Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

EMD NW2

2171 views
10 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2011
  • From: Brooklyn, NY
  • 426 posts
Posted by Mike Kieran on Tuesday, March 6, 2018 8:36 AM
Thanks guys. The upgrade to a 567AC didn't mean horsepower increase. Thanks for your help.

__________________________________________________________________

Mike Kieran

Port Able Railway

I just do what the majority of the voices in my head vote on.

  • Member since
    September 2003
  • 21,669 posts
Posted by Overmod on Monday, March 5, 2018 5:41 PM

No horsepower increase for 645 swaps (block and crank would not like it); it's strictly to ease parts availability.  Yes, you have to do several other things to restore rotating balance, but those too are internal...

  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Monday, March 5, 2018 5:20 PM

 The only real difference seems to be the way the water pump feeds the block. Installed in a loco, you almost wouldn;t even see it. The rest of the changes are internal. It's this change which allows 645 power assemblies to be used in a 567 block, for a bump in horsepower. That too would be invisible from outside the engine block, you'd have to open it up and look at the power assembly to see it was a 645 and not a 567.

                                            --Randy


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    January 2017
  • From: Southern Florida Gulf Coast
  • 18,255 posts
Posted by SeeYou190 on Monday, March 5, 2018 3:40 PM

What would the differences (external) be from a 567 to a 567A to a 567AC?

.

Thanks.

.

-Kevin

.

Living the dream.

  • Member since
    January 2001
  • From: SE Minnesota
  • 6,847 posts
Posted by jrbernier on Monday, March 5, 2018 1:20 PM

  The 567AC was a very popular upgrade to the 567A power plant.  New top end to the power assemblies that reduced water coolant leakage.

Modeling BNSF  and Milwaukee Road in SW Wisconsin

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Monday, March 5, 2018 1:07 PM

OK, since non of us new that from your original post, what about a roster of GN NW2's from rrpicturearchives.  Not sure if this will help you.

http://www.rrpicturearchives.net/locolist.aspx?id=GN&mid=70

Mike.

  • Member since
    January 2011
  • From: Brooklyn, NY
  • 426 posts
Posted by Mike Kieran on Monday, March 5, 2018 12:47 PM
I plan on doing some detailing of Kato NW2s. My problem with Wikipedia is that the NW2s built for Great Northern showed Phase 3 louvres (no space for lettering). There is some kind of misinformation somewhere, I just don't know where. That's why I posted the question.

__________________________________________________________________

Mike Kieran

Port Able Railway

I just do what the majority of the voices in my head vote on.

  • Member since
    September 2003
  • From: California - moved to North Carolina 2018
  • 4,422 posts
Posted by DSchmitt on Monday, March 5, 2018 12:29 PM

This article lists 567 engine models 

https://en.wikipedia.org/wiki/EMD_567

 

 

I tried to sell my two cents worth, but no one would give me a plug nickel for it.

I don't have a leg to stand on.

  • Member since
    May 2004
  • 7,500 posts
Posted by 7j43k on Monday, March 5, 2018 12:18 PM

Mike Kieran

I have a question about Phase 2 EMD NW2 switchers built in 1945.

Would 567A engines be in Phase 2 EMD NW2 switchers built in 1945? 

 

According to a Great Northern diagram book, their NW2's GN 145-150 had 567A's, and were built 8-9/1945.  I'll leave you to determine the phase.  And whether that info is useful.

 

Ed

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Monday, March 5, 2018 12:17 PM

Mike Kieran
Would 567A engines be in Phase 2 EMD NW2 switchers built in 1945?

According to Wiki, yes.  The 567 and the 567A.

https://en.wikipedia.org/wiki/EMD_NW2

I don't know about the AC part.

Mike.

  • Member since
    January 2011
  • From: Brooklyn, NY
  • 426 posts
EMD NW2
Posted by Mike Kieran on Monday, March 5, 2018 12:04 PM

I have a question about Phase 2 EMD NW2 switchers built in 1945.

Would 567A engines be in Phase 2 EMD NW2 switchers built in 1945? In later rebuilding upgrade programs, could they be upgraded to 567ACs and would they get an increase in horsepower?

__________________________________________________________________

Mike Kieran

Port Able Railway

I just do what the majority of the voices in my head vote on.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!