Why are there two track profiles shown in the various alternatives?
Link to meeting. Link is very awkward ( sounds like Amtrak and FRA ) Have to use 1st page to link to eack section.
Several points. Apppears that Alternative 11 is preferred and of all things 4 separate tunnels. Will decrease times about 0:1:30. Even a hint of what will happen to present tunnel. Note clearance will be enough for double stacks and CAT installed. Certainly forward thinking. It may be that CSX double stacks are anticipated instead of Howard street ?
http://www.bptunnel.com/index.php/2014-05-18-15-35-19/meeting-materials#
The evaluation Matrix are the real meat of the study IMHO.
The meeting will be an open house format with identical presentations at 5:30 pm, 6:15 pm and 7:00 pm.
45 minutes for each presentation isn't a whole lot of time for a Open House meeting.....
Never too old to have a happy childhood!
Short notice public meetig tomoorrow ( Tuesday ) on various highlights of various studies.
http://mta.maryland.gov/advisories/b-and-p-tunnel-project-open-house
Our community is FREE to join. To participate you must either login or register for an account.