.  Key in the correct DTMF tones and the detector will repeat the last transmitted message.  I've heard crews use it a handful of times when the detector got "walked on" by other nearby radio transmissions.

That said, I'm starting to think that there was something wrong with the detector's temperature sensor.  It saw something trending hot, which is NS "code" for not hot enough to trigger an alarm but something the crew should be aware of.  Given the video evidence that's come out, there's no doubt in my mind that it should have triggered a critical alarm.  Usually on my local NS line the detector center will have the train stop and check the problem car out or make a stop with a full service brake application and then release the brakes.  I can't recall them seeing a potential problem and telling a crew to go on their merry way.  I have been impressed by how knowledgable the detector center staff have been.  They have a pretty high hit rate when it comes to analyzing the detector data and then telling the train crew what the most likely issue causing the problem is (handbrake, sticking brakes, bearing starting to go bad, etc.).  Usually, they are right on.

  • Member since
    September 2017
  • 5,547 posts
Posted by charlie hebdo on Tuesday, February 14, 2023 4:57 PM

Fred M Cain

Yesterday, I came across an online news article that had originated by or through CBS, which claimed that a security camera had caught images of sparks shooting out from under one of the cars nearly 20 miles before the train piled up.  Is that true?  Did anyone else see that?  I was not able to actually view the video myself.

If that were true, that would cast a pretty bad light on both the crew and the railroad.

You know, there was a terrible wreck on CSX a number of years ago, also in some part of Ohio, I think, where the lead truck on the second unit had derailed and dragged on the ground for a number of miles until the train ran over a turnout.  That's when the whole thing piled up.  I don't think hazmat was involved that time but it sure was one helluva mess.

Could this be what might've happened in Palestine?  Was there a switch or a turnout near where the train piled up?

 

Here was the video of the CSX wreck, also caught on a security camera.  I read elsewhere where the train'd had dragging equipment for six miles, I think it was.  YIKES ~ !

CSX Train Derailment - Wellington, Ohio - Video - YouTube

 

Explanations and excuses aside, it means safety equipment and  factors are being neglected or are simply inadequate for such heavy axle loadings 

  • Member since
    January 2014
  • 8,148 posts
Posted by Euclid on Tuesday, February 14, 2023 6:09 PM
I cannot image a heat detector finding a car on fire and not be able to communicate that due to the communication system being interrupted by other use.  I would think it would be just “hard wired” into immediately stopping the train.  It seems like an infallible detector connected to a bureaucracy.
 
Maybe this makes the case for detectors onboard the railcars instead of on the wayside. 
  • Member since
    October 2014
  • 1,108 posts
Posted by Gramp on Tuesday, February 14, 2023 7:14 PM

Man, the sharks have found their prey now.  Derailments just part of doing business?

Railroads better go back to basics.  Like safety first.  Sensible employment.  Protecting the property.   

  • Member since
    May 2003
  • From: US
  • 24,939 posts
Posted by BaltACD on Tuesday, February 14, 2023 7:30 PM

Euclid
I cannot image a heat detector finding a car on fire and not be able to communicate that due to the communication system being interrupted by other use.  I would think it would be just “hard wired” into immediately stopping the train.  It seems like an infallible detector connected to a bureaucracy.
 
Maybe this makes the case for detectors onboard the railcars instead of on the wayside. 

Obviously you have never dealt with communication systems beyond Radio Shack walkie talkies.

Never too old to have a happy childhood!

              

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,834 posts
Posted by blue streak 1 on Tuesday, February 14, 2023 10:14 PM

Here on CSX at LaGrange ga it has defect detectors about one mile outside of town on all four routes that go thru LaGrange.  Now the detector north of LGC is about 12 - 13 miles from the north one on the A&WP.  Seems like they around here may be closer than NS but  cannot say for sure on the other lines ??  

  • Member since
    May 2003
  • From: US
  • 24,939 posts
Posted by BaltACD on Tuesday, February 14, 2023 10:34 PM

blue streak 1
Here on CSX at LaGrange ga it has defect detectors about one mile outside of town on all four routes that go thru LaGrange.  Now the detector north of LGC is about 12 - 13 miles from the north one on the A&WP.  Seems like they around here may be closer than NS but  cannot say for sure on the other lines ??  

When I was working, CSX was making an effort to have DD's every 15 miles or there abouts.

FRA regulations require a train to pass a working detector every 50 miles or the train must be stopped and get a walking inspection.  Needless to say, walking inspections are discouraged for many reasons.

Initially DD's were being spaced about ever 25 Miles which was all well and good, could even stay within the regulations if one of the DD's had issues and had to be taken out of service.  Problems happened when consecutive DD's had to be taken out of service; that is when CSX began the program to space them about every 15 miles, thus consecutive DD's could be O/S and a train could still be inspected by a DD within the every 50 miles requirement.

Never too old to have a happy childhood!

              

  • Member since
    January 2014
  • 8,148 posts
Posted by Euclid on Wednesday, February 15, 2023 7:12 AM
BaltACD

 

 
FRA regulations require a train to pass a working detector every 50 miles or the train must be stopped and get a walking inspection.  Needless to say, walking inspections are discouraged for many reasons.
In the case of this derailment, it does not seem that the issue was detector spacing.  They passed one in Salem, OH while video there showed a car in the train to be brightly ablaze, starting at the lead truck and trailing back.  Wouldn’t that require the train to be stopped immediately? 
 
The next detector was 20 miles further at Palestine, OH.  As I understand it, they passed the detector there and got an excess heat indication, so they decided to stop, and may have started braking to stop there.  But the train derailed before they could stop. 
 
This raises the obvious question as to why the train passed the Salem detector without stopping.  What are the possible explanations?
  • Member since
    May 2003
  • From: US
  • 24,939 posts
Posted by BaltACD on Wednesday, February 15, 2023 8:01 AM

The 'chatter' I am hearing on HERE, is to the effect that what the Salem Detector reported was 'trending' and therefore 'conditional' in what the crew response should be.

I DO NOT know NS procedures.  On CSX Defect Detectors are a GO/NO GO deal.  The detector either reports No Defects or identifies Defect loctions with the direction 'Inspect Train'.  The 'routine' Detector on CSX is a combination Hot Box/Dragging Equipment detector.  These detectors broadcast the results of their inspection over the Road Radio Channel at the completion of the inspection.  Crews KNOW to listen for the DD Inspection Report after passing the Detector.

The CSX WILD (Wheel Impact Load Detectors) do not broadcast reports to trains, instead they send their data to the Mechanical Department in Jacksonville, where the data is evaluated and warnings are then sent to both the Train Dispatcher and the Chief Dispatcher on the territory the train is operating via the CADS system with the instructions for the train to stop and inspect the indicated car(s) for flat wheel type defects.  WILD's are not hot box detectors.

Never too old to have a happy childhood!

              

  • Member since
    July 2010
  • 340 posts
Posted by ns145 on Wednesday, February 15, 2023 8:25 AM

BaltACD

The 'chatter' I am hearing on HERE, is to the effect that what the Salem Detector reported was 'trending' and therefore 'conditional' in what the crew response should be.

I DO NOT know NS procedures.  On CSX Defect Detectors are a GO/NO GO deal.  The detector either reports No Defects or identifies Defect loctions with the direction 'Inspect Train'.  The 'routine' Detector on CSX is a combination Hot Box/Dragging Equipment detector.  These detectors broadcast the results of their inspection over the Road Radio Channel at the completion of the inspection.  Crews KNOW to listen for the DD Inspection Report after passing the Detector.

The CSX WILD (Wheel Impact Load Detectors) do not broadcast reports to trains, instead they send their data to the Mechanical Department in Jacksonville, where the data is evaluated and warnings are then sent to both the Train Dispatcher and the Chief Dispatcher on the territory the train is operating via the CADS system with the instructions for the train to stop and inspect the indicated car(s) for flat wheel type defects.  WILD's are not hot box detectors.

 

NS contacts trains with subcritical problems after they pass a detector.  They go above and beyond what you describe at CSX. 

I watched them stop a train on Monday with a block of 5 cars with sticking brakes that were "trending hot".  MOW forces trackside confirmed seeing brake smoke coming from some cars behind the mid-train DPU.  The train stopped, did a set and release on the brakes and proceeded without incident past the next detector. 

  • Member since
    January 2014
  • 8,148 posts
Posted by Euclid on Wednesday, February 15, 2023 9:50 AM

ns145

 

 
BaltACD

The 'chatter' I am hearing on HERE, is to the effect that what the Salem Detector reported was 'trending' and therefore 'conditional' in what the crew response should be.

I DO NOT know NS procedures.  On CSX Defect Detectors are a GO/NO GO deal.  The detector either reports No Defects or identifies Defect loctions with the direction 'Inspect Train'.  The 'routine' Detector on CSX is a combination Hot Box/Dragging Equipment detector.  These detectors broadcast the results of their inspection over the Road Radio Channel at the completion of the inspection.  Crews KNOW to listen for the DD Inspection Report after passing the Detector.

The CSX WILD (Wheel Impact Load Detectors) do not broadcast reports to trains, instead they send their data to the Mechanical Department in Jacksonville, where the data is evaluated and warnings are then sent to both the Train Dispatcher and the Chief Dispatcher on the territory the train is operating via the CADS system with the instructions for the train to stop and inspect the indicated car(s) for flat wheel type defects.  WILD's are not hot box detectors.

 

 

 

NS contacts trains with subcritical problems after they pass a detector.  They go above and beyond what you describe at CSX. 

I watched them stop a train on Monday with a block of 5 cars with sticking brakes that were "trending hot".  MOW forces trackside confirmed seeing brake smoke coming from some cars behind the mid-train DPU.  The train stopped, did a set and release on the brakes and proceeded without incident past the next detector. 

 

I understand you to be saying that a car that is "trending hot" may still be subcritical.  In any case, the train that derailed had passed a heat detector in Salem, OH, and private video showed one car to be lit up with flames trailing from the lead truck.  Could a car in this condition be deemed "subcritical" and not require stopping to investigate? 

  • Member since
    December 2001
  • From: Northern New York
  • 24,865 posts
Posted by tree68 on Wednesday, February 15, 2023 10:13 AM

Euclid
Could a car in this condition be deemed "subcritical" and not require stopping to investigate? 

I would opine that it would depend on the thresholds for which the detector was set, and the relative temperature between a hotbox and actual flame.  One would think flame would be hotter, but...

It would be the lube that was burning, and perhaps any non-metallic seals.

And it would depend on whether that particular sensor was operating properly.  

I have no idea if there is any sort of test done on the IR/temperature sensors on a regular basis.  And even if there is, it's probably at a long enough interval that one could fail in the interim.  That's a signal/MOW question.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    January 2014
  • 8,148 posts
Posted by Euclid on Wednesday, February 15, 2023 10:40 AM
I would think the hottest part of the failure would be the metal-on-metal sliding contact associated with the general breakup of the dry and overheated bearing.  Those temperatures would reach the melting point of steel.  The vivid flames trailing off the hot bearing would be cooler. 
 
My basic point is that it would seem that a car that is involved in an actual bearing failure process would be super critical and urgently demand being stopped immediately. 
 
I understand your point about the detector failing to fully register that problem, but I am only wondering about the policy involved.  Certainly it would not allow a car in that condition to continue for 20 miles to the next detector.  I have to assume the crew never knew about the condition.  Even if they had been informed in such a way to indicate a mild concern, they would have looked back on the inside of curves to see the fire.  I am sure they would have stopped immediately if they had seen the problem. 
  • Member since
    July 2014
  • 565 posts
Posted by Fred M Cain on Wednesday, February 15, 2023 11:08 AM

You know, many years ago, I knew a guy who was an SP brakeman on the road based out of Tucson.  This was long before caboose-less trains and most, if not all, road freights still had a combination of roller and friction bearing journals in the consist.

This guy told me that he'd much rather have a "hotbox" in a friction bearing journal than in a roller bearing journal because, as he explained, usually with a hotbox on a friction bearing journal you can either see it or smell it or often times both but that's not always the case with an overheated roller bearing journal.  He did mention that on a roller bearing journal, sometimes you could hear it but usually not see or smell any smoke.

His testimony, however, doesn't quite explain what was burning as the train rolled through Salem, OH.  What truly amazes and astounds me is that the damn thing made it another 20 miles.

  • Member since
    December 2001
  • From: Northern New York
  • 24,865 posts
Posted by tree68 on Wednesday, February 15, 2023 11:28 AM

Euclid
...but I am only wondering about the policy involved.

NS145 outlined that for NS.  Essentially, if it doesn't meet the criteria, they simply get an advisory.  

The question would be how long/how far a car can get with a failing bearing.  Part of that is dependent on speed - the faster they are moving, the more quickly the bearing will go from initial failure to melting the end of the axle off.

I'm sure this will all be a part of the final FRA report.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    July 2010
  • 340 posts
Posted by ns145 on Wednesday, February 15, 2023 12:13 PM

tree68

 

 
Euclid
...but I am only wondering about the policy involved.

 

NS145 outlined that for NS.  Essentially, if it doesn't meet the criteria, they simply get an advisory.  

The question would be how long/how far a car can get with a failing bearing.  Part of that is dependent on speed - the faster they are moving, the more quickly the bearing will go from initial failure to melting the end of the axle off.

I'm sure this will all be a part of the final FRA report.

 

They get an advisory and almost always they are requested to stop and inspect or stop and release the brakes.  My big question is why this particular train didn't get stopped.  I'm sure NS wish they had stopped 32N now, but hindsight is 20/20.

  • Member since
    May 2003
  • From: US
  • 24,939 posts
Posted by BaltACD on Wednesday, February 15, 2023 3:36 PM

tree68
 
Euclid
...but I am only wondering about the policy involved. 

NS145 outlined that for NS.  Essentially, if it doesn't meet the criteria, they simply get an advisory.  

The question would be how long/how far a car can get with a failing bearing.  Part of that is dependent on speed - the faster they are moving, the more quickly the bearing will go from initial failure to melting the end of the axle off.

I'm sure this will all be a part of the final FRA report.

Part is dependent upon speed and part is dependent upon loading - the heavier the car is loaded the more pressure it is placing on the bearing.  With nominal maximum load being 286K upon 4 axles per car and each axle having 2 journals that ends up being 35,750 pounds per journal.  A somewhat substantial load per journal.

Never too old to have a happy childhood!

              

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy