TCA member Dick Reichard has developed a protoype of a gauntlet section out of 027 track. Dick is a craftsman supreme and had a prototype at Spring 2006 York. It was exceedingly cleverly done. Of course, Dick is a mechanical engineer by schooling. Here is a link to an article he wrote about making ones own switches:
http://www.tcamembers.org/articles/operating/marxsw/index.html
Dick built a double crossover in "Super O" which is incredible as well.
Very best, Mike
Nothing is more fairly distributed than common sense: no one thinks he needs more of it than he already has.
I think this would be probematic with respect to center-rail pickups and the shoes for uncoupling and operating cars. If the rails of one track are evenly spaced between those for the other track, they would operate as uncoupling-operating rails for the other track. If they are closely spaced, the center rails would probably be bridged by the pickups.
A possible practical arrangement would be to use the center rail of one track as an outside rail of the other. This would limit the number of rails to 4; but you would need to switch power connections according to which track is in use.
Bob Nelson
Our community is FREE to join. To participate you must either login or register for an account.
Get the Classic Toy Trains newsletter delivered to your inbox twice a month