Train length 7500 feet
Posted by diningcar on Thursday, April 6, 2023 10:08 AM

The Nevada Legislature is considering legislation that would limit trains to a length of 7500 feet.

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Thursday, April 6, 2023 10:14 AM

Arizona tried a similar stunt decades ago, limiting freight trains to 80 cars.  It was struck down by the Supreme Court of the United States as unconstitutional state regulation of interstate commerce.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    April 2023
  • 30 posts
Posted by GrandTrunkWestern on Tuesday, April 11, 2023 7:11 PM

diningcar

The Nevada Legislature is considering legislation that would limit trains to a length of 7500 feet.

 

Well lets hope it passes!

"I Drink From The Keg Of Glory. Bring Me The Finest Muffins And Bagels In All The Land." - Josh Lyman

  • Member since
    August 2004
  • From: The 17th hole at TPC
  • 2,283 posts
Posted by n012944 on Wednesday, April 12, 2023 6:46 PM

GrandTrunkWestern

 

 
diningcar

The Nevada Legislature is considering legislation that would limit trains to a length of 7500 feet.

 

 

 

Well lets hope it passes!

 

 

Why?

An "expensive model collector"

  • Member since
    September 2013
  • 2,505 posts
Posted by caldreamer on Wednesday, April 12, 2023 8:04 PM

Even if it passes, there will be a blizzard in Guam before it can be enforced.  As previously stated, federal law superceeds ALL state and local laws. It will be overturned so fast the Nevada lpoliticians will never know what hit them.  This is a useless show that is all for local consumption.

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Thursday, April 13, 2023 10:03 AM

Among the grab bag of regulations being cobbled together under the so-called Rail Safety Act currently under consideration is the same 7500 foot train length restriction.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    September 2003
  • 21,669 posts
Posted by Overmod on Thursday, April 13, 2023 10:18 AM

CSSHEGEWISCH
Among the grab bag of regulations being cobbled together under the so-called Rail Safety Act currently under consideration is the same 7500-foot train length restriction.

Seems to me this would founder on the same grounds the 83-car restriction in the late '30s did: there is no provable connection between safety and nominally-shorter trains.  On the other hand, I think there is growing support for a 'hard' 15-minute limit on continuously blocking a crossing -- note that this could easily be extended to overlapping trains on adjacent tracks -- with the added teeth of the (vastly!) increased scope of penalties that can be inflicted on a railroad.

Of course, they could always try mandating that any train in excess of 7500 feet have ECP or comparable service brakes.  Being sure to leave that word in as essential...

  • Member since
    July 2008
  • 2,325 posts
Posted by rdamon on Thursday, April 13, 2023 12:19 PM
I wonder where the first local sheriff with a tape measure will be?
What do you mean, slack?
  • Member since
    July 2016
  • 2,631 posts
Posted by Backshop on Thursday, April 13, 2023 1:11 PM

The railroads are always talking about "reduced crews".  Isn't that what long trains basically are?  I remember when the Detroit Edison trains at 120 cars were considered long.  Now, that short.  Put two together and you reduced to train crews to one.

  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Thursday, April 13, 2023 1:13 PM

Backshop

The railroads are always talking about "reduced crews".  Isn't that what long trains basically are?  I remember when the Detroit Edison trains at 120 cars were considered long.  Now, that short.  Put two together and you reduced to train crews to one.

 

Until the train can't get to the terminal because of congestion (From another huge train), so it gets tied down on the main.  Then you need to send another crew to go get it.  But hey, we cut a crew!

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, April 13, 2023 1:59 PM

zugmann
 
Backshop

The railroads are always talking about "reduced crews".  Isn't that what long trains basically are?  I remember when the Detroit Edison trains at 120 cars were considered long.  Now, that short.  Put two together and you reduced to train crews to one. 

Until the train can't get to the terminal because of congestion (From another huge train), so it gets tied down on the main.  Then you need to send another crew to go get it.  But hey, we cut a crew!

And the Dispatcher's metrics get dinged because of the time it took to get the train from orign to destination, when the train was held out on line of road by the destination terminal, or crew change point that didn't have crews to permit the train to move through without becoming the cork in the bottle..

Never too old to have a happy childhood!

              

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Thursday, April 13, 2023 9:00 PM

zugmann

 

 
Backshop

The railroads are always talking about "reduced crews".  Isn't that what long trains basically are?  I remember when the Detroit Edison trains at 120 cars were considered long.  Now, that short.  Put two together and you reduced to train crews to one.

 

 

 

Until the train can't get to the terminal because of congestion (From another huge train), so it gets tied down on the main.  Then you need to send another crew to go get it.  But hey, we cut a crew!

 

As long as you don't count the on line recrew.  And often trains are recrewed because something happens and the train ends up in two or three pieces because the stresses of all that weight and length are placed on the well maintained (Whistling) rolling stock. 

Most terminals can only work so many trains at a time.  It seems like all the working trains show up around the same time.  No matter how they tweak schedules. 

Today I had to triple into my home terminal.  The last move was only about 8 cars, but it temporarily takes a 3200 foot track out of use or limits it's usefullness for other trains needing to work.  It was a manifest that was extended beyond it's planned destination to relieve pressure on that original destination.

The long trains don't really save that much all things considered.  Even when they don't get recrewed.  It's how you allocate the costs that count.

States can regulate truck lengths and trailer combinations.  Iowa used to prohibit 65 foot double trailer combinations.  That's allowed now, but some of the other longer combinations that some states allow aren't.  Why isn't that considered regulation of interstate commerce?

Jeff

 

  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Thursday, April 13, 2023 9:45 PM

jeffhergert
Most terminals can only work so many trains at a time.  It seems like all the working trains show up around the same time.  No matter how they tweak schedules. 

Joekoh's favorite statement when things get clogged up around Deshler - "time to get out the plunger..."

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, April 13, 2023 10:51 PM

tree68
 
jeffhergert
Most terminals can only work so many trains at a time.  It seems like all the working trains show up around the same time.  No matter how they tweak schedules.  

Joekoh's favorite statement when things get clogged up around Deshler - "time to get out the plunger..."

For the most part - Terminals have not been DESIGNED to handle the size of trains being operated.

In the ideal world, the destination terminal would have at 15K foot or longer Receiving Yard track to yard the train on arrival.  By the same token the originating terminal would have a 15K foot or longer Departure Yard track so that the train can depart without having to double together multiple tracks for the final train.

The productivity of todays terminals is severly constrained when yarding or dispatching trains tie up the leads on one end of the yard or the other preventing other yard jobs from doing productive work on that end of the yard.

Back in the 1990's when I was assigned to the Atlanta Division, the auto ramp at Lawrenceville, GA had 10 trains scheduled to work at the facility with a scheduled dwell of 20 hours at the facility.  Facility was located on a single track subdivision that had a normal, non-stop, running time of 40 minutes between control points on either end.  Talk about congestion.

Never too old to have a happy childhood!

              

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy