Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

The bridge staging yard is finished.

2037 views
7 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2001
  • From: Nevada
  • 825 posts
The bridge staging yard is finished.
Posted by NevinW on Sunday, October 24, 2010 5:46 PM

Last weekend I built the bridge this week I laid the track and wired it.  I used Atlas code 83 with #4 turnouts.  Had room for a siding and a fiddle track.  It is high enough to easily duck under.  It is fun to just let a train run around now.  Here are a few pictures.  I wired it with cutoff switches so I can kill the sound.  -  Nevin

  • Member since
    August 2004
  • From: Phoenix, Arizona
  • 1,989 posts
Posted by canazar on Sunday, October 24, 2010 5:55 PM

Nicely done.  That looks like nice shelf layout.  Some day I want to go that route once I get the chance to build again.  Nice use of space as well. 

Best Regards, Big John

Kiva Valley Railway- Freelanced road in central Arizona.  Visit the link to see my MR forum thread on The Building of the Whitton Branch on the  Kiva Valley Railway

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,280 posts
Posted by richhotrain on Monday, October 25, 2010 7:21 AM

Awesome !

So, it is a duck under, not a lift out ?

What are the dimensions ?

How high off the floor ?

Rich

Alton Junction

  • Member since
    January 2001
  • From: Nevada
  • 825 posts
Posted by NevinW on Monday, October 25, 2010 12:00 PM

It is 50 inches high, 6.5 feet long and about 8 inches wide.  It is designed to be a lift out but in reality, the duck under has not been much of a problem and I am thinking about leaving it in place with equipment on it most of the time. 

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Monday, October 25, 2010 12:43 PM

Very well done!

Am I correct in assuming that you've followed the Noh tradition (the black-clad stagehand isn't really there?)  Very effective - looks rather like a night scene between two day scenes.

Chuck (Modeling Central Japan in September, 1964 - with netherworld staging below the visible scene)

  • Member since
    January 2001
  • From: Nevada
  • 825 posts
Posted by NevinW on Monday, October 25, 2010 1:20 PM

The painting of everything that isn't part of the actual scene black has been more effective than I thought it was going to be.  The next step is a black curtain hanging down below the layout to cover the bench work.  All I have to do is talk my wife into cutting the fabric I bought into 10 foot x 3 foot sections.  I plan on using cloth pins hot glued to the underside of the fascia.  -  Nevin

  • Member since
    June 2008
  • From: Suffolk, Virginia
  • 485 posts
Posted by rclanger on Monday, October 25, 2010 4:30 PM

Good job, well planned and executed.

  • Member since
    September 2008
  • 9 posts
Posted by scalerious on Tuesday, October 26, 2010 8:11 AM

Great work. I planned a bridge just like yours and this is giving me the inspiration to actually build it.

Are there curves leading into the bridge? or is the bridge a dead straightaway?

Mine would have a slight curve leading in and out andI've been trying to figure out how to stableize it

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!