Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

How would you design a 4 X 8 foot HO layout ?...

20049 views
67 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    August 2005
  • From: Southeast Texas
  • 2,392 posts
How would you design a 4 X 8 foot HO layout ?...
Posted by Tracklayer on Thursday, September 28, 2006 10:20 PM

If you only had room for a 4 X 8 foot HO layout and about a thousand dollars to spend on it, how would you design it ?. Keep in mind that trains of all eras will be ran on it at one time or another so please don't design it for one particular time period. Have fun...

Tracklayer

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, September 28, 2006 11:09 PM
I would spend the first 60-80 dollars on books which would allow me to ask a more informative question. Your question indicates more of a toy train bent than that of a modeller. This is my honest response and is not meant to offend.
  • Member since
    October 2004
  • From: St. Louis, MO
  • 941 posts
Posted by river_eagle on Thursday, September 28, 2006 11:19 PM
maybe look at the woodland scenics kits, like the riverpass kit.
When in doubt, rule #1 applies  Central Missouri Railroad Association cmrraclub.com
  • Member since
    September 2006
  • 20 posts
Posted by dw57 on Thursday, September 28, 2006 11:37 PM
I know that plywood comes in 4x8 sheets, but if you can find room for5x8, it makes it alot easier to have 22 inch radius. Iguess if I had a thousand $$ to spend it would probably cost me 1500 if you know what I mean.   LOL  I also think woodland scenics is the place to start, but not the only place. With a little thought on your structures you can model different eras without much change.
  • Member since
    January 2006
  • From: Northeast OH
  • 2,268 posts
Posted by NeO6874 on Thursday, September 28, 2006 11:46 PM
with $1000 and a 4x8 i would.... um... run trains!

on a serious note though, I would use either books, or some of the (freely) available track planning software to find/create a layout to my liking - and that provides the option of expansion at a later date. 

I would then probably ask members of the forums to take a look, and point out something that I could have/should have done (with regard to the design) to make a more interesting and/or more reliable layout.

I would then get myself said sheet of plywood, roadbed, track, wire, soldering iron, solder, and whatever else I would need to get started with the building phase. I would also get a DCC system (probably the Digitrax one... that one looks best for me - personal preference), a loco kit, some rolling stock, structures, and whatever else i need for the kits...

after that, build my layout, build my kits, and start operations on the <insert RR name here>.

most importantly i would HAVE FUN! Cool [8D]

-Dan

Builder of Bowser steam! Railimages Site

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, September 28, 2006 11:49 PM
Make it a 2x16 and have a shelf switching layout Cool [8D]
  • Member since
    November 2002
  • From: Colorado
  • 4,075 posts
Posted by fwright on Thursday, September 28, 2006 11:53 PM
 Tracklayer wrote:

If you only had room for a 4 X 8 foot HO layout and about a thousand dollars to spend on it, how would you design it ?. Keep in mind that trains of all eras will be ran on it at one time or another so please don't design it for one particular time period. Have fun...

Tracklayer



I'm sorry, I'm not biting.  I'd be very happy to present my ideas for a 4x8 layout plan for a specific region and era.  But I design around a theme.  The track plan, the operational plan, the scenery, the structures, the locomotives, and the rolling stock should all tie together to promote the theme of the layout.  The same scenery and structures will not be very convincing for a different region and era. 

To me, if you do not have a theme for a model railroad then you might as well just put up display tracks for your trains.  That is not to say your theme cannot change.  But to carry off the change convincingly requires a lot of extra $$ for not only extra sets of trains, but separate sets of structures, vehicles, and little people.  Nor am I saying not to run a totally out of theme train just for the fun of it.  But, since you mentioned a fairly tight budget figure, it seems to me an easy way to help stay within budget is to buy only locomotives, rolling stock, structures, little people, etc that support your theme.  Sell what doesn't fit to improve and buy what will.

I was once foolish enough to believe that I could set my layout back 100 years, and let it advance one year for every real year that passed.  I know the owner of the Utah Belt does it, but he spends a lot of time and money keeping current - time and money I don't have.  And he only changes time - not place, region, purpose, or other thematic elements.

Last thought, and I'm done preaching.  This is my preference.  If you have only a small space (4x8 and smaller in HO), you need to think small.  As in short lines.  As in small engines and rolling stock.  As in short trains and smaller structures.  All of which lends itself to focusing on a early 1950s era or earlier, with earlier usually being more convincing.  An 1870s six car train of 28ft cars headed by a 4-4-0 looks much more realistic on a 4x8 and 18" radius curves than do modern 6 axle diesels with 65ft bulkhead flats and 4 bay hoppers.

yours in planning
Fred W


  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, September 29, 2006 1:21 AM

Since I don't have a layout myself, I'll just tell you what I would do with $1K and a 4x8 HO setup - I'd keep the scenery simple and get a double-loop with an inside yard. I'd spend the money on the trains themselves, figuring if I enjoy the trains I'll slowly add scenery and realism, but initially I'd want to have trains running (one freight, one passenger) and maybe a switch engine in the yard with a few extra freight cars.

The guy who admits he'd spend $1500 is right, either build a $900 set and give yourself $100 in contingency money or plan on sending just over $1000, maybe $1100-1200 to get what you had in mind for your $1K.

Will kids be running this, just you, etc?

  • Member since
    August 2004
  • From: Phoenix, Arizona
  • 1,989 posts
Posted by canazar on Friday, September 29, 2006 2:28 AM

I would make sure to cram as much switching as possible.   Granted, might have to sacrafice scenery or even might push the"cramped" look a bit.  But the more swtiching you have, more fun you can have with it....   

 

Well, that's me anyways.

Best Regards, Big John

Kiva Valley Railway- Freelanced road in central Arizona.  Visit the link to see my MR forum thread on The Building of the Whitton Branch on the  Kiva Valley Railway

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, September 29, 2006 2:45 AM
I'd re-think the scale - 4 x 8 makes a nice N-scale layout.
  • Member since
    August 2005
  • From: Southeast Texas
  • 2,392 posts
Posted by Tracklayer on Friday, September 29, 2006 3:49 AM

 sovirginian wrote:
I would spend the first 60-80 dollars on books which would allow me to ask a more informative question. Your question indicates more of a toy train bent than that of a modeller. This is my honest response and is not meant to offend.

Yes you did mean to offend sovirginian, but are pretending not to... The fact is I have several hundred dollars worth of model railroading and layout design books, but thought the subject would be fun for new and/or younger members to ponder to see what they might come up with. Sorry that you were offended by my "simple" posting.

Tracklayer  

 

  • Member since
    November 2005
  • 1,223 posts
Posted by jeffers_mz on Friday, September 29, 2006 5:00 AM

Folded dogbone, upper and lower level. Nice long mainline runs, an apparant two track main, and you can fit it into 45 inches wide, with a lower level spur or two, two or three spurs inside the graded area, and another spur or two on top.

 

That three extra inches out to 48 is a good place for an interchange, two eight foot tracks to nowhere for expansion and staging.

 

Then when space allows, a drop leaf or two on either end, and even later on, additional 4x8 modules. around the room shelving, whatever you like.

 

Here's where my thinking is at right now, staging for 12 trains, a yard, an interchange, a major industry, three towns, and three independant mainline loops, allowing both detailed operations, and up to 6 trains doing roundy-round at once, in 5 by 14 feet, expanded easily from the original 4x8...

For the spaghetti bowl haters, this is what you actually see with the terrain in place...

Be aware, if you decide to take this approach and cover up this many turnouts, your trackwork, locos and rolling stock have to be perfect, and you have to leave access. It also requires 15 inch curves on the spurs, though the mains are all 18 and 22 inch.

 

This is where it started:

 

 

...and this is where it stands right now:

 

 

 

 

  • Member since
    June 2003
  • From: Culpeper, Va
  • 8,202 posts
Posted by IRONROOSTER on Friday, September 29, 2006 8:29 AM
 Tracklayer wrote:

If you only had room for a 4 X 8 foot HO layout and about a thousand dollars to spend on it, how would you design it ?. Keep in mind that trains of all eras will be ran on it at one time or another so please don't design it for one particular time period. Have fun...

Tracklayer



I would use a twice around layout with two passing sidings, small yard, small turntable, and water front scene.  I would add an interchange track, freight house, team track, and as many industries as I could fit in.
Enjoy
Paul
If you're having fun, you're doing it the right way.
  • Member since
    June 2004
  • From: Orig: Tyler Texas. Lived in seven countries, now live in Sundown, Louisiana
  • 25,640 posts
Posted by jeffrey-wimberly on Friday, September 29, 2006 8:54 AM
For somebody starting out, I would use the KISS principle. Keep It Simple and Stupid. Don't jump into a complex plan that you have no hope of finishing. Start out with something simple like a double oval with an inside yard. You can always add more later. Use the remaining money on the trains, again, starting out simple. Several short wheelbase locos like F7's or GP30's pulling strings of 7 to 10 40' or 50' cars. This can always be expanded later.

Running Bear, Sundown, Louisiana
          Joined June, 2004

Dr. Frankendiesel aka Scott Running Bear
Space Mouse for president!
15 year veteran fire fighter
Collector of Apple //e's
Running Bear Enterprises
History Channel Club life member.
beatus homo qui invenit sapientiam


  • Member since
    January 2001
  • From: US
  • 1,300 posts
Posted by Sperandeo on Friday, September 29, 2006 9:18 AM
Hi "tracklayer,"

I'd suggest an "outside-the-box" approach, similar to what "trainman2244" suggested. I'd divide the 4x8 plywood (or whatever other material you might wish) into two 2x8 pieces, and build an L-shaped, 24"-deep, 8 x 10-foot shelf layout along two walls of a room. That's a convenient shape for an HO switching railroad, the type of layout that offers the best chance of getting some realistic scenes and operation in this size and scale combination. It also makes for a more open, user-friendly layout room. See page 15 in my "Introduction to Track Planning," pubblished as a supplement with "Model Railroad Planning 2006."

Good luck with your layout,

Andy

Andy Sperandeo MODEL RAILROADER Magazine

  • Member since
    July 2006
  • From: Vail, AZ
  • 1,943 posts
Posted by Vail and Southwestern RR on Friday, September 29, 2006 9:27 AM
 Tracklayer wrote:

Keep in mind that trains of all eras will be ran on it at one time or another so please don't design it for one particular time period.

This sentence has to be changed or it is just a trackplan and not a layout.  Your operational goals and planned equipment have to be involved in the planning, in my opinion.  With only 4x8 to work with you are going to have to be really selective in what 'makes the grade', so I don't think generic works at all.  There is a 'generic' plan in the most recent (just out) MR in N-scale, but the space is larger, and it is N-scale, which allows for a few more generic industries and some mainline.  I'm still not sure it qualifies as a layout so much as a trackplan, but I haven't finished looking at it yet.

Jeff But it's a dry heat!

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, September 29, 2006 9:41 AM

-

  • Member since
    November 2003
  • From: Colorado Springs, CO
  • 2,742 posts
Posted by Dave Vollmer on Friday, September 29, 2006 9:43 AM

If you want to shift eras all the way to today, it'll be very, very hard to fit modern railraoding in HO in 4x8.  Your trains will be very short (maybe 5-7 60+  foot cars at best before you're chasing the FRED) and your six-axle diesels will be grinding against the rails in those tight curves.  So, I suggest:

1.  Stay in HO but model prior to the 1970s.

2.  Do a shortline so that you can go post 1970 with small diesel power.

3.  Go N scale.

I got sick of the limitations in HO given the space I had, which is exactly why in 2001 I ditched my HO 4x8 and went N (option 3).  Now, in 3X7 I have much more railroad than I did in HO in 4x8.

In N scale, you can do any era on a 4x8 and still have gentle enough curves and turnouts.  Plus, you can have 12+ car trains without looking silly.

Just a suggestion.

Modeling the Rio Grande Southern First District circa 1938-1946 in HOn3.

  • Member since
    November 2005
  • 1,223 posts
Posted by jeffers_mz on Friday, September 29, 2006 10:11 AM

 jeffrey-wimberly wrote:
For somebody starting out, I would use the KISS principle. Keep It Simple and Stupid. Don't jump into a complex plan that you have no hope of finishing. Start out with something simple like a double oval with an inside yard. You can always add more later. Use the remaining money on the trains, again, starting out simple. Several short wheelbase locos like F7's or GP30's pulling strings of 7 to 10 40' or 50' cars. This can always be expanded later.

 

Why do you assume a beginner won't complete a complex track plan?

 

From what I can tell, most layouts never get finished regardless of complexity.

 

:-)

 

I had a simple layout as a kid, but my dad laid the track and wired it up, so this one is really the first I've built. It's coming along great. I just planted 300 pines since my last post.

 

Another 300 trees, about two  more square feet of scenery, and all that's left then is buildings and water. Monday marks one year since we started.

 

I think finishing a layout is a concious decision you make, and much less a question of your track plan..

  • Member since
    October 2001
  • From: OH
  • 17,574 posts
Posted by BRAKIE on Friday, September 29, 2006 11:39 AM

This layout would work for me minis the third inter curve..In fact IF I had the space I would build this layout.Big Smile [:D]

http://www.gatewaynmra.org/layouts/gcrr2.jpg

 

Guys,Do recall switching layouts isn't everybody's cup of tea..I will be the first to admit switching layouts can become boring even when properly design..I speak from years of experience since 98% of my layouts has been switching layouts.

Larry

Conductor.

Summerset Ry.


"Stay Alert, Don't get hurt  Safety First!"

  • Member since
    June 2004
  • From: Orig: Tyler Texas. Lived in seven countries, now live in Sundown, Louisiana
  • 25,640 posts
Posted by jeffrey-wimberly on Friday, September 29, 2006 11:47 AM
 jeffers_mz wrote:

 jeffrey-wimberly wrote:
For somebody starting out, I would use the KISS principle. Keep It Simple and Stupid. Don't jump into a complex plan that you have no hope of finishing. Start out with something simple like a double oval with an inside yard. You can always add more later. Use the remaining money on the trains, again, starting out simple. Several short wheelbase locos like F7's or GP30's pulling strings of 7 to 10 40' or 50' cars. This can always be expanded later.

 

Why do you assume a beginner won't complete a complex track plan?

 

From what I can tell, most layouts never get finished regardless of complexity.

 

:-)

 

I had a simple layout as a kid, but my dad laid the track and wired it up, so this one is really the first I've built. It's coming along great. I just planted 300 pines since my last post.

 

Another 300 trees, about two  more square feet of scenery, and all that's left then is buildings and water. Monday marks one year since we started.

 

I think finishing a layout is a concious decision you make, and much less a question of your track plan..

Why? Because I've seen a lot of complex 1st layout plans never get farther along than the track-laying stage before the modeler decides they've gone in too deep. You say you're building your first. That's fine. I built my first in 1966, and many more since then. What I said, I said from harsh experience.

Running Bear, Sundown, Louisiana
          Joined June, 2004

Dr. Frankendiesel aka Scott Running Bear
Space Mouse for president!
15 year veteran fire fighter
Collector of Apple //e's
Running Bear Enterprises
History Channel Club life member.
beatus homo qui invenit sapientiam


  • Member since
    September 2006
  • From: Philadelphia
  • 250 posts
Posted by P & LE RR on Friday, September 29, 2006 2:13 PM
 BRAKIE wrote:

Guys,Do recall switching layouts isn't everybody's cup of tea..I will be the first to admit switching layouts can become boring even when properly design..I speak from years of experience since 98% of my layouts has been switching layouts.

Personally, I love switching layouts (which is why im starting my sectional build with a switching area).. Switching layouts might be a good place for a beginner to start just because you get used to operating a yard or an industry, you don't have to build a complex looping layout that you dont even see the train for 3/4 the time, and you get to really work your detailing skills in all of the industry you build and you can work in a lot of landscaping and scenery.. if you get bored of running the train through the yard just remember this... its your first layout you are bound to move on to bigger, bolder and more dynamic layouts once you have many skills under your belt!

Modeling the CSX Bethlehem Branch from Lansdale to Telford
  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Friday, September 29, 2006 2:23 PM

 Tracklayer wrote:
If you only had room for a 4 X 8 foot HO layout and about a thousand dollars to spend on it, how would you design it ?. Keep in mind that trains of all eras will be ran on it at one time or another so please don't design it for one particular time period. Have fun...
I took this post to be a "challenge" rather than Tracklayer asking for help with a layout design.  Tracklayer, am I correct?   As such many people rather than stepping up to the challenge are trying to change the parameters, which would defeat the purpose.

My thought is since it has to be era independent the only choice is to do a natural scenery only layout.  No automobiles/horse& wagons, no structures, no track side support features, even no bridges.  Trees, rocks, and water are about the only thing that can be era independent.   The track could even be a problem in that area.   As the era thing eliminates industrial areas, the only interest would be to make it as long as possible with grades.   I was thinking a smashed figure-8 on a grade, but that would need at least two bridges.....Hmmm how about a 3 times around with a crossing on the lower loop, and a tunnel under for the other crossing.

  • Member since
    July 2006
  • 6 posts
Posted by BizDoc on Friday, September 29, 2006 3:22 PM
On that HOG layout, I wonder if you could do it as an around the walls layout, I have space for that.  I also wonder if you could do it in N.
  • Member since
    November 2003
  • From: Colorado Springs, CO
  • 2,742 posts
Posted by Dave Vollmer on Friday, September 29, 2006 3:37 PM
 Texas Zepher wrote:

 Tracklayer wrote:
If you only had room for a 4 X 8 foot HO layout and about a thousand dollars to spend on it, how would you design it ?. Keep in mind that trains of all eras will be ran on it at one time or another so please don't design it for one particular time period. Have fun...
I took this post to be a "challenge" rather than Tracklayer asking for help with a layout design.  Tracklayer, am I correct?   As such many people rather than stepping up to the challenge are trying to change the parameters, which would defeat the purpose.

Oh, yeah...!  Duh!  Tracklayer, you're an N scaler, aren't you?  So of course this isn't for you.

I'm probably not up to your challenge then.  I could envision a 20-30, maybe 40 year window in which you could change eras without too much loss.  But, to cover 170 years of railroading...  I guess you'd have to have only a handful of structures and even make the lineside details removable.

Modeling the Rio Grande Southern First District circa 1938-1946 in HOn3.

  • Member since
    August 2003
  • From: Midtown Sacramento
  • 3,340 posts
Posted by Jetrock on Friday, September 29, 2006 3:56 PM

If you only have room for a 4x8 layout, it's safe to assume that you have an 8x10 room to work with, assuming two feet of clearance on three sides of the layout (8x12 if you assume clearance on all four sides.) This means that you can cut that 4x8 sheet of plywood into four 1x8 foot shelves, and put shelves all the way around that 8x10 room.

 

This will allow about 32 feet of mainline running, half an HO mile, about twice as much mainline as a 4x8 plan.

 

It will also allow you to use much broader curves, potentially 36" or broader if you can cut a couple of triangular pieces of plywood to fill in the corners.

 

It will also allow you to have four separate scenes, one along each wall, which will be physically isolated from each other, allowing for a great sense of space since you can't see the whole layout from any one point in the room. Admittedly, one of these scenes will have to include a lift-out, swing-up or swing-down bridge (or a duckunder for the masochists) but that's a small price to pay for way more flexibility in layout planning. You'll have room for a double-ended yard, two different industry settings, and a section of plain ol' running through the countryside. Because all four shelves are connected, you can have continuous running--you'll want a revolving chair for the center of the room in order to avoid dizziness.

 

As to do it for about $1000, well that is a challenge. Personally, I'd do it on flatland, rather than a lot of exotic terrain: perhaps a Midwestern or desert theme. This means that I can add a sub-frame to the plywood using cheap 1x2 lumber. I'd use L-bracket shelves from the local home improvement store to mount the layout to the walls. I suppose that if I had the choice of foam or plywood for the 4x8 sheet, by choosing foam I'd have the option of easily sloping down below grade without having to do a bunch of cookie-cutter or L-girder work. Leftover bits of foam can be used to build up above grade for gentle hills.

 

I prefer Woodland Scenics foam for roadbed, and for economy's sake I would recommend Atlas Code 83 or 100 flex track and switches. In order to economize on track I'd try and minimize the number of turnouts. Tentatively I'd want a three-track double-ended yard, with a two-stall enginehouse, so I'd need eight turnouts for that--that's about $110 in turnouts for non-remote Snap-Switches already! Figure on four switches each (a passing track and two single-point spurs) for each industrial area, and none at all for our scenic route, so that's another $110. Five-packs of Atlas flextrack run about $15, and personally I'd recommend 75 feet of track to provide enough for mainline, yard tracks, passing tracks and spurs: that's $75. So track alone is around $300. Don't forget a powerpack and wiring--personally I like having power drops every 3-6 feet, although some advocate power running to each piece of track. By using a bus that follows a main you'll be able to switch to DCC fairly easily.

Backdrop will be important, but it's cheaper to paint/print/glue scenery and buildings to a backdrop than to build them. Use 1/8" Masonite, available in 2x4 sheets. It can be bent to make big wide corners or you can buy coved bits of wood trim to make very sharp corners for your layout's corners--that's up to you--or you can just leave your corners pointy and hide them with hills or big buildings. Paint 'em with a quart of sky-blue latex house paint, use a 98 cent spray can of white paint to make some fluffy clouds, and then use the artistic ability of your choice (either your own painting skill, pre-made backdrop paintings, or photos scanned and printed using an inkjet printer and glued to the backdrop) to add background. But even plain sky-blue backdrop will add considerably to realism.

For scenery, a run to a home-improvement store will get you a big bag of Hydrocal and a big pack of paper towels, a roll of painter's tape, some Elmer's glue, some rubbing alcohol, and a gallon of paint in a suitable dirt color. You can also harvest some dirt around the neighborhood for free, sift it in a discarded colander, bake it for a couple hours at 200 degrees, and run a magnet over it to pick up the metal bits. Using some extra Styrofoam or balled-up newspaper, make your landforms (tape them in place with the tape), plop Hydrocal soaked paper towels down (you did cover your track with the leftover tape, didn't you?) and once that is dry paint it with the gallon of paint. Add dirt on top while the paint is still wet, and/or Woodland Scenics ground foam. Trees and other shrubbery are up to you: roads can be made from plaster and painted appropriate roady colors with latex paint or craft paints.

 

Structures are a highly personal choice--ideally you'll have some idea what kind of industries you want to serve before you start building. You can always scratchbuild, use printed cardstock buildings (or PDFs of buildings printed onto cardstock in your inkjet printer) or hunt for deals at train shows or your local hobby shop's discount table. If you want to model a large building, considering just modeling the front wall and gluing it to the backdrop: this will let you model big warehouses or large factory complexes by omitting those unnecessary other three walls and roof things and just showing the interesting bit where railroad cars are parked for loading and unloading.

 

And then there's that lift-out bridge. Personally, I'd cut out a three-foot length of that 1x8 sheet (using the extra to shore up my corners for broader curves) and use a three-foot length of 2x4 or other very sturdy dimensional lumber for the bridge itself. I'd paint the sides a Day-Glo color, black on the top, and mount track to the top of the 2x4. By gluing (or nailing) some cheap Atlas bridge-girder sides parallel to either side of the track, I'd create the impression of a long truss bridge and provide a margin of safety in case of derailment on the bridge itself. A hinge under one end of the 2x4 and a barrel bolt on the other end would allow an easy drop-down, and I'd also include a microswitch  attached to the drop-down that would kill power to the track for a foot or so in either direction to avoid disaster should a train approach the bridge while the gate is open.

 

The room, as such, would still have a 6x8 foot open section in the middle for visitors or operators, and room for short bookshelves (for storage) or a work table (for construction or repair) under the layout itself.

  • Member since
    January 2003
  • From: Dover, DE
  • 1,313 posts
Posted by hminky on Friday, September 29, 2006 4:16 PM

 BizDoc wrote:
On that HOG layout, I wonder if you could do it as an around the walls layout, I have space for that.  I also wonder if you could do it in N.

Just lengthen the sections to fit your room space.

Just a thought

Harold

  • Member since
    August 2005
  • From: Southeast Texas
  • 2,392 posts
Posted by Tracklayer on Friday, September 29, 2006 4:44 PM

Wow Jetrock!. You really put some thought into it didn't you... And so did so many others. However, some of you really took it and ran with it. I guess that's my fault for not establishing some hard core ground rules from the very start.

How this got started in the first place is that I've got a friend that seems interested in having a 4 X 8 HO table layout because that's about all he has room for, and though I could have easily thrown something together for him, I told him that I would see what you guys could come up with first. He's not a real high tech guy, so when all's said and done he'll probably end up with a basic roundy round track configuration with a side track, a small town in the middle of the layout, a station and maybe a rice dryer or some other type of industry. The layout and table alone will run him about $600.00, and he'll probably use the other $400.00 to buy lower end locos and rolling stock. That'll at least get him started. 

Thanks guys.

Tracklayer 

  • Member since
    October 2001
  • From: OH
  • 17,574 posts
Posted by BRAKIE on Friday, September 29, 2006 7:16 PM

Personally, I love switching layouts (which is why im starting my sectional build with a switching area).. Switching layouts might be a good place for a beginner to start just because you get used to operating a yard or an industry, you don't have to build a complex looping layout that you dont even see the train for 3/4 the time, and you get to really work your detailing skills in all of the industry you build and you can work in a lot of landscaping and scenery.. if you get bored of running the train through the yard just remember this... its your first layout you are bound to move on to bigger, bolder and more dynamic layouts once you have many skills under your belt!

 

Well,I am not exactly what you would call a rookie in designing a prototypical industrial switching layout seeing I have built several over the last 18 years-the last loop layout I had was in 1988..I also have built 4 branch line layouts.So,I will stand by my statement that switching layouts can become boring.

 

Of course a switching or branch line layout can be a highly detailed finish layout that will out shine most other layouts as far as detailed scenes..

Larry

Conductor.

Summerset Ry.


"Stay Alert, Don't get hurt  Safety First!"

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, September 29, 2006 8:39 PM

No Tracklayer, I did not intend to offend. If you had provided a little of this later info, the question would have begged an answer. First, is a 4 x 8 all the space your friend believes he will ever have? Is a thousand dollars an initial investment or the total sum he will ever spend on this hobby or layout? A 4 x 8 could have two levels for independent time periods, times four sides, equals 8 eras of railroading history, if the table is approx. 52 in. high, built as an L-girder, with the second shelf  layout extending at, say, 32-36 inches. You did not mention your friends desire for DC or DCC, if you have given him a track preference, etc.. There are some industries, in small towns, which have not shown visible change in 150 years, i.e., lumber, milling, mining.

Wish him the best and a long association with this hobby.

Don

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!