Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

1/2 or 1/4 plywood for base

3543 views
7 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    November 2012
  • 24 posts
1/2 or 1/4 plywood for base
Posted by hylik on Tuesday, February 26, 2013 3:14 PM

hi...

should i use 1/2 or 1/4 plywood as base for my layout..the benchwork will be open grid 35" x 7'

 

  • Member since
    January 2001
  • From: SE Minnesota
  • 6,845 posts
Posted by jrbernier on Tuesday, February 26, 2013 3:25 PM

  Based on your layout will be 35" by 84", it is going to depend on your joist separation   I have 16" OC joists and use 1/2" plywood - Rock Solid!  I think 1/4" material may be a little flimsy  unless you reduce your joist spacing.  Now, if you are using 2" foam glued on top of that 1/4" material, you should be good.

Jim

Modeling BNSF  and Milwaukee Road in SW Wisconsin

  • Member since
    December 2012
  • 70 posts
Posted by JHinPA on Tuesday, February 26, 2013 3:28 PM

If it's open grid like mine then you should use 1/2" minimum 1/4" is fine for flat track work but if there is any elevation changes , it will bow and twist for sure . even if its flat and you are nailing track like I did , the 1/4" dose not hold nails very well

  • Member since
    September 2003
  • From: Southeast Texas
  • 5,444 posts
Posted by mobilman44 on Tuesday, February 26, 2013 3:28 PM

Hi,

Seems like this same question was asked yesterday.............   Go with the 1/2 inch, you will NOT regret it.   With 1/4 inch you may well do so.

ENJOY  !

 

Mobilman44

 

Living in southeast Texas, formerly modeling the "postwar" Santa Fe and Illinois Central 

  • Member since
    July 2006
  • From: upstate NY
  • 9,236 posts
Posted by galaxy on Tuesday, February 26, 2013 4:30 PM

1/2 should be plenty sufficient.

Geeked

-G .

Just my thoughts, ideas, opinions and experiences. Others may vary.

 HO and N Scale.

After long and careful thought, they have convinced me. I have come to the conclusion that they are right. The aliens did it.

  • Member since
    June 2007
  • 8,873 posts
Posted by riogrande5761 on Tuesday, February 26, 2013 4:32 PM

Agree, best advice in HO, use 1/2-inch.  As another above said, 1/4-inch may be too flimsy.  Every time I considered using it, I got worred and used 1/2-inch on both my previous two layouts and wasn't disappointed.  Plus over the past 25 years I've noticed universally, 1/2-inch is recommended for base, subroadbed, yards etc on HO layouts.  It's better to be conservative - imo 1/4-inch is risky, I wouldn't go there.

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    January 2007
  • From: Eastern Shore Virginia
  • 3,290 posts
Posted by gandydancer19 on Wednesday, February 27, 2013 9:46 AM

If it is going to be a table top and not a cookie-cutter, and you are going to glue on a sheet of one inch builders foam on top of it, you can use 1/4 inch plywood. (I use Luan with one inch foam.)

If you are not going to use the foam, then 1/2 inch should be used.

By using a sheet of foam, you can carve down for some small streams and rivers without cutting through the plywood. You can also make some shallow depressions to vary the scenery if desired.

Elmer.

The above is my opinion, from an active and experienced Model Railroader in N scale and HO since 1961.

(Modeling Freelance, Eastern US, HO scale, in 1962, with NCE DCC for locomotive control and a stand alone LocoNet for block detection and signals.) http://waynes-trains.com/ at home, and N scale at the Club.

  • Member since
    September 2003
  • 10,582 posts
Posted by mlehman on Wednesday, February 27, 2013 6:43 PM

Good tip on using 1/4" ply as a skin for layering onto foam.

Other than that, you would be making a big mistake trying to use 1/4" for sub-roadbed. Don't even bother, you'll regret it.

If you are building with wood, definitely 1/2" minimum plywood. Even it should have support no farther than every 16" and I'd go closer, as even 1/2" can sag a little over time. 3/8 is pretty iffy, but might work with closely spaced risers.

If you want to be sure there will be no future issues -- and you might need to climb onto the layout at some point -- then use 3/4". I've not regretted it.

Mike Lehman

Urbana, IL

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!