Trains.com

Delta Northern Ver10

4618 views
13 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Sunday, September 23, 2012 8:26 AM

This is the last post for now, Tree trimmers are schediled for 10/21/12 I will start a new post Titled Delta Northern V10, Part II after clean up is completed. hopefully before the winter rains start.

Dave

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Tuesday, September 18, 2012 5:18 PM

New pictures as of 09/18/12

#1 looking north  24 ft.

#2 near station

#3 return to mainline

 

#4 return to south from sect-2

#5 looking west at Leaf ( snow ) shead under construction.

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Tuesday, September 11, 2012 9:24 AM

Before i had section 2 done I went to VER10.1 of the track plan, and changed section 1 it's now  24" to 32" and back to 24" deep I added more room for the station and a stub track for eng serviceing. And section 2 is now 16' instead for 24' deep. Picture's latter in the week. Also wood storage has been moved to section 2. The start of section2 can be seen in picture #4 above.

Dave

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Sunday, September 9, 2012 10:55 AM

Picture's:

1. Section one

2: What I did with 280 or so concreate blocks from subroadbed

3.Temporay building storage ( may become winter storage )

4. Work area and wood storage.

As you can see my space is limited. The wood will be stored on top of section one, with the containers under.

Dave

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Saturday, September 8, 2012 10:36 AM

Update: Today I should have the framing done for two of three sides. it's been rought working with warped 2x6's that were true and dry when I purchesed them. And doing a better job of perp work would have helped. it seem's as though whenever I start work I have to do somthing else that kills the cool mornings. and leaves the hot ( sunny ) afternoons, Things should go faster now that first section is complete and level end to end, front to back. I did lose 25% of the front to back because of leg placement. Picture's on sunday maybe..........

Dave

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Tuesday, September 4, 2012 9:28 AM

UPDATE: As of 11 am on 31 aug 2012 the last bit of track and roadbead were removed Ver 9 is history.

Today is when I will start building the new ( V10 ) rr. I did not start last week as I had pressing priorty's. AKA finnish useing up brick from roadbed and long weekend out of town. So Ver 10 construction begins today in about 1 hour or so. I do plan on pictures as i go..............

Dave

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Tuesday, August 21, 2012 1:56 PM

UPDATE: 37ft or so left to dig up, all of the 4 track and the station areas are done just some minor backfilling to do. Didn't get much done, due to inhaleing to much rock dust. better now. wetting down rock ( ballist ) work areas the night before helps . The more I look at at what i have to work with the more my plans change. I am thinking of trading space's with the CFO, Me taking most of the area that is already rocked over ( was a weed pit ) and giving up the most of new section and just puting in a singel track there.

all for now.

Dave  

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Thursday, August 16, 2012 8:25 AM

After digging up 200+ bricks i still have about 70 ft to go. All of the bricks have become pavers for the last part of are backyard that needed work 8x10 area in front of one of my train sheads. and i will have some leftovers to use as feet for the new RR, I added a mason's line to use as a guide for how high it will be . Looking at it my RR looks like it climes 18 inchs from one side of the yard to the other....

thats all for now

Dave 

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Monday, August 6, 2012 7:53 AM

Starting work today on framing, still have 150 bricks to dig up from old roadbed plus 25ft of track to disassamble. was able to recover some pictures from photobucket. seem to be ver 8.5. will post a vidio of ver 9.0 soon.

Dave

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    October 2010
  • From: Centennial, CO
  • 3,218 posts
Posted by Stourbridge Lion on Tuesday, July 31, 2012 4:00 PM

dwbeckett

No Pictures I seem to have misplaced my pictures since I upgraded my hard drive.

YIKES! / OUCH! Crying

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Tuesday, July 31, 2012 3:57 PM

No Pictures I seem to have misplaced my pictures since I upgraded my hard drive.

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Thursday, July 26, 2012 9:27 AM

Pictures will be coming soon, working on a project with my son first. Some before pictures will be posted this weekend. We plan to add a water feture with a closed system, that plan will use a 5 gal bucket for capture and recerulation, hopefully that will be enought water for the system. I do have two larger storage tubs that i could reinforce to use for water storage. we have had some case's of West Nile in the area so I need to eliminate any standing water. I plan on using most of my original track plan minus the two 45' passing sideings . I am planing on adding a 5 or 6.5 ft diamiter loop for a street car that will be the last thing i do.

 

Dave

 

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    February 2007
  • From: Arizona (high country 7k ft) USA
  • 676 posts
Posted by Rex in Pinetop on Tuesday, July 24, 2012 3:46 PM

Dave we love progress pictures so keep us updated and congrats on getting started.

Rex

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Delta Northern Ver10
Posted by dwbeckett on Tuesday, July 24, 2012 2:04 PM

Well it had to happen sooner or never. So I picked sooner, V 10 will be above ground ( 3ft ). with planting areas, a false mountin for a back drop and maybe one tunnel ( 2 track ) that should eliminate some track cleaning ...........thats all for now................

Dave

 

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

Search the Community

FREE EMAIL NEWSLETTER

Get the Garden Railways newsletter delivered to your inbox twice a month

By signing up you may also receive occasional reader surveys and special offers from Garden Railways magazine. Please view our privacy policy