Trains.com

Major Derailment on Sandpatch

20918 views
66 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Major Derailment on Sandpatch
Posted by beaulieu on Saturday, February 6, 2010 11:59 PM
CSX had a major derailment, possibly the result of a runaway, very early Saturday morning or very late Friday night. EB coal train U883-03 derailed two locomotives and 113 of 131 cars between MP201 and MP203. This is around the Glencoe Rd. crossing. Some of the cars are in Wills Creek. The crew is shaken up, but ok. Both tracks are blocked and Sandpatch is expected to be closed for at least 48hrs.
  • Member since
    February 2002
  • From: Muncie, Indiana...Orig. from Pennsylvania
  • 13,456 posts
Posted by Modelcar on Sunday, February 7, 2010 8:25 AM

Boy, that sounds like real trouble for CSX.....Wonder if it was weather related....{frozen brake lines, limbs down on track or something brought on by the extreme weather that included that area too.

That will take some time and expense to clear that amount of derailed cars....That's rugged country in that area.

Quentin

  • Member since
    August 2005
  • 445 posts
Posted by Kootenay Central on Sunday, February 7, 2010 12:57 PM

.

  • Member since
    December 2001
  • From: Northern New York
  • 25,021 posts
Posted by tree68 on Sunday, February 7, 2010 8:48 PM

Any word on an official cause?  And how's the clean-up coming along?

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    May 2005
  • From: S.E. South Dakota
  • 13,569 posts
Posted by Murphy Siding on Sunday, February 7, 2010 9:37 PM

     Did that area see heavy snowfall recently, like Washington D.C. (and all the rest of us) ?

Thanks to Chris / CopCarSS for my avatar.

  • Member since
    March 2003
  • From: US
  • 3 posts
Posted by Midland524 on Sunday, February 7, 2010 10:00 PM

1.Hopefully everyone was awake. 2.Hopefully nobody was texting their girlfriend.

  • Member since
    February 2009
  • 402 posts
Posted by BT CPSO 266 on Sunday, February 7, 2010 10:05 PM

 I did here there was a derailment, but I thought it was miner. The Capitol Limited was forced to stop on the line Friday, because of down trees.

 

  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Monday, February 8, 2010 8:55 AM
Some photographs I saw from Cumberland suggest that they got quite a bit of snow in the area. I suspect that the weather was somehow a contributing factor.

I haven't seen photographs of the actual wreck yet. That's another suggestion that the weather's none too good up there.

Today is at least two days after the wreck--restoration of the line ought to be well on the way, if it isn't already open.

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Posted by beaulieu on Monday, February 8, 2010 9:05 AM

CShaveRR
Some photographs I saw from Cumberland suggest that they got quite a bit of snow in the area. I suspect that the weather was somehow a contributing factor. I haven't seen photographs of the actual wreck yet. That's another suggestion that the weather's none too good up there. Today is at least two days after the wreck--restoration of the line ought to be well on the way, if it isn't already open.

 

 There is a rather poor picture of the derailment accompanying this local news story, but it should give you some idea of the amount of work that Hulcher and R.J. Corman are facing. Reportedly two response teams from each company were summoned because of the size of the derailment and the difficult conditions.

 Somerset Daily-American story

 

  • Member since
    September 2002
  • From: Back home on the Chi to KC racetrack
  • 2,011 posts
Posted by edbenton on Monday, February 8, 2010 9:20 AM

I have cash that is saying somewhere in that train was a frozen brake.  That and extra weight from all the snow this stuff was basically Donner Cement that was falling.  You take 14K tons of train add another 2K of snow and then make the rails slicker than snot with moisture no then only give them 2 units to get down the mountian in freezing temps are you nuts. 

Always at war with those that think OTR trucking is EASY.
  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Monday, February 8, 2010 9:25 AM
Thanks, John (and KC, for posting the same link earlier). It almost looks like they could use an archaeologist up there!

(Oh...thank you, too, Norris!)

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    February 2002
  • From: Muncie, Indiana...Orig. from Pennsylvania
  • 13,456 posts
Posted by Modelcar on Monday, February 8, 2010 11:35 AM

CShaveRR
I haven't seen photographs of the actual wreck yet. That's another suggestion that the weather's none too good up there.

 

Carl......I just sent you a Somerset DailyAmerican page of said CSX wreck.  You can certainly tell from the included photo, there was plenty of snow....I'd say up to 2' or more....100 plus cars included in the wreck will be major.....

Quentin

  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Posted by beaulieu on Monday, February 8, 2010 11:35 AM
More information coming in that the derailed cars are scattered over a longer area suggesting that they didn't all come off at once,. For Edbenton, likely you are correct about ice in the trainline, but almost certainly at more than one location. When the train brakes are put in emergency, the EOTD (End of Train Device) will also initiate an emergency application from the rear too. The locomotives reportedly came off the rails at 65 mph. in a curve.
  • Member since
    September 2002
  • From: Back home on the Chi to KC racetrack
  • 2,011 posts
Posted by edbenton on Monday, February 8, 2010 12:00 PM

Ice in the line even if the EOT was told to set the brakes FORGET IT will not happen.  See the ice acts like someone turn the anglecock between the cars and your done.  Now imagine that you have that in 4-5 spots your talking about no way in HELL would they have been able to stop or contrl this monster.

Always at war with those that think OTR trucking is EASY.
  • Member since
    April 2001
  • From: US
  • 2,849 posts
Posted by wabash1 on Monday, February 8, 2010 2:06 PM

ROFLAC

  • Member since
    May 2005
  • From: S.E. South Dakota
  • 13,569 posts
ROFLAC ?
Posted by Murphy Siding on Monday, February 8, 2010 2:18 PM

AFLAC!!! (Duck redux) by Nikographer [Jon]. Y.E.onDOMReady(show_notes_initially);  

ROFLAC?   Is that the same thing as AFLAC?

  wabash1:  Do I sense that you pehaps disagree with something written above?

 

Thanks to Chris / CopCarSS for my avatar.

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Monday, February 8, 2010 2:28 PM

Knowing about as much as anyone else does at this point (nothing really), I hate to go out on a limb.  I couldn't live with myself if I knew that I caused brother Wabash to pull a muscle while rolling around like that.Wink  So here goes.

Does anyone know what the temperature was?  I'm thinking less along the lines of ice in the train line.  More that maybe the temp caused the air hose gaskets to leak.  I don't know how they operate down the hill, but if they release the air they may not get a good recharge of the train line before the next set.  If they had stopped to cut off helpers, they may not have had a good charge in the train line to begin with.  In effect they piddled (PC version) away their air.

Will just have to wait and see.

Jeff 

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Monday, February 8, 2010 3:07 PM

The January 30, 2000 runaway derailment of a CSX coal train on the same grade appears to be superficially similar - except that train was only 80 cars instead of the 131 or 64 % more here - and had 3 locomotives, albeit without dynamic brakes on 2 of them, as against only 2 here.  Here's the link to the NTSB's report on that event: 

http://www.ntsb.gov/publictn/2002/RAR0202.pdf  

Title: Railroad Accident Report: Derailment of CSX Transportation Coal Train V986-26 at Bloomington, Maryland, January 30, 2000

NTSB Report Number: RAR-02-02, adopted on 2/5/2002 [Summary | PDF Document]

NTIS Report Number: PB2002-916302

From the top of page 13:

''The first unit, CSXT 806, was an SD80MAC; BNSF 9481 was an SD70MAC; and CSXT 8666 was an SD50.  On these units, maximum dynamic braking is achieved when the locomotive is traveling between 4 and 24 mph. The maximum dynamic braking effort is 96,000 pounds for an SD80MAC, 81,000 pounds for an SD70MAC, and 60,000 pounds for an SD50. 

The accident train had 80 coal cars, all of which were high-side 'bathtub' gondola cars designed for unit coal train service.  [snip]

According to the CSXT consist list, the train was 4,145 feet long (the length of the combined cars was 3,920 feet). The trailing tonnage (the cars only) was 10,569 tons, and the tons per operative brake [FN 27] was 132.

[FN 27] Tons per operative brake is the total trailing tonnage divided by the number of freight car brake control valves, which usually corresponds to one per car, as in this case.''

From page 27 of the report [emphasis added - PDN]:

''Dynamic braking on the two trailing locomotive units, while available, could not be activated because of the defective multiple-unit cable between the first and second locomotive unitsBecause he did not have the benefit of full dynamic braking, the engineer had to increase the air brake application beyond what normally would have been expected in order to control speed.  By so doing, he unwittingly overheated the tread-brake system.  Further, the maximum authorized speed for the accident grade had been established based on the assumed availability and use of dynamic braking.  Judging from the CSXT.s experience of successfully negotiating 17-mile grade at the maximum authorized speed, the combination of dynamic and air braking was, in fact, adequate to hold a train at or under the established maximum authorized speed as the train progressed down the grade.  The Safety Board concludes that if all the available dynamic braking could have been activated on the accident train, the derailment probably would not have occurred.

Unfortunately, problems can occur when, as in this accident, the dynamic braking system functions only partially or suddenly and unexpectedly fails when the train is moving too fast to be stopped by the air brakes alone.  Calculations and dynamometer testing confirmed that CSXT eastbound loaded coal trains on 17-mile grade could not be controlled or stopped at the maximum authorized speed without the use of significant dynamic braking. The Safety Board concludes that by using the effects of dynamic braking in its speed calculations, CSXT established a maximum authorized speed over and down 17-mile grade that was too high to ensure that heavily loaded trains could be stopped using air brakes alone.''

It will be most interesting to see what the investigation of this accident reveals.

- Paul North.

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Posted by beaulieu on Monday, February 8, 2010 3:07 PM

jeffhergert

Knowing about as much as anyone else does at this point (nothing really), I hate to go out on a limb.  I couldn't live with myself if I knew that I caused brother Wabash to pull a muscle while rolling around like that.Wink  So here goes.

Does anyone know what the temperature was?  I'm thinking less along the lines of ice in the train line.  More that maybe the temp caused the air hose gaskets to leak.  I don't know how they operate down the hill, but if they release the air they may not get a good recharge of the train line before the next set.  If they had stopped to cut off helpers, they may not have had a good charge in the train line to begin with.  In effect they piddled (PC version) away their air.

Will just have to wait and see.

Jeff 

 

Ten years and one week ago to the day, on the nearby Seventeen-mile grade they had a fatal runaway accident. In that case the Engineer let the speed build up a little too high  (on the order of 5 mph IIRC) and the trains brakes burned out. An emergency application just speeded up the process. Mountain grades are very unforgiving. I think it unlikely that he wasted his air, since they are carefully warned about that little trap, but anything is possible. Do all locomotives now have the Dynamic Brake Hold feature on an Emergency Brake application?

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Monday, February 8, 2010 3:38 PM

Paul_D_North_Jr

The January 30, 2000 runaway derailment of a CSX coal train on the same grade appears to be superficially similar - except that train was only 80 cars instead of the 131 or 64 % more here - and had 3 locomotives, albeit without dynamic brakes on 2 of them, as against only 2 here.  Here's the link to the NTSB's report on that event: 

http://www.ntsb.gov/publictn/2002/RAR0202.pdf  

Title: Railroad Accident Report: Derailment of CSX Transportation Coal Train V986-26 at Bloomington, Maryland, January 30, 2000

NTSB Report Number: RAR-02-02, adopted on 2/5/2002 [Summary | PDF Document]

NTIS Report Number: PB2002-916302

From the top of page 13:

''The first unit, CSXT 806, was an SD80MAC; BNSF 9481 was an SD70MAC; and CSXT 8666 was an SD50.  On these units, maximum dynamic braking is achieved when the locomotive is traveling between 4 and 24 mph. The maximum dynamic braking effort is 96,000 pounds for an SD80MAC, 81,000 pounds for an SD70MAC, and 60,000 pounds for an SD50. 

The accident train had 80 coal cars, all of which were high-side 'bathtub' gondola cars designed for unit coal train service.  [snip]

According to the CSXT consist list, the train was 4,145 feet long (the length of the combined cars was 3,920 feet). The trailing tonnage (the cars only) was 10,569 tons, and the tons per operative brake [FN 27] was 132.

[FN 27]

Tons per operative brake is the total trailing tonnage divided by the number of freight car brake control valves, which usually corresponds to one per car, as in this case.''

From page 27 of the report [emphasis added - PDN]:

''Dynamic braking on the two trailing locomotive units, while available, could not be activated because of the defective multiple-unit cable between the first and second locomotive unitsBecause he did not have the benefit of full dynamic braking, the engineer had to increase the air brake application beyond what normally would have been expected in order to control speed.  By so doing, he unwittingly overheated the tread-brake system.  Further, the maximum authorized speed for the accident grade had been established based on the assumed availability and use of dynamic braking.  Judging from the CSXT.s experience of successfully negotiating 17-mile grade at the maximum authorized speed, the combination of dynamic and air braking was, in fact, adequate to hold a train at or under the established maximum authorized speed as the train progressed down the grade.  The Safety Board concludes that if all the available dynamic braking could have been activated on the accident train, the derailment probably would not have occurred.

Unfortunately, problems can occur when, as in this accident, the dynamic braking system functions only partially or suddenly and unexpectedly fails when the train is moving too fast to be stopped by the air brakes alone.  Calculations and dynamometer testing confirmed that CSXT eastbound loaded coal trains on 17-mile grade could not be controlled or stopped at the maximum authorized speed without the use of significant dynamic braking. The Safety Board concludes that by using the effects of dynamic braking in its speed calculations, CSXT established a maximum authorized speed over and down 17-mile grade that was too high to ensure that heavily loaded trains could be stopped using air brakes alone.''

It will be most interesting to see what the investigation of this accident reveals.

- Paul North.

This is not the same grade.  Bloomington, MD is on the Mountain Sub and a part of 17 Mile Grade.  This incident occured on the Keystone Sub on Sand Patch Grade.  For Eastbound trains like this one, the helper that was attached to the train at Connellsville is detached at Sand Patch which is the crest of the grade Eastbound.

Never too old to have a happy childhood!

              

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, February 8, 2010 4:08 PM

]

Paul: 

1. You mentioned only two units on front. Do you know their eng #s and if they were ACs or DCs? 

2.  you made me think that maybe this current wreck they were in either partial or full dynamics and maybe one, or more than one traction motors began having progresively occuring ground faults due to snow ingestion?

The engineer applies additional brake pipe reductions but before they take effect the train suddenly picks up speed and exceeds the critical speed? 

With all the reported snow ground faults are definitely a possibility. The heavy snow on possibily 132 tons per operative brake. Take a posible brake problem this wreck may be a combination failure any one item might not have caused the accident but putting all together --------?

quote user="Paul_D_North_Jr"]Unfortunately, problems can occur when, as in this accident, the dynamic braking system functions only partially or suddenly and unexpectedly fails when the train is moving too fast to be stopped by the air brakes alone[/quote][quote user="Paul_D_North_Jr"]

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Monday, February 8, 2010 4:38 PM

In the Sand Patch incident both engines were GE AC's....one Heavy and one 'regular'.

Never too old to have a happy childhood!

              

  • Member since
    July 2004
  • 803 posts
Posted by GP40-2 on Monday, February 8, 2010 10:56 PM
Murphy Siding

     Did that area see heavy snowfall recently, like Washington D.C. (and all the rest of us) ?

Almost 3 feet of snow, more on the way. The Allegheny Mountains in southwest PA typically receive around 150" of snow each winter.
  • Member since
    February 2001
  • 415 posts
Posted by bbrant on Tuesday, February 9, 2010 7:49 AM

Like GP40-2 said, we have about 3 feet of snow here in Somerset and surrouding area.  Temp on Saturday was low teens.  At the time of the derailmen the snow would've been coming down at a good clip and, most likely, would've been closer to 2 feet on the ground.

  • Member since
    May 2004
  • From: Valparaiso, In
  • 5,921 posts
Posted by MP173 on Tuesday, February 9, 2010 11:17 AM

Paul:

Thanks for the link for the STB report on the derailment.  I read the entire document.  What a horrible feeling that must be for the crew to realize you have no control. 

 Please understand that a) I am not a railroader and b) and live in Indiana where we have very few grades.

Is it now mandatory or common practice that the engineer will have real time indications of the functions of the dynamic braking system or all units?  That seems to be the root of the problem in the earlier accident (unless I am misreading/misunderstanding).

What determines an engineer's train handling plan when accepting such a coal train on a mountain grade.  Are there rules of thumb, regarding dynamic brake/airbrake use?  I understand the maximum speed is listed by timetable (revised after the accident) and there are maximum allowable amounts of air reduction, but how does an engineer safely move 15,000tons of lading down 17 miles of 2.0 percent grade or more?  Will an experienced engineer understand the tonnage/horsepower (perhaps braking capacity) and have a plan?  How much does weather play into the movement?  

Does an engineer have mental guidelines (such as at MP173 I need to have the train at ____ speed)?

Mountain railroading and mountain driving of tractor trailers require a special mindset and respect.

Ed

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Tuesday, February 9, 2010 11:46 AM

I'm not a locomotive engineer either, so I'll gladly defer to those who are, to answer those portions of your questions.  EDIT - Also, I have no detailed knowledge of CSX's operations over those grades, so again I'll defer to those that do, or have access to such information. 

In the meantime, the portions of the NS and CR timetables that I referenced and linked to over on this concurrent thread - Break [sic] checks @ Gallitzin, PA, at - http://cs.trains.com/trccs/forums/t/168584.aspx - may answer some of your questions.  That's only about 12 miles of 1.4 to 1.8 percent grades, with the first mile at 2.36 percent - but it's still a potentially dangerous mountain grade.  But it seems to be a lot like how porcupines make love - ''Very carefully''.  The January 1985 Trains article by Fred Frailey that I also referenced has about a page's worth of text on it - though spread over several pages, so it's hard to summarize.  Basically, it's stop, check the brakes, and proceed slowly.  If there is any doubt at all - 'Safety is of the first importance'.  The Superintendent then had rules and apparently enough supervisory staff to help the trainmen check out questionable situations - I recall a quote something like, ''If a train has trouble on that mountain, I want someone there to help it - even if it's the ConRail police.''  Frailey also described a train that had an undesired emergency brake application - the Road Foreman of Engines and a Trainmaster supervised a lengthy brake test at the Gallitzin summit before the train was allowed to proceed.  It doesn't hurt at all that there are like 6 to 8 helper sets on duty on that mountain based at Cresson at most times, so they can be added to the front or rear almost 'as needed' or wanted.  The proof , though, is in the experience/ history - no runaways that have led to derailments in recent history there (''Praise be to God and Allah'', ''Knock on wood'', etc.)

- Paul North.

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Tuesday, February 9, 2010 2:38 PM

I am not an engineer, but have had a lot of time riding the head end and questioning Engineers about their craft.

Operating trains, especially in difficult terrain, is a very 'formulaic' operation with a number of 'measuring marks' as the train progresses along the terrain. ie.

20 car lengths past the crest initiate a 10 pound brake pipe reduction and go from power to dynamic braking.

50 car lengths past the crest speed should be 15 MPH and 600 amps reading on dynamics

entire train over crest speed 15 MPH and 900 amps on dynamics 

MP 3 from crest a flat section can let speed increase to 20 MPH releasing dynamics.

MP 5 from crest begins another decent, activate dynamics again to reduce speed to 12 MPH and let dynamics build to 1000 amps and train will maintain 15 MPH  to MP 7.

 

So on an so forth as the train progresses....this knowledge is part of what it means for a Engineer to be qualified on a particular territory and it is not knowledge that gets taught from a book....Variations from the expected conditions at any point are the things that generate alarm to the Engineer that the train may have some problems....the train may be going too slow or too fast, the normal brake pipe reduction may not have the expected effect on train speed, dynamic brake application may not have the expected retardation, the use of power to drag the train through a sag may not be able to maintain the expected speed with the brakes applied through the train....those and 1001 other things that speak to the engineer on his abilities to handle THIS PARTICULAR train.  Each train is it's own adventure.

Never too old to have a happy childhood!

              

  • Member since
    February 2002
  • From: Muncie, Indiana...Orig. from Pennsylvania
  • 13,456 posts
Posted by Modelcar on Tuesday, February 9, 2010 2:40 PM

.....And that east 12 mile grade of up to 1.8% {in general}, contains plenty of curves including Horseshoe that rate severe attention.

Quentin

  • Member since
    October 2008
  • From: Calgary
  • 2,047 posts
Posted by cx500 on Tuesday, February 9, 2010 2:50 PM

 You might find this report on a runaway on CPR back in the late 1990s of interest.  The crews were very familiar with SD40-2s, but the new AC4400s were a major technological leap.  Not all the differences were fully appreciated.  In the SD40s, when the lever was set for dynamic brake, the dynamic brake would work.  Not necessarily so with the AC4400s.....  They had come to a stop with an emergency brake application, which had automatically cancelled the DB. Unknown to the crew, the microprocessor required to be reset by moving the throttle out of the DB position before the DB would be restored into operation.  Shortcutting the operating rules, but expecting the DB would control the train as usual while the brake line was recharged, they released the brakes.  The microprocessor refused to allow the DB to operate, the air was not enough to hold the train, and they had a wild ride down the Field Hill.  The units stayed on the track, but all the train except the front drawbar was scattered around various curves.  That particular gap in training was instantly widely known!

John

 

http://www.tsb.gc.ca/eng/rapports-reports/rail/1997/r97c0147/r97c0147.asp

 

Sorry - you might have to cut and paste to get this link to work properly - I haven't figured out  the correct method.

  • Member since
    May 2004
  • From: Valparaiso, In
  • 5,921 posts
Posted by MP173 on Tuesday, February 9, 2010 3:08 PM

Balt:

Thanks for the explanation.  I sort of understand how dynamic brakes work...dont ask for a two page single spaced report, but the concept is in my mind. 

Let's say a heavy train is heading down a mountain grade.  Ok, assume it is a 15000 ton coal train.  Is it safe to assume that the engineer will need both dynamic brakes and air brakes for controlling the speed on a 2% grade?  I think so, but again...I am a non railroading Hoosier.

Lets say you have a .5% grade.  Will dynamic brakes hold the train in check?  What I am trying to sort out is how much each type of braking system applies to train movement.  Ok, I realize each train and each engineer is different and will have their own system or method and more than likely change that based on how the train is handling. 

Perhaps what I am attempting to visualize is what role do dynamic brakes apply in train handling?  Is it best not to use air if possible???using the dynamics to stay away from air brake applications?

Perhaps better, is there a Dynamic Braking for Dummies section out there for me to read?

Fascinating stuff.

Ed

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up