I thought about using Google Satellite View to get an estimate, but figured someone here would know the answer. Sounds like I could use Atlas 25 degree diamonds for the closest match.
Brian (IA) http://blhanel.rrpicturearchives.net.
blhanelWhat's the approximate angle of the Rochelle diamond frogs?
There are actually curves on both approaches.
A satellite view will show you how tight they actually are better than the webcam.
Larry Resident Microferroequinologist (at least at my house) Everyone goes home; Safety begins with you My Opinion. Standard Disclaimers Apply. No Expiration Date Come ride the rails with me! There's one thing about humility - the moment you think you've got it, you've lost it...
Definately not 90 degrees - visually it looks somewhere between 60 & 75 degrees.
Never too old to have a happy childhood!
What's the approximate angle of the Rochelle diamond frogs? I did a search of the forums for the answer, and all I could find was a thread where I asked the same question 10 years ago and didn't get an answer. I just retired two weeks ago, and I'm ready to start planning a large HO-scale model RR in my basement that will incorporate the Rochelle diamonds in it.
I just saw this bit of info and would this impact stacks going through Chicago? Can this mean more traffic through Rochelle?
The Heartland Intermodal Gateway terminal in Prichard West Virgina, halfway between the Port of Virginia and the rail yards of Chicago on Norfolk Southern’s Heartland Corridor, is the first ever in the state.
http://bit.ly/1MEQHtL
This link is through facebook skips the log in, with pictures and more detailed information.
Any idea of when the New Signals will be activated and the old signal bridges removed?
I think it was part of the Del Monte complex...if not, it was another produce-related warehouse.
Carl
Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)
CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)
Semper Vaporo Jim611 Are they tearing down the building on the other side of the diamond? Previous posts here indicate that is so. Also, notice what appears to be roof weatherproofing membrane has blown over, and is dangling from, the northeast wall, which tells me that the roof structure has been removed and the only thing left is that wall itself.
Jim611 Are they tearing down the building on the other side of the diamond?
Are they tearing down the building on the other side of the diamond?
Previous posts here indicate that is so. Also, notice what appears to be roof weatherproofing membrane has blown over, and is dangling from, the northeast wall, which tells me that the roof structure has been removed and the only thing left is that wall itself.
What company did the building previously house?
Thanks Semper
Semper Vaporo
Pkgs.
BNSF main is pretty busy right now.
Thanks Semper Vaporo, that's what I've been doing all along, so the problem must be at my end (or perhaps someone's blocking 'overseas' viewing). I'll have to take a look under the hood [gets out greasy overalls and spanner ...]
CShaveRR ChuckCobleigh After the WB cleared, an EB UP came through, one unit, four or five flats with UP trailers. That was it. Customer power! I think you meant to say "UPS" trailers. They came through here about a half-hour ago. One SD70M, five TOSC (trailers on spine cars). Somebody must have dropped the ball somewhere (not necessarily UP), and UP is attempting to get the packages to their sort. Balt, the midtrain DPUs you saw may have been your first, but they were far from the first on this line. I think I saw them on manifest before I saw any on intermodal.UP's special instructions had rules for train makeup, including complicated instructions and ratios for placement of loads and empties in the train. Not very helpful to anyone actually making up said train, but someone in an office who can graphically analyze the train's makeup just in tme for the EOT to disappear around the bend. Havng said that, I haven't cracked the ol' book recently to see whether plunking power into the middle of a train affects these rules, or whether there is any mention of DPUs in any position. Jeff?
ChuckCobleigh After the WB cleared, an EB UP came through, one unit, four or five flats with UP trailers. That was it. Customer power!
After the WB cleared, an EB UP came through, one unit, four or five flats with UP trailers. That was it. Customer power!
I think you meant to say "UPS" trailers. They came through here about a half-hour ago. One SD70M, five TOSC (trailers on spine cars). Somebody must have dropped the ball somewhere (not necessarily UP), and UP is attempting to get the packages to their sort. Balt, the midtrain DPUs you saw may have been your first, but they were far from the first on this line. I think I saw them on manifest before I saw any on intermodal.UP's special instructions had rules for train makeup, including complicated instructions and ratios for placement of loads and empties in the train. Not very helpful to anyone actually making up said train, but someone in an office who can graphically analyze the train's makeup just in tme for the EOT to disappear around the bend. Havng said that, I haven't cracked the ol' book recently to see whether plunking power into the middle of a train affects these rules, or whether there is any mention of DPUs in any position. Jeff?
Carl, reading the SSI on this is enough to make your head hurt. DP helps in some respects but can cause other restrictions. Many variables go into it including total train tonnage, types of cars, weight of car and type of train. Heavy grade can also figure in car placements in trains.
Every so often a train slips through with an error. If it's not too serious, time and intials will usually cover it to the first yard where it can be switched. (Which is defined as the first place it's scheduled to be switched. Not necessarily the first yard where it could be switched. Sometimes that yard is the train's destination.) Run through trains sometimes may meet requirements on the originating carrier, but not on the UP. In those cases, they can automatically be operated (not to exceed 45mph) to the first point they can be (See earlier note) switched.
The computer is supposed to catch problems when the yard train-sets the paperwork. Key words are, "supposed to."
Jeff
AgentKid The last hour and a half have been quite amazing. There hasn't been a single train on either line that wasn't intermodal. I have lost count. Clearly both RR's are working flat out to get the last of the Christmas presents into the stores ASAP. Bruce
The last hour and a half have been quite amazing. There hasn't been a single train on either line that wasn't intermodal. I have lost count. Clearly both RR's are working flat out to get the last of the Christmas presents into the stores ASAP.
Bruce
One has been flat out trying to hold on to a UPS contract, keeping it out of the hands of the other.
So shovel the coal, let this rattler roll.
"A Train is a Place Going Somewhere" CP Rail Public Timetable
"O. S. Irricana"
. . . __ . ______
Sorry ... saw the word Rochelle and quit reading :) The link above is what I have been using ro Roanoke it downloads a link that opens Windows Media Player.
For the Roanoke webcam try this link:
128.173.197.94:443/RRCmov
This SHOULD open a Windows Media Player window to the webcam. I just tried it and it is working this morning. Don't just click on the above link... copy and paste (or type) it into a new window address text bar.
Thanks for responding rdamon. Are you sure it's the Roanoke and not the Rochelle video (I only posted on here, because I didn't want to start a new thread)? The Roanoke video uses a plug-in that isn't supported by standard Chrome, so I have to view it using IE (or directly from Windows Media Player).
Working fine for me. W10 Chrome (Latest Update)
Nothing to do with the Rochelle webcam (sorry), but the Roanoke webcam has been down for over a week (unless it's a glitch at my end?). I realise it's nothing to do with Trains, who are just providing a helpful link, but does anyone have any info?
CShaveRRI think you meant to say "UPS" trailers.
Indeed I did. Haste.
EB UP manifest just passed. Head end was 30 or more autoracks, then about 50 or 60 large covered hopper, routine manifest car types for 50 or 60 cars, midtrain DPU and then another 70 or 80 manifest.
First time I have seen a midtrain DPU on the UP. If the cut of covered hoppers were loads, I can only imagine the train handling problems of operating a train with that massed weight in the middle of the train.
rdamon Looks closed in the 2007 street view https://goo.gl/maps/UUNta4iZvxM2 Looks like the map car had to wait for a train to pass .. the lights were still on.
Looks closed in the 2007 street view
https://goo.gl/maps/UUNta4iZvxM2
Looks like the map car had to wait for a train to pass .. the lights were still on.
What was the business that operated the building?
tree68 Just looked in in time to see a WB BNSF tank train clear the diamonds, and to see a WB UP train (a stacker on the "wrong" track) get started after having to wait for the BNSF train. Loud noises can be heard in the background.
Just looked in in time to see a WB BNSF tank train clear the diamonds, and to see a WB UP train (a stacker on the "wrong" track) get started after having to wait for the BNSF train.
Loud noises can be heard in the background.
After the WB cleared, an EB UP came through, one unit, four or five flats with UPS trailers. That was it. Customer power!
EDIT: I lost my 'S' on the way to writing the post. Carl figured it out.
Do you know what plans the city has for the land?
That whole building should be coming down now. I drove by yesterday and they had an excavator knocking down everything and loading it up in trucks. The city of Rochelle has been talking demo-ing it for a few years now, glad they are finally doin it.
Our community is FREE to join. To participate you must either login or register for an account.