Trains.com

Diesels Catalogued, but not Built

69253 views
264 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2006
  • 21 posts
Posted by EMD History Researcher on Friday, February 12, 2016 8:00 PM
Rare photo. Is there a builders number on this?
  • Member since
    May 2015
  • 37 posts
Posted by mandealco on Wednesday, November 4, 2015 3:14 AM

LensCapOn

The Alco C620 has been mentioned as an offered item several times here. Has anyone found a drawing of the proposed engine? There is a thread at the MT forum on modeling one and this seems like a good place to ask. 

 

A big question is would it have been on the C628/630 frame or a short one like the RSD-12.

 

Thanks! (Now to see what it would have looked like in G&W G&D colors...)

 

The experts say it would have been on the same frame as the C-628.

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Tuesday, November 3, 2015 9:32 PM

I am reluctant to add the ES23B until it is officially out of the catalogue. Since it is a rebuild any older GE core would eliminate the need for Tier IV compliance.

That said, I doubt we will ever see any constructed because of the lack of a market. As you said on that other forum, there isn't any demand for GEs in secondary service. The 4-axle Dash-8s have begun to be retired. EMDs and EMD repowers will hold down all those jobs.

Thanks for bringing this thread back!

  • Member since
    November 2008
  • 1,881 posts
Posted by Leo_Ames on Tuesday, November 3, 2015 9:03 PM
  • Member since
    April 2011
  • 649 posts
Posted by LensCapOn on Thursday, September 10, 2015 4:30 PM

The Alco C620 has been mentioned as an offered item several times here. Has anyone found a drawing of the proposed engine? There is a thread at the MT forum on modeling one and this seems like a good place to ask. 

 

A big question is would it have been on the C628/630 frame or a short one like the RSD-12.

 

Thanks! (Now to see what it would have looked like in G&W G&D colors...)

  • Member since
    November 2013
  • 1,097 posts
Posted by Buslist on Wednesday, September 2, 2015 8:12 AM

NorthWest

I think the main problems with the JetTrain were not technical or economic, but more the lack of a market. JetTrain was promised as a cheap train system for startup HSR systems such as the Texas TGV. When these proposals collapsed, so did any demand for the trains. I don't think that that has changed, and any HSR proposed now is slated to be electrified. The only existing operator that could use them, VIA, ran into money problems. I would expect the computer system, the problem with the HHP-8s, is similar to the Acela power car system.

 

 

Just a a couple of notes on the "Jet Train". First this was really a FRA project championed by one of it's employees. Bombardier got the contract to build it as part on the Acela project. The concept, as described by that FRA employee was to use something like it to extend Acela service to Richmond and Norfolk. FRA also sponsored the demonstration tour. The fact the builder wasn't much interested in it was reflected in the fact that they didn't even bid for the Midwest High Speed train sets in the late 90's. 

Of course the $ went away, the FRA employee retired and some defect was found with the turbine and it was condemned. The unit has languished in Pueblo for years now and is used as a training prop for TSA. 

Several years ago FRA did express some interest in re engining it, but again it was pretty much a single employee behind the interest.

The builder's North American group has expressed no interest, but when observing some of the ALP45DM testing the head of the European locomotive division was somewhat interested. He said his approach would multiple smaller diesels, but nothing has come of that interest.

  • Member since
    October 2014
  • From: La Grange Illinois USA
  • 131 posts
Posted by 16-567D3A on Tuesday, September 1, 2015 6:52 PM

.                                                                                  

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Tuesday, September 1, 2015 5:20 PM

I believe that one was built for Office Chérifien des Phosphates, but thanks for your contribution. I appreciate it! Do you have any more?

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Tuesday, September 1, 2015 7:21 AM

Back to the original topic.  Baldwin did catalog one export model which was never built:  the DRS6-4-750.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Monday, August 31, 2015 5:56 PM

I think the main problems with the JetTrain were not technical or economic, but more the lack of a market. JetTrain was promised as a cheap train system for startup HSR systems such as the Texas TGV. When these proposals collapsed, so did any demand for the trains. I don't think that that has changed, and any HSR proposed now is slated to be electrified. The only existing operator that could use them, VIA, ran into money problems. I would expect the computer system, the problem with the HHP-8s, is similar to the Acela power car system.

  • Member since
    October 2014
  • 1,644 posts
Posted by Wizlish on Monday, August 31, 2015 4:13 PM

ALPS is the Advanced Locomotive Propulsion System (not a 'locomotive' as such) which was developed under John Herbst at the University of Texas, piggybacking off Strategic Defense Initiative work on generators for things like railguns.  It was a very interesting project, and if you look carefully on the CEM Web site at UT you can still find an index of many of the papers regarding the MegaGen and the systems that would drive it.

In a sense this was a little reminiscent of the Borst atomic locomotive -- military technology looking for an effective peacetime use.  The difference was that the ALPS system was highly suited to HSR, perhaps better than any other self-contained power system has been.

As designed. the system was designed as a hybrid, with substantial short-term energy storage capability either from the turbine power or from regeneration.  This did not apparently make it to the Jet-Train demonstrator, which was basically a siamesed diesel/turbine system running a more conventional kind of alternator.  My suspicion is that the Bombardier locomotive shares considerable DNA with the HHP-8, which may explain why we have heard so little of the idea even though powering the thing with, say, a C175-20 might be an interesting adaptive re-use of much of the engineering...

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Monday, August 31, 2015 9:08 AM

Well, the JetTrain power car was built...and it did serve as a demonstrator. You've lost me at ALPS-could you elaborate? Some sort of GE turbine locomotive?

  • Member since
    October 2014
  • 1,644 posts
Posted by Wizlish on Monday, August 31, 2015 2:35 AM

NorthWest
NGPL would not have been the final designation, and it may be used in the future for other locomotive proposals, thus the 'Genesis II'

This is not a 'diesel' question per se. but then neither was the Lima free-piston demonstrator: where there was a NGPL there was also an ALPS.  Did Bombardier ever catalogue the Jet-Train locomotive?

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Sunday, August 30, 2015 10:37 PM

Annoyingly, even if it was a half E5 like MP's half E6, it would still have been designated by EMD as an AA...

I do wish fluting had been used more on later E units.

 

SD60MAC9500, that is what I was talking about. NGPL would not have been the final designation, and it may be used in the future for other locomotive proposals, thus the 'Genesis II'

  • Member since
    January 2002
  • 4,612 posts
Posted by M636C on Sunday, August 30, 2015 9:22 PM
NorthWest wrote the following post 8 hours ago:

Very interesting indeed! Since EMD proved willing to install custom noses on the E2s, I can't imagine that cost was a factor, especially since most of the E5 was a customized model anyway. Perhaps EMD had decided to standardize on the EA/E1/E3/E6 nose? It definitely looks like an EMD drawing, though.

I think I'll call this 'shovel nose E5' but I would certainly like more information.

Curious that the blogger doesn't seem to know that isn't 9908.

Thanks!

At the time there was concern regarding collision safety and the effect of "Tie Flicker" upon crews in box cab type locomotives, and this was one reason that the odd changes were made to ATSF 1 and what became ATSF 10, although Burlington never altered any of their shovel noses.

So I think EMD probably pushed the safety line and wanted it partly since it maintained the current image they were advertising for the rest of the E unit line.

If they'd succeeded earlier, 9908 might have been a single engined E5 instead of the last shovel nose...

Strangely, it is relatively common for the wrong drawing to appear and not be noticed. I think some people just don't understand drawings.

M636C

 
  • Member since
    September 2002
  • From: Sterling Heights, Michigan
  • 1,691 posts
Posted by SD60MAC9500 on Sunday, August 30, 2015 2:38 PM

"First off is an updated Genesis specification that GE offered once the P42DC failed to meet various specifications. It has the GEVO and a new cab design since the old one failed to meet crash safety standards when it was offered. I've dubbed it the Genesis II for lack of another model name and due to the numerous design differences"

 

The only updated Genesis was GE's Vergara designed NGPL (Next Generation Passenger Locomotive) http://vergarastudio.com/index.php/projects/ge-next-generation-pl.html. I believe VIA Rail placed an order, but was then cancelled at a later date.

Rahhhhhhhhh!!!!
  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Sunday, August 30, 2015 12:26 PM

Very interesting indeed! Since EMD proved willing to install custom noses on the E2s, I can't imagine that cost was a factor, especially since most of the E5 was a customized model anyway. Perhaps EMD had decided to standardize on the EA/E1/E3/E6 nose? It definitely looks like an EMD drawing, though.

I think I'll call this 'shovel nose E5' but I would certainly like more information.

Curious that the blogger doesn't seem to know that isn't 9908.

Thanks!

  • Member since
    January 2002
  • 4,612 posts
Posted by M636C on Saturday, August 29, 2015 6:35 PM

While this wasn't exactly "catalogued" it definitely wasn't built...

http://www.dieselpunks.org/profiles/blogs/sunday-streamline-40-silver

Scroll down to the drawing, third illustration from the top...

That's not 9908, it is an E5 with 9908's cab....

On reflection, that's probably what Burlington asked for at first. I wonder who talked them into the E5 as built, which looks much better....

M636C

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Tuesday, August 25, 2015 11:40 PM

Discouragingly, it appears that the BLH records were spread amongst quite a few organizations with much of it destroyed beforehand. Baldwin only seems to have advertised models that were already in production, so hopefully someone has a catalogue somewhere.

  • Member since
    November 2008
  • 1,881 posts
Posted by Leo_Ames on Tuesday, August 25, 2015 11:29 PM

I haven't seen this ever mentioned, but for another assumption that we can make, the LT-2500 that quickly superseded the LT-2400 and which was actually built for the Pennsy, probably had similar road switcher and A1A options on offer as well. 

Without a reference though, that one will have to remain an assumption. But the turnaround from it first being catalogued to it being uprated an additional 100 HP was so quick, it's surely a very safe one to assume.

I think the never built LT-2400 and the production LT-2500 even shared the same model number.

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Tuesday, August 25, 2015 11:23 PM

I do wonder if we have covered the whole list of Limas and Baldwins as well. I'm almost certain we haven't, and those models are off just one Will Davis brochure.  I just don't have any other sources I can think of to get either a list of specification numbers or proposals. Hopefully I can find some, and I would greatly appreciate anyone's help.

(Somewhat OT note on cow-calf sets: Oliver Mining's Baldwin sets were apparently a special order with the Alcos being somewhat similar; though the SSB-1 and SSB-2 were catalogued, no purchasers were found and SSB-3s and SSB-4s were not catalogued. When the SSB-9 was ordered designers must have thought "Great, now  someone decides to order a calf unit"...)

At the same time, I'll add the A1A models to the phases section unless there is any objection. Thanks for your help!

  • Member since
    November 2008
  • 1,881 posts
Posted by Leo_Ames on Tuesday, August 25, 2015 11:04 PM

For the first three I proposed (The LRS-800, the LT-1600, and the LT-2400), I'd definitely suggest using those since there's no ambiguity there.

We can safely infer what these would now be known as by railfans, had any actually been ordered and produced. 

Any idea if we've covered everything that Lima catalogued, but never built? That only 4 of the 10 models introduced in their April 1950 line was actually ever built is well known, but I'm unsure if we've accounted for all six that never saw an example constructed.

NorthWest
Since most of the point of buying cow-calf sets is avoiding the cost of the second cab, it is interesting that that was not an option. 

I'm sure that Lima would've accommodated a customer that wanted a calf at a reduced price. 

Wonder if they were ever approached? Not much, if any overlap there between EMD TR customers and those that bought Lima's. 

NorthWest
Regarding the cab unit, I may not change it as I doubt railfans would even bother with a designation.

I certainly wouldn't use my LF-3200 designation.

It never was officially catalogued and its only immediate future before Lima disappeared was going to be as a prototype, which as I recall, wasn't too far off from starting to take shape on the shop floor until Baldwin entered the picture. A name fits such a thing well, as you've said, since it was well away from entering production status although prototype construction was imminent. 

That said, LF-3200 sounds good. I'd like to think that had this actually become a production model, that it would've been classified as such by railfans when these homemade classifications were made to fill a void that Lima left behind, were created back in the 1960's. :)

Leo_Ames
For the LT-1600 and LT-2400, as you've noted, there was the option for the locomotive to be a transfer locomotive or a road switcher equipped for higher speed operation (And a hood at one end would've been extended to provide a steam generator compartment on the road switcher versions). 

Also, in addition to transfer and road switcher configurations, the 1,600 and 2,400 center cab units also had an A1A option. Not sure that has been mentioned yet. 

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Tuesday, August 25, 2015 10:45 PM

Leo, excellent thoughts.

Regarding the cab unit, I may not change it as I doubt railfans would even bother with a designation. Instead, it would probably be known as the Lima Turbine just like other turbines such as the Blue Goose and UP's turbines, which I believe had model numbers lost to common usage. Especially since any testbed produced would have run into the problems that doomed the FG9 in all likelihood, and would not have been duplicated despite Lima's insistance that it was the way to go over 1500HP. The merger with Baldwin might've killed any half built unit, too, it constuction was authorized.

As you have pointed out, the switcher combos do present problems. Since most of the point of buying cow-calf sets is avoiding the cost of the second cab, it is interesting that that was not an option. Perhaps if Oliver Mining had made a special request something would be done? LC for Lima Combo or LDS for Lima Double Switchers? I'll think more about this.

I think I prefer LRSC. I'll think more on this and create a new list tomorrow. I had to write this using [ b] tags and am out of patience for the software tonight. Dead

  • Member since
    November 2008
  • 1,881 posts
Posted by Leo_Ames on Tuesday, August 25, 2015 9:42 PM

Since Lima diesel designations are railfan creations, we can actually apply these conventions to at least some of these never sold models.

NorthWest
800 HP BB road switcher

The 800 HP road switcher would've been categorized as an LRS-800.

NorthWest
1600 HP center cab C-C road switcher/transfer

The 1600 HP center-cab transfer locomotive would've been the LT-1600.

NorthWest
2400 HP center cab C-C road switcher/transfer

The 2,400 HP transfer locomotive would've been the LT-2400.

NorthWest
3200 HP CC cab unit powered by 6 free piston generators powering a turbine.

You may not want to modify this one, but most likely, the 3,200 HP  cab unit would've been LC-3200 or LF-3200.

Lima never built a cab unit so we don't know what railfans would've gravitated towards for this one. And T for turbine is already taken by the center cab transfer models. 

I'd favor LF, both because of EMD and Alco practices for cab unit freight power, and for Free Piston.

FP for Free Piston means something else entirely in EMD and Alco parlance and likely should be avoided. 

NorthWest
1600 HP Switcher Combo

2400HP Switcher Combo

Not sure how railfans would've categorized the drawbar connected pairs of LS-800's and LS-1200's that Lima offered for transfer duties, but never sold any of except standalone examples. 

Perhaps LT-800 and LT-1200? Can't reflect their combined horsepower with these, since it conflicts with center cab transfer locomotives that were catalogued but never sold. 

And while you could borrow some EMD terminology and call them LTR's, these wouldn't of been configured as cow-calfs like their EMD counterparts. Both halves of the unit would've had the standard LS cab. 

NorthWest
1600 HP center cab C-C road switcher/transfer

2400 HP center cab C-C road switcher/transfer

For the LT-1600 and LT-2400, as you've noted, there was the option for the locomotive to be a transfer locomotive or a road switcher equipped for higher speed operation (And a hood at one end would've been extended to provide a steam generator compartment on the road switcher versions). 

While you might just want to continue to note that in your list as you have since this is pure speculation, we might've seen the rise of a different designation to denote the road switcher versions of these center cabs.

LRSC for Lima Road Switcher Centercab, perhaps? Bit of a conflict there with Alco and MLW A1A road switchers, I suppose. 

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Tuesday, August 25, 2015 8:54 PM

It is time for another update, if no one has any objections. If the formatting is a bit odd, that is because it was composed in Microsoft Word after the software deleted this post three times while I was editing it. I am not happy.

The List

GE

B18-7

U18C-North American extension of the U18B

U56

U18BT

U15BT

U33CG

B40-8(B)

C23-7

B28-7

C28-7

B23-8

B33-7

C33-7

Genesis II

U4B

U18B export unit

U18B

U10C

U20B

U26C early 16 cylinder export

EMD

DD40A

F70PHAC

SD39-DC

SD55

AMT-125

RB3600

GMDH-2

SD40-2B

GP2000

SD39-2

SDL39-2

SD59

SD49

TR12

F45B

TR9

F18

F20

G6

R

M-K

MK5000AC

MK6000AC

F-M

CFA-24

CFB-24

CPB-20

CPB-24

ALCO

PA-3

FA-4

C428

C620

C624

C636F

C636P(A)

C636P(B)

C650DH

RSD-33

SSB1 (S1 calf)

SSB2 (S2 calf)

FP3

FP6

FPC6

FP7

FPC7

RSD1B

RSC-8

RSC-31

RSD-31

C515

RS20

RSC-20

Ingalls

3-S

6-S

5-S

17A

MLW

RSC-23

RS-13

RS-24

MX412

MX415

MX612

Bombardier

HR416

HR618

HR406

Lima

800 HP BB road switcher

1600 HP center cab C-C road switcher/transfer

2400 HP center cab C-C road switcher/transfer

3200 HP CC cab unit powered by 6 free piston generators powering a turbine.

1600 HP Switcher Combo

2400HP Switcher Combo

Baldwin

1000 HP C-C Road Switcher

1500 HP C-C Road Transfer (streamlined car body)

3000 HP A1A-A1A Road Locomotive

Phases/Other

Q cab Dash-7 GEs

GE Dash 8-32C (later updated phase of C32-8 that would have been somewhat like NS's Dash 8-32Bs)

A1A EMD G16

B-B EMD G16

Early U20C with carbody similar to U13C

 

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Monday, August 24, 2015 7:38 PM

Alright, time for another update.

First off is an updated Genesis specification that GE offered once the P42DC failed to meet various specifications. It has the GEVO and a new cab design since the old one failed to meet crash safety standards when it was offered. I've dubbed it the Genesis II for lack of another model name and due to the numerous design differences.

New Export ALCOs:

RSC-8: A1A version of the DL-531

RSC-31: A1A version of the DL-534

RSD-31: C version of the DL-534

C515: This is the best model number that I can find for the DL515, which would have been a 8-251 version of the DL-531. ALCO also planned to modify this specification for two orders that it ultimately lost to other builders, one for Thailand and one for Pakistan.

RS20: B-B DL-541

RSC-20: A1A DL-51

Comments are welcome!

(This site has been lagging today and sometimes fails to log my keystrokes, so if any are missing I apologize.)

 

 

  • Member since
    November 2003
  • From: Rhode Island
  • 2,289 posts
Posted by carnej1 on Friday, August 14, 2015 11:08 AM

Leo_Ames

Sadly, I believe that I listed all the details provided by the story. I'll double check though and edit this post. 

Edit: The proposal involved a seven unit order. Here's EMD's rendering of it, which confirms that it would've been a BB, like I'm sure most would've guessed given Amtrak's struggles in the 1970's with their EMD and GE CC's. 

 

Very interesting.

Makes me wonder if a freight version; a "GP70AC", would have been technically feasible...

 

"I Often Dream of Trains"-From the Album of the Same Name by Robyn Hitchcock

  • Member since
    May 2013
  • 3,231 posts
Posted by NorthWest on Wednesday, August 12, 2015 10:35 PM

Leo, thanks for posting that. I do have to wonder whether weight would have been an issue.

M636C, I thought the SD60 had the AR20, but you are correct. Thanks!

  • Member since
    January 2002
  • 4,612 posts
Posted by M636C on Wednesday, August 12, 2015 9:46 PM

NorthWest

Leo, it would be useful to have any information from that article. Would it have been C-C? What was the maximum speed and weight of the proposal?

Based on the time period and the concurrent SD60, I suspect it would be rated at 3,800 HP without HEP parasitic load.

 

The 3800 HP limit for the SD60 was set by the AR11 alternator and not the 710G3B engine. An AC traction locomotive would not have needed the DC output of the AR series and may have had a TA series alternator relying on the traction converters to produce the DC to feed the inverters for the traction motors. So a 4000HP traction rating is likely.

The "F2" was rated at 1350HP, limited by the generator, while the same engine was capable of 1500HP in the F3.

M636C

  • Member since
    November 2008
  • 1,881 posts
Posted by Leo_Ames on Wednesday, August 12, 2015 8:35 PM

Sadly, I believe that I listed all the details provided by the story. I'll double check though and edit this post. 

Edit: The proposal involved a seven unit order. Here's EMD's rendering of it, which confirms that it would've been a BB, like I'm sure most would've guessed given Amtrak's struggles in the 1970's with their EMD and GE CC's. 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy