Trains.com

Transport Canada proposes PTC for Canadian Railways

1620 views
6 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    November 2021
  • 211 posts
Transport Canada proposes PTC for Canadian Railways
Posted by JayBee on Tuesday, February 8, 2022 5:16 PM

Transport Canada has proposed requiring a PTC like system for Canadian railways which they call ETC (Enhanced Train Control) which would come in two levels. A system like the US PTC system for the high level, and a lower capability "Driver Advisory" system for trackage with fewer movements and a lower risk profile. It states that the US PTC system would be acceptable for the high level system, as a large number of Canadian locomotives are already fitted with it. 

Transport Canada notice

 

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Tuesday, February 8, 2022 9:09 PM

Fitting that you would post this today, on the anniversary of the Hinton crash.

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    February 2003
  • From: Guelph, Ontario
  • 4,819 posts
Posted by Ulrich on Friday, February 11, 2022 2:47 PM

Canada doesn't have the third largest rail network in the world.. we are behind the US, China, India, and Russia... maybe some other countries too. Not to suggest that we don't have a great railway system.. we do. 

 PTC or PTC equivalent technology in Canada.. we knew it was coming, and it was only a matter of time. At least we don't have to reinvent the wheel on this. We can look at  and copy what the Americans have done, with some adjustments, perhaps, to take into account factors that are unique to Canada. PTC, had it existed back in 1986, would likely have prevented that horrible accident near Hinton.. 

  • Member since
    October 2008
  • From: Canada
  • 1,820 posts
Posted by cv_acr on Wednesday, February 16, 2022 11:56 AM

I'm curious what the actual current criteria is for requiring/not requiring PTC on a particular line in the US?

While a majority the big railways' main lines here in Canada are CTC signalled (but some stretches used ABS and an equivalent system to track warrants), there are quite a number of shortlines and other minor lines that don't have ANY signalling whatsoever, existing as purely dark territory. I'd imagine the US is no different.

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Wednesday, February 16, 2022 12:13 PM

cv_acr
I'm curious what the actual current criteria is for requiring/not requiring PTC on a particular line in the US?

While a majority the big railways' main lines here in Canada are CTC signalled (but some stretches used ABS and an equivalent system to track warrants), there are quite a number of shortlines and other minor lines that don't have ANY signalling whatsoever, existing as purely dark territory. I'd imagine the US is no different.

The US PTC requirements center around the haulage of specific kinds of HAZMAT as well as the hauling of passengers.  

PTC has been implemented on both signalled and dark territories.

Never too old to have a happy childhood!

              

  • Member since
    December 2001
  • From: Northern New York
  • 25,019 posts
Posted by tree68 on Wednesday, February 16, 2022 12:17 PM

cv_acr
I'm curious what the actual current criteria is for requiring/not requiring PTC on a particular line in the US?

Well, I didn't stay at that hotel last night, but as I recall from various conversations, in simplest terms, hazmat and passengers.  

There may also be a traffic threshold, either on its own, or tied in with pax and HM.  This would explain why shortlines might be exempted, as well as tourist lines.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    July 2010
  • 351 posts
Posted by ns145 on Wednesday, February 16, 2022 12:49 PM

From FRA's website:

With limited exceptions and exclusions as described within Subpart I potentially available, PTC is required to be installed and implemented on Class I railroad main lines (i.e., lines with over 5 million gross tons annually) over which any poisonous- or toxic-by-inhalation (PIH/TIH) hazardous materials are transported; and, on any railroad’s main lines over which regularly scheduled passenger intercity or commuter operations are conducted.  It is currently estimated this will equate to approximately 60,000 miles of track and will involve approximately 20,000 locomotives.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy