Trestles Options for Tube Track?I'm curious what the various trestle options are, about their merits and how they compare etc. This would be for O31 or O27 track. Options I can think of include:Marx Lionel PWModern LionelOther (MTH?)
thanks
"PW" always strikes me as being as ambiguous as I am pertinacious...;-)
Bob Nelson
Lionel PW - Post War era (but you knew that right? )
lionelsoni... as I am pertinacious...;-)
I had to stop and look that one up.... One is never too old to expand one's vocabulary...
Oh, and add K-Line to the list, although the new K-Lionel branded box will cost you @ twice as much as before, if memory serves...
pgtrOther
Build your own:
This is all made from quarter square lengths available at Home Depot. $0.69 for a three foot length.
After building one support, I made a jig by banging thin nails into the workbench and built the others from that pattern.
I placed these without support and used weights on teh track to hold them in place. Once all were square, I put in all of the cross members while the bridge was standing in place.
You can do this in a couple of nights work, if this is suitable to your needs.
pgtr Lionel PW - Post War era (but you knew that right? )
Perhaps Bob's point is that if PW stands for "Postwar" with such certainty," how does one specify "Prewar?"
I believe he has raised this issue previously in this forum, which might account for his use of the fancy word.
Of course, which war remains ambiguous....
>
Not to hi-jack, Hey Frank, how's that ceiling work for track sound deading? Thanks
stubbsONot to hi-jack,
It's already been hi-jacked from trestles to what does PW stand for. I tried giving some feedback to the original posters subject.
stubbsOhow's that ceiling work for track sound deading?
Just ok - a little louder than I would like it to be.
Frank,
That is outstanding! Two questions, both of which I can't quite tell from the pictures:
1. Did you built a deck to go under the track or not?
2. Because your trestles are on a curve, did you come up with a formula for what angle to cut the cross braces, did you sand them to fit, or just use 90 degree's and leave a gap?
I'm getting close to where I need to build a curved trestle using the Grand Central Gems pieces from Scenic Express, and am not quite sure of the degree I will need to cut the pieces, especially the deck.
For some reason, I don't have any photos of the top bracing.
I put a "bent" beneath each tubular tie. I ran a straight quarter inch square section from bent to bent and cut and sanded these to fit to make a joint. Once these were all placed and the trestle was positioned, I glued extra wood ties to the bridge. I also glued wood ties in place inside the open frame of the Lionel metal tie. Once all the glue had dried, I screwed through the metal ties into the wood ties to hold the track firmly to the bridge. This bridge is incredibly strong as I place my weight on it when climbing down from the train table and use it as a "grab handle" when climbing up.
I shot a quick photo of how it is attached for you:
Thank You Frank! That last picture showed me what I wanted to know. Again, that's one nice trestle. I hope mine turns out as well...
Great job building that trestle. I think I now have an idea how to add an upper level to my layout!!
George
I always used the old brown lionel trestles for 027, they worked well with that plastic thing at the top that locks the 2 tracks together. Not used any other. Heights scare my engineers.
Man that is one cool loop of track there.
Our community is FREE to join. To participate you must either login or register for an account.
Get the Classic Toy Trains newsletter delivered to your inbox twice a month