Posted by NKP guy on Friday, July 26, 2024 8:59 AM

Umm, you mean they don't come out of the mill with holes, but they're drilled in place? News to me. But then, I've never wondered about it before.

  • Member since
    March 2023
  • 11 posts
Posted by Reading467 on Friday, July 26, 2024 8:54 AM

NKP guy

Speaking of rails with bolt holes: how do they put those holes in the rail? They're obviously not drilled. When, in the rail-making process, does that happen, and how?

 

Umm, maybe try searching for 'rail drill'......?   Crews can torch the holes in an emergency, but drills are the preferred method. 

  • Member since
    July 2006
  • 1,530 posts
Posted by NKP guy on Friday, July 26, 2024 8:16 AM

Speaking of rails with bolt holes: how do they put those holes in the rail? They're obviously not drilled. When, in the rail-making process, does that happen, and how?

  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Monday, July 22, 2024 9:49 AM

Leo_Ames

There's lots of empty bolt holes in evidence on the St. Lawrence line for CSX. 

I noticed that several years ago, just north of Evans Mills.

I supposed that it was relay rail that was sent somewhere for welding into CWR, as opposed to being done on site.

Watched a mobile butt welder in use at Deshler not long ago when they were laying new CWR.  Box van hi-rail with a slide out that clamped over the rail and welded the two together.  It happened several times as they put in sections near the diamond.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Sunday, July 21, 2024 11:16 PM

Flash-butt welding in the field is still done by Holland, Loram, Plasser and others - but it's rare anymore to convert a whole district this way anymore. ($$$$)

Where you are more likely to see the flash-butt operation in play is on a railroad that either does not believe in boutet welding or is overwhelmed by rail failures. You frequently see 6-hole bars with only the outer 4 holes around a joint drilled, signalling a future flash but operation in the field to come later. The quality control in a rail welding plant is more reliable in most cases and de-stressing the rail is less of a concern.

Shortlines and Class-1's have different priorities and experience in dealing with welded rail. Have seen far too many failures to anchor the newly laid shortline rail cause grief shortly after a rail relay. (and using used-anchors is not saving anybody in the long run - better to buy new like the Class 1's.

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    November 2008
  • 1,881 posts
Posted by Leo_Ames on Sunday, July 21, 2024 12:37 AM

There's lots of empty bolt holes in evidence on the St. Lawrence line for CSX. 

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Saturday, July 20, 2024 11:02 PM

dpeltier

 

 
jeffhergert

The Iowa Interstate had some existing jointed rail field welded. It seems like I've heard of others do the same. I seem to recall the CN on some of it's exIC trackage in Iowa doing this, too.

Maybe the WLE wanted to replace some badly worn rail before field welding it.

 

 

I don't believe that most railroads would allow you to weld up true jointed rail without cropping the ends off each stick. The main reason is that the bolt holes for the innermost bolts of each joint would be too close to the heat-affected zone of the weld, and the stress concentrations around the holes combined with the less-than-pristine metallurgy of the HAZ could produce bolt-hole cracks. A secondary reason is the batter and cracks present at the rail ends.

Cropping off the ends, removing all the rail anchors, sliding the rail down, welding, and then reapplying anchors in the a new, welded-rail-appropriate pattern is quite a chore. It's easier to replace the rail with new welder strings and send the used rail back to a rail welding plant (or scrapped). If you aren't set up to handle strings, I guess it's still easier to lay new sticks (or good quality second-hand sticks that have already been processed) than to fart around with all that and still have your ancient crappy rail in place.

Note that when joints ARE used in welded track, the inner two holes are left undrilled and unbolted - that lets you drop the bars and weld the rail with no additional cropping (except for whatever is needed to bring the rail to the correct longitudinal stress state, i.e., "neutral temperature - and, if you're using thermite, the gap needed by the weld process itself.)

Probably somewhere in a rail yard near you, there is a section of track that was rebuilt with track panels at some point, and the inner bolt holes and bolts are missing on those joints as well - even if they will never get around to welding that rail. Track panels come that way, so that they can be bolted OR welded (or, at a derailment, bolted and then welded later). People seldom bother to drill the inner holes in the field.

Dan

 

 

 

I do believe they did crop the ends when doing the field welds.

Still, much of the rail in IAIS's case was laid in the late 60s/early 70s by the RI. When it was done, that rail probably had about 30 years of service. 

Jeff

  • Member since
    March 2011
  • 188 posts
Posted by dpeltier on Saturday, July 20, 2024 10:43 PM

jeffhergert

The Iowa Interstate had some existing jointed rail field welded. It seems like I've heard of others do the same. I seem to recall the CN on some of it's exIC trackage in Iowa doing this, too.

Maybe the WLE wanted to replace some badly worn rail before field welding it.

I don't believe that most railroads would allow you to weld up true jointed rail without cropping the ends off each stick. The main reason is that the bolt holes for the innermost bolts of each joint would be too close to the heat-affected zone of the weld, and the stress concentrations around the holes combined with the less-than-pristine metallurgy of the HAZ could produce bolt-hole cracks. A secondary reason is the batter and cracks present at the rail ends.

Cropping off the ends, removing all the rail anchors, sliding the rail down, welding, and then reapplying anchors in the a new, welded-rail-appropriate pattern is quite a chore. It's easier to replace the rail with new welder strings and send the used rail back to a rail welding plant (or scrapped). If you aren't set up to handle strings, I guess it's still easier to lay new sticks (or good quality second-hand sticks that have already been processed) than to fart around with all that and still have your ancient crappy rail in place.

Note that when joints ARE used in welded track, the inner two holes are left undrilled and unbolted - that lets you drop the bars and weld the rail with no additional cropping (except for whatever is needed to bring the rail to the correct longitudinal stress state, i.e., "neutral temperature - and, if you're using thermite, the gap needed by the weld process itself.)

Probably somewhere in a rail yard near you, there is a section of track that was rebuilt with track panels at some point, and the inner bolt holes and bolts are missing on those joints as well - even if they will never get around to welding that rail. Track panels come that way, so that they can be bolted OR welded (or, at a derailment, bolted and then welded later). People seldom bother to drill the inner holes in the field.

Dan

 

 

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Saturday, July 20, 2024 8:39 PM

The Iowa Interstate had some existing jointed rail field welded. It seems like I've heard of others do the same. I seem to recall the CN on some of it's exIC trackage in Iowa doing this, too.

Maybe the WLE wanted to replace some badly worn rail before field welding it.

Jeff

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Saturday, July 20, 2024 4:55 PM

W&LE being smaller Regional Carrier, I doubt that they own the machienry necessary for the proper laying of welded rail.  Being frugal, I suspect they don't want to spend what is necessary to hire a contractor to come in and properly lay welded rail.

I believe some of the mills manufacturing rail are making them in 78 foot lengths.  Rails from the mills of whatever length get sent to carrier rail welding plants and go out of the plant in 1440 foot lengths, which are dropped where the rail is needed for installation.  The Class 1 carriers when they install the 1440 segments into the track will follow up the installation by welding up the joints of the 1440 foot segments.  The only 'joints' that get left in the track structure are the Insulated Joints that are required for the various Signal and Crossing Protection apparatus.

Never too old to have a happy childhood!

              

  • Member since
    July 2006
  • 1,530 posts
Posted by NKP guy on Saturday, July 20, 2024 4:42 PM

timz: I'm sure you're right about the length; I rounded up.

The W&LE is considerably faster these days than previously; thirty or more miles an hour is what I'm seeing.

 

  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Saturday, July 20, 2024 4:36 PM

My discussion about superelevation was just general information and not applicable to the current W&LE discussion.

  • Member since
    February 2005
  • 2,366 posts
Posted by timz on Saturday, July 20, 2024 2:20 PM

I assume the "40' rails" are actually 39 ft? (Come to think: does any steel mill still produce 39-ft rails? If not, when were the last ones made?)

Welded rail trains are still a just quarter-mile long nowadays?

The W&LE line is 25 mph? Or less? Does seem odd that they would think welding it was worthwhile.

 

  • Member since
    July 2006
  • 1,530 posts
Posted by NKP guy on Saturday, July 20, 2024 1:25 PM

The track is straight, no curves involved in this. The east rail remains jointed, the west rail is now welded. 

Last W&LE scheduled service on this line was 1938.

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Saturday, July 20, 2024 11:40 AM

diningcar
Superelevation is designated for the priority, or preference, for either freight or passenger. If it is for passenger service the lower rail will sustain greater wear because the lower rail has the heavier loads wearing against it. If for freight the passenger trains will restrain their speed to avoid tipping over.  

WLE rails have not had scheduled passenger service this century and for most of the last century.

Never too old to have a happy childhood!

              

  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Saturday, July 20, 2024 10:39 AM

Superelevation is designated for the priority, or preference, for either freight or passenger. If it is for passenger service the lower rail will sustain greater wear because the lower rail has the heavier loads wearing against it. If for freight the passenger trains will restrain their speed to avoid tipping over.  

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Saturday, July 20, 2024 10:04 AM

Are you saying that one rail is jointed and the other is welded?

Is the track segment you are viewing on a curve or a tangent?

Is the jointed rail on the inside or outside of the curve?

On curves, normally the outside or 'high' rail will be the one that wears sooner than does the inside or 'low' rail presuming that the curves has superelevation and spirals built into it.

Never too old to have a happy childhood!

              

  • Member since
    July 2006
  • 1,530 posts
Welded rail question
Posted by NKP guy on Saturday, July 20, 2024 8:26 AM

One park I walk in has the W&LE for a border, and this summer crews have been working on the tracks, which up until now have been made of 40' rail joined together. A couple of weeks ago a number of 40' rails were dropped along the ballast and now I see they've been installed. But the new rails have been welded, not bolted, together.

This is new to me. I always thought railroads installed new, really heavy welded rail, and that it seemed to come in mile-long lengths off of rollers. I don't know if the newly installed rail is new or used, and right now only one side of the track is welded. If they weld both sides I'll miss the clickety-clack that is so Old School to me.

Doubtless I don't understand what I've been looking at, so can someone here explain this?

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy