Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
RJ
"Something hidden, Go and find it. Go and look behind the ranges, Something lost behind the ranges. Lost and waiting for you. Go." The Explorers - Rudyard Kipling
http://sweetwater-photography.com/
Scott - Dispatcher, Norfolk Southern
QUOTE: Originally posted by JohnT14808 Since I'm not into brass, I can't comment on the handrails,
QUOTE: but the glue strings I think you could resolve by purchasing better string, or perhaps better glue....One of the two. Should handle your problem. John
Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.
_________________________________________________________________
QUOTE: Originally posted by loathar I hate 4 things 1-Ballasting 2-Ballasting 3-Ballasting 4-Glueing in window glass. Anyone try that liquid creat a window type stuff that Micro Mark sells?
QUOTE: Originally posted by loathar Dthurman-You ever try ballasting? (I don't get it?[%-)])
Russell
QUOTE: The lack of quality steam locomotives in N scale.
Dan
QUOTE: Originally posted by AltonFan No provision for a MT coupler on the pilots of N scale Bachmann Spectrum locomotives. (A 2-8-0 needs a pilot coupler.) And Bachmann isn't the only offender in this regard. QUOTE: The lack of quality steam locomotives in N scale. Care to develop that thought?
QUOTE: Originally posted by Earl Sporktong Super Gluing myself to myself....