Trains.com

1947 Lionel smoke unit piston crankshaft installation

1188 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2014
  • 3 posts
1947 Lionel smoke unit piston crankshaft installation
Posted by Nobles1 on Tuesday, July 29, 2014 10:42 PM
I am attempting to rebuild a 1947 Lionel 2025 locomotive and with a little research have been able to get it running again. But I have one problem, the smoke piston crankshaft (Lionel part #695-13) was loose inside the locomotive shell before I disassembled the unit. I cannot figure how this crankshaft in installed to operate the puffing piston. Any clues on how to properly install this crankshaft would be greatly appreciated.
  • Member since
    October 2011
  • 969 posts
Posted by TrainLarry on Wednesday, July 30, 2014 1:31 PM

Install the smoke unit and piston with the boiler casting upside down. The large U shaped part of the shaft contacts the bottom of the piston, and the ends fit in the slots in the bottom of the boiler casting with the longer bent end facing the boilers' left side (when the boiler is upright).

Larry

  • Member since
    July 2014
  • 3 posts
Posted by Nobles1 on Wednesday, July 30, 2014 3:23 PM
Thanks! I was looking at it completely backwards Overthinking it I guess. I hooked it up per your directions and it works great, Thanks again.
  • Member since
    October 2011
  • 969 posts
Posted by TrainLarry on Wednesday, July 30, 2014 3:40 PM

Your welcome. Let 'er smoke!

Larry

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

FREE EMAIL NEWSLETTER

Get the Classic Toy Trains newsletter delivered to your inbox twice a month