Login
or
Register
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Home
»
Model Railroader
»
Forums
»
Prototype information for the modeler
»
Uses of Plate Girder Bridges
Uses of Plate Girder Bridges
3609 views
10 replies
Order Ascending
Order Descending
underworld
Member since
February 2005
1,821 posts
Posted by
underworld
on Friday, March 25, 2005 11:01 PM
Like dehusman said.....many cases they are recycled....it's what they had on hand. Just a question of transportation and installation.
underworld
Easter Easter Easter Easter Easter!!!!!
[:D][:D][:D][:D][:D]
currently on Tour with Sleeper Cell myspace.com/sleepercellrock Sleeper Cell is @ Checkers in Bowling Green Ohio 12/31/2009 come on out to the party!!! we will be shooting more video for MTVs The Making of a Metal Band
Reply
Anonymous
Member since
April 2003
305,205 posts
Posted by
Anonymous
on Friday, March 18, 2005 4:06 PM
Since nobody has given "my" answer yet, here it is: Assuming you are asking about [older] steel bridges, the railoads generally prefer bridges with the supporting structure below the tracks, as it is cheaper. The weight of the train is transferred via the rails to the ties, so the structure thoretically has to be no wider than the ties - the rest, i.e. walkways etc. is "cosmetic". If clearance below is a problem, they go to a steel structure above the rails, but this neccessitates cross girders to take the weight to the outside of the train, i.e. 12 - 15 ft wide, more if there are walkways etc. These structures are normally not designed to keep derailed equipment on the roadway, as well maintained trains on well maintained roadbeds proceeding at the prescribed speed do not derail.
[Sorry, no decorations, this is my first comment]
PAC in Canada.
Reply
Edit
ndbprr
Member since
September 2002
7,486 posts
Posted by
ndbprr
on Saturday, March 12, 2005 8:53 AM
The railroad engineering departments will always use the state of the art but in the case of the PRR that was steel in 1900 when they were built so the bridges are now nearly 100 years old on many parts of the corridor. Plus over the years as is typical the ballast has built up to where 6" to 1' of the bridge is all that is visible from the track level. Now a steel bridge could be immersed in water and show no ill effects after all that time but add oxygen and the rusting could be severe. Just speculation but at some time every one of those bridges will need to be replaced. Maybe soon or maybe in another 100 years.
Reply
Anonymous
Member since
April 2003
305,205 posts
Posted by
Anonymous
on Friday, March 11, 2005 5:22 PM
Most railrods now use concrete girders where they can, say up to 100-ft spans, beyond that if headroom is enough, they want deck girders. All new bridges will have either a steel pan or concrete pan to hold the ballast, normally 0.5 feet deep below the tie. Through girders have to be braced from the transverse floor beams up to the top of the through girder, thus adding width. The through girgers, as mentioned above, have transverse floor beams 24 to 36-inches in depth placed 3 to 4 feet on centers.
The concrete girders used are "I" shaped like the ones used on highways. With either, the concrete pan is "Composite", meaning that it helps the girders carry the load. Don't forget that many bridges will have a walkway too. Especially if they are long, turn outs close, or for any other reason that the crewmay have to walk the bridge. Also, increase width if bridge is in a curve.
Reply
Edit
Anonymous
Member since
April 2003
305,205 posts
Posted by
Anonymous
on Friday, March 11, 2005 12:12 PM
It is important to understand that even a thru plate girder has as much as a foot or so of steel structure under the roadbed that connects the girders and carries the weight of the roadbed and trains while it also braces the girders so that they remain vertical under the rolling loads. If it is a ballasted deck, there is also normally a layer of concrete on top of the steel that acts like a "tray" to hold the ballast. Thus, even on a thru truss, the girders still project a couple of feet below the track, not a fraction of an inch like in the typically available plastic models.
CJ Riley
Reply
Edit
mvlandsw
Member since
December 2001
1,190 posts
Posted by
mvlandsw
on Friday, March 11, 2005 2:11 AM
There is one on the NS ex PRR line that crosses over the CSX ex B&O line in Ravenna, Ohio with holes rusted through the girder.
Reply
ndbprr
Member since
September 2002
7,486 posts
Posted by
ndbprr
on Saturday, March 5, 2005 2:28 PM
That is the way they are on the old PRR corridor in Philly. You can barely see the curve on the ends from the horizontal to the vertical members. Wonder what kind of condition things are under all that rock and dirt and how they check them?
Reply
Anonymous
Member since
April 2003
305,205 posts
Posted by
Anonymous
on Friday, March 4, 2005 3:37 PM
Most of the girder bridges I have worked on or seen were filled almost to the top with ballast leaving only about a foot above grade. That is also how I modeled them on my layout .
Reply
Edit
Anonymous
Member since
April 2003
305,205 posts
Posted by
Anonymous
on Wednesday, March 2, 2005 6:26 PM
For tracks over a roadway, even when clearance is not a problem, the railroad would prefer to use a through girder bridge. This type is better able to keep a derailed car on the bridge, and provides protection (for the vehicles on the roadway) in the event that anything falls off of a train car while on the bridge. It also allows better access for maintenance of the track and roadbed without interfering with traffic below.
Regards- Richard W.
Reply
Edit
dehusman
Member since
September 2003
From: Omaha, NE
10,621 posts
Posted by
dehusman
on Wednesday, March 2, 2005 10:46 AM
They "recycled" an old bridge and that's the type they had available.
Dave H.
Dave H. Painted side goes up. My website : wnbranch.com
Reply
gd891
Member since
March 2004
9 posts
Uses of Plate Girder Bridges
Posted by
gd891
on Wednesday, March 2, 2005 8:53 AM
My understanding is that a prototype would prefer to use a deck girder bridge instead of a through-plate girder bridge because the latter can interfere with wide loads. However the through bridge also provides better clearance to anything below.
Thus, is the only place the prototype going to use a through girder bridge in situations where they need the clearance? I.E. over a automobile roadway or over another railroad.
Or, are there other reasons they would use a through girder bridge?
TIA, Greg
Reply
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Users Online
There are no community member online
Search the Community
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter
See all
Sign up for our FREE e-newsletter
and get model railroad news in your inbox!
Sign up