Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Yet another Rock Ridge and Train City--Letter Rip

9252 views
30 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Yet another Rock Ridge and Train City--Letter Rip
Posted by SpaceMouse on Wednesday, August 27, 2008 7:21 PM

I'm baack.  

This layout incorporates most of the best ideas I've had in the past and guess what. I'm pretty sure I can build this one. I've had to renegotiate Right of Way and I think this one will fly. A couple of points to start.

1) This is set in 1891--the first year of the new SP numbering system.

2) I know the smallest staging track is short. But I have a staged train that is at most an old time 2-6-0 with one coach and a baggage car. Total length about 15 inches.

3) The track that runs off the layout in the "pit" will be incorporated into the layout. I can curve the layout easier than I can the plan.

4) The small track off the turntable directly opposite the entry is RIP. It only has to be long enough to take damaged 36 foot cars pushed in by locos.

5) Only the right side of the drawing represents wall. The "operation" for Train City will above the layout and for Rock Ridge to the left. The "pit" is negotiated space by my son and wife.  

6) The setting is the SP mainline between Sacramento and Virginia City in the Sierra Foothills.

7) The height is 48" on the table top. The scenery drops below that edge 12" in the pit area. Staging will be sceniced like an abandoned yard.  

8) There will be visual separation along the river to divide the scenes with the hills and trees.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Wednesday, August 27, 2008 7:49 PM
What is the purpose of the curved ladder by-pass track just below the passenger station in Train City?  Doesn't seem long enough to let a locomotive escape around a train.  Well maybe with help of a switcher.  E.g. swither pulls train back.  Road locomotive ducks into that track.  Switcher pushes train on into the track and road locomotive runs back down???? 
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Wednesday, August 27, 2008 7:52 PM

Yeah, I forgot to mention. That is a caboose track with room for about two of them. I think it is my least favorite part of the design.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    June 2007
  • From: Cincinnati OH
  • 191 posts
Posted by DingySP on Wednesday, August 27, 2008 8:36 PM
Is this a joke?
Keepin' it Dingy
  • Member since
    December 2007
  • From: Delmar, NY
  • 671 posts
Posted by DeadheadGreg on Wednesday, August 27, 2008 9:33 PM

regardless of your design, you always have to mentally visualize how the layout will operate before you start building anything.  Follow a train around the layout, how it will do its work.  This is the only way I find that i'm able to actually figure out what works and what doesn't. 

it all started from my MR subscription...  ever since i've been getting them, the first thing I do is go to the layout trackplans and mentallly pull a train out of whatever yard there is, and then go around the mainline and follow the route. 

PHISH REUNION MARCH 6, 7, 8 2009 HAMPTON COLISEUM IN HAMPTON, VA AND I HAVE TICKETS!!!!!! YAAAAAAAAY!!!!!!! [quote user="jkroft"]As long as my ballast is DCC compatible I'm happy![/quote] Tryin' to make a woman that you move.... and I'm sharing in the Weekapaug Groove Wake up to find out that you are the eyes of the world....
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Wednesday, August 27, 2008 9:35 PM

 DingySP wrote:
Is this a joke?

It wasn't intended that way. Is there something I'm not seeing?

Here's a couple pic from the first one.

Rock Ridge

Train City

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    September 2003
  • From: Omaha, NE
  • 10,621 posts
Posted by dehusman on Wednesday, August 27, 2008 9:54 PM

It would be really difficult to operate since all the moving parts are waaaaaaay in the back.

That's probably what some people find funny.

Dave H.

Dave H. Painted side goes up. My website : wnbranch.com

  • Member since
    June 2007
  • From: Cincinnati OH
  • 191 posts
Posted by DingySP on Wednesday, August 27, 2008 9:58 PM

I dunno, it looks to me like you have an 8' x 10-1/2' layout with virtually no way of accessing anything beyond 2-3 feet of the edge of the layout.

Maybe I am missing something here.

Also, to me it looks too square, how about some sweeping curvy lines to liven it up a bit.

Keepin' it Dingy
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Wednesday, August 27, 2008 10:04 PM
 dehusman wrote:

It would be really difficult to operate since all the moving parts are waaaaaaay in the back.

That's probably what some people find funny.

Dave H.

I have access on three sides as mentintioned. The way in the back as also mentioned is where Train City is worked. The Left side is where Rock Ridge is worked. The front "pit" is a work area where my wife will pull a table out from under the layout to do her base acrylics for her paintings.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Wednesday, August 27, 2008 10:07 PM
 DingySP wrote:

I dunno, it looks to me like you have an 8' x 10-1/2' layout with virtually no way of accessing anything beyond 2-3 feet of the edge of the layout.

 Maybe I am missing something here.

In the notes leading into the plan I mentioned that I have access to the three sides.

Also, to me it looks too square, how about some sweeping curvy lines to liven it up a bit.

I also mentioned that I am better with wood at making curves than I am at making them using software.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Wednesday, August 27, 2008 10:25 PM

I like it, Chip.  You almost have the makin's for a turning wye at your dotted, under-the-hill, curve...if turning a whole train was the least important.  Looks interesting, with a bit of a 2X6 switch puzzle at the upper right.

-Crandell

  • Member since
    June 2007
  • From: Cincinnati OH
  • 191 posts
Posted by DingySP on Wednesday, August 27, 2008 10:30 PM
Well, if it works for you, go for it. We are seeing the plan, You are seeing the vision. My own layout plan is basically a 10' x 20' staging yard with a 2' x 6' diorama on top to watch trains run through. How's that for a waste of space.
Keepin' it Dingy
  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Wednesday, August 27, 2008 11:56 PM

 DingySP wrote:
Well, if it works for you, go for it. We are seeing the plan, You are seeing the vision. My own layout plan is basically a 10' x 20' staging yard with a 2' x 6' diorama on top to watch trains run through. How's that for a waste of space.

Pardner, no model railroad is a waste of space if it meets the owner's givens and druthers.  My own double garage filler has seven (count 'em) hidden staging elements (only four would qualify as 'yards,' the others are nose-to-tail linear) and about 100 feet of hidden first main track, all to assure that the correct train will appear from one of three tunnel portals to traverse visible track.  Two of those portals are at the opposite ends of the visible National Railway line, about 65 feet apart as the KiHa80 class DMU flies, the other is concealed by the tipples and over-track storage at the top end of a coal hauling private railway with a similar mainline length.

I'm trying to simulate the operations of a busy secondary mainline and a somewhat more laid back private railroad - and the looks of an area which is sparsely populated by almost any standard.  I'm also working within the physical limitations of a chicken whose spring has long since been sprung.  Come back in a couple of years (decades?) to see how successful I've been.

Chip, I think you have the makings of an operational plan.  Just be aware that no paper track plan has ever survived the first contact of the flex track with the roadbed.  (As an aside - hand-laid turnouts?)

Chuck (modeling Central Japan in September, 1964)

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, August 28, 2008 12:42 AM
 DeadheadGreg wrote:

regardless of your design, you always have to mentally visualize how the layout will operate before you start building anything.  Follow a train around the layout, how it will do its work.  This is the only way I find that i'm able to actually figure out what works and what doesn't.  

Good advice.

Not only do I know how it operates, every track has a purpose. If I eliminate one, I have to find a way to replace it. Take the turntable in the lower left. The engine working the mine and town of Rock Ridge doesn't need to turn, but the mine turn coming from Sacramento has to turn it's engines after switching empties for loads.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, August 28, 2008 12:45 AM
 selector wrote:

I like it, Chip.  You almost have the makin's for a turning wye at your dotted, under-the-hill, curve...if turning a whole train was the least important.  Looks interesting, with a bit of a 2X6 switch puzzle at the upper right.

-Crandell

I had to eliminate both the double slips. I may find a way to add one back in.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, August 28, 2008 12:51 AM
 tomikawaTT wrote:

Chip, I think you have the makings of an operational plan.  Just be aware that no paper track plan has ever survived the first contact of the flex track with the roadbed.  (As an aside - hand-laid turnouts?)

Chuck (modeling Central Japan in September, 1964)

Just like every boxer has a plan--until he gets hit.

I don't know how much I'm going to hand-lay. At least one of the turnouts is custom, but I'm pretty fast with Fast Tracks jigs these days. There are a couple places on the layout that are inefficient and I'm thinking some custom track-work might smooth things out some. I have enough materials to hand-lay the Rock Ridge area on hand.

I'll make that call once the spline is in place.  

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    June 2003
  • From: CANADA
  • 2,292 posts
Posted by ereimer on Thursday, August 28, 2008 9:18 AM

hey Chip , welcome back !

i've forgotten , is this going to be your only layout , in other words is it replacing the basement filling northwest layout you were planning , or is this more for running trains with your son as a replacement for the original RR&TC ? and do you still plan on building the eastern city scene you were working on ?

 

i hope you're having better luck keeping track of all your projects than i am Smile [:)]

 

ernie

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, August 28, 2008 10:19 AM

Ernie,

The right side of the drawing butts up against the back of Indiana Branch of the PRR in 1950.

The Indiana Branch is going slow because so much depends on research and I want to get it right. I've found a source for some possible pictures of the town in that period, but I have to take off work to do the research and I cannot duplicate the photos I find. It is a very slow project and I find that it is very unsatisfying being stuck all the time due to inadequate or inaccurate information.

I'm really looking forward to working on something that is not so strict what I am trying to accomplish. I have more of this type of freedom in the Old West and I can even throw a little whimsy in there to stir the pot.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, August 28, 2008 11:04 AM

Okay, here are the problems as I see them.

1) A train coming in to Train City Yard from staging has a lot of work to do to get the engine and caboose put away. As I see it, the engine must pull the train onto the main, release and runaround to the back, and pull the caboose. Since the caboose is wood frame, it cannot be used for pushing. As it stands, the engine must zig-zag the caboose into the caboose track, then zig zag back. It can then pull-push the train onto the A/D track and head into the turntable.

2) The caboose track is small and awkward. 

3) Switching industries 3, 4 & 6 will be difficult.

4) The "Mine Turn" will need to reverse it's engines. They will have to zig-zag through the Rock Ridge area to get to the turn-table. (I can solve this with a double slip)  

Most of these can be solved with use of custom hand-laid track-work. I think. Haven't done it yet.

5) As with may small 'operations-based" layouts, there are many tracks to cross where roads must go to provide access for the Lilliputians to get to work.  

   

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Thursday, August 28, 2008 2:30 PM

The first problem I saw is if one would want to have two facing trains run continuously.  The two towns are very close together through the upper left side.  They are very far apart through the lower right side.   One train will always have to be waiting for the other.  I don't think there is any chance of cool moving passes and keeping both trains in motion.  I know dispatching isn't one of the primary operational goals of the layout so it is probably a very minor issue.

You know... I think I would try to connect the caboose track directly to the turntable.  Well at least run a connection from somewhere around the caboose track to the turntable.  Seems that could eliminate a double switchback getting a loco from a put-away (parked?) arriving train to the round house.     Do I sense that area is designed around a 9" turntable with 30 degree departure tracks.  The new Atlas has tracks spaced at 15 degrees.  Might be more flexible.

 

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, August 28, 2008 3:57 PM
 Texas Zepher wrote:

The first problem I saw is if one would want to have two facing trains run continuously.  The two towns are very close together through the upper left side.  They are very far apart through the lower right side.   One train will always have to be waiting for the other.  I don't think there is any chance of cool moving passes and keeping both trains in motion.  I know dispatching isn't one of the primary operational goals of the layout so it is probably a very minor issue.

You are right in assuming railfanning will be an important part of this layout. I see your point about having two trains running. I suppose the only solution would be to put a passing siding on the bridge, but I probably won't do it. Solving this "problem" might be worth reconceptualizing.

The layout is designed for operations, but I get plenty of that on OPL's (Other People's Layouts). But I do want the option of ops on this layout in case my son gets interested. So far he just wants to see them go.

You know... I think I would try to connect the caboose track directly to the turntable.  Well at least run a connection from somewhere around the caboose track to the turntable.  Seems that could eliminate a double switchback getting a loco from a put-away (parked?) arriving train to the round house.
    

I think I solved the problem with a double slip. A train can now enter the A/D track from staging release the engine and runaround behind the train and either go directly to service or pull the caboose and put it away without an abnormal switchback. (see below) I also added a custom turnout further out the lead (which may be completely unnecessary) and I put back the double slip to the turntable at Rock Ridge.  

Do I sense that area is designed around a 9" turntable with 30 degree departure tracks.  The new Atlas has tracks spaced at 15 degrees.  Might be more flexible.

I picture A-frame turntables so I figured I'd scratch or bash them. I have an el cheapo Atlas but I'm not sure how much of it will be left if I bash it. Seems I would replace just about everything on it.

I haven't thought anything at all about the spacing of the tracks about the turntable other than to provide the number I would need for operations. I had already decided I would move them around some to fit more streets and buildings to give the area a more built-up dense city look.

 

  

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    February 2005
  • 627 posts
Posted by exPalaceDog on Thursday, August 28, 2008 3:59 PM
 SpaceMouse wrote:

I had to eliminate both the double slips. I may find a way to add one back in.

First, welcome back!

Second, the double slips are no big lost. They would probably be maintainence disasters. And they are not appropriate for the layout theme.

Good luck, and have fun!

 

  • Member since
    January 2007
  • From: Eastern Shore Virginia
  • 3,290 posts
Posted by gandydancer19 on Thursday, August 28, 2008 6:23 PM

I know the last thing you probably need is another computer program. But do you have one that you can input your layout in and run trains with? It may help see the problem areas if you have any. Does X-Track Cad allow that? If not, you may want to look at Train Player. That has helped me.

Otherwise, it looks good to me.

Elmer.

The above is my opinion, from an active and experienced Model Railroader in N scale and HO since 1961.

(Modeling Freelance, Eastern US, HO scale, in 1962, with NCE DCC for locomotive control and a stand alone LocoNet for block detection and signals.) http://waynes-trains.com/ at home, and N scale at the Club.

  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Thursday, August 28, 2008 7:23 PM
 SpaceMouse wrote:
and I put back the double slip to the turntable at Rock Ridge.
I like the looks of that one better the first way.  The double slip just looks so, big town ... New Jerseyish.   So what if you have to saw a bit?  How often is the coal turn train run?  Once a scale day?
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, August 28, 2008 8:53 PM

TZ,

It's a silver mine so once every couple days. You are right that it doesn't jibe.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Thursday, August 28, 2008 9:02 PM

Thanks Mac,

XtraCAD allows you to run trains but I don't use that function. I kinda sorta developed 3-D vision when I worked as a contractor. When I do the drawings in 2-D I see them as 3-D structures so I have a good idea of the effect I'm trying for.

I also know the trains I'm going to run, their size and length requirements, so I have a good idea of how things will run. Besides none of the engines in the sims are small enough to fit on my turntables, and they don't make sim 26-36 foot rolling stock. But like I said, I have a good vision of what it is like.

Not that I don't miss things.  

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    November 2007
  • 84 posts
Posted by Flying switch56 on Friday, August 29, 2008 3:17 PM

Hello. First time posting so please bear with me.

Just an observation, but I see a problem with the turnout at the edge of the Rock Ridge curve since it creates an S-curve. Using a LH turnout would get rid of the S-curve and the main wouldn't be on the diverging route as well.

Overall, I think it's a nice plan.

Vic

Vic

Modelling the span between the real and the N-sane...

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Friday, August 29, 2008 3:33 PM
 Flying switch56 wrote:

Hello. First time posting so please bear with me.

Just an observation, but I see a problem with the turnout at the edge of the Rock Ridge curve since it creates an S-curve. Using a LH turnout would get rid of the S-curve and the main wouldn't be on the diverging route as well.

Overall, I think it's a nice plan.

Vic

Welcome and thanks.

You are right about the turnout. A couple times I thought about changing it and forgot about it. Part of the issue is that I took that plan off the existing "module" that I lifted off my 4 x 8 Rock Ridge and Train City I. On that layout the main went straight.

Still you are right and I was lazy. Good catch. Here's what that area looks like now.

   

 

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    November 2007
  • 84 posts
Posted by Flying switch56 on Friday, August 29, 2008 3:42 PM

Very nice modeling. Fortunately, there isn't much scenery in the way to remove when you incorporate the turnout (it'd be a shame to have to tear into those hillsides).

Also, I could've sworn I hadn't posted on this forum before but apparently I have somewhere, some when. Aw well...

Vic

Vic

Modelling the span between the real and the N-sane...

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Friday, August 29, 2008 3:56 PM
 Flying switch56 wrote:

Very nice modeling. Fortunately, there isn't much scenery in the way to remove when you incorporate the turnout (it'd be a shame to have to tear into those hillsides).

Also, I could've sworn I hadn't posted on this forum before but apparently I have somewhere, some when. Aw well...

Vic

Okay, here's what it looks like with your suggestion and TZ's suggestion.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!