Proposed NEC Realignment for 220 mph operation raises some local opposition
Posted by CMStPnP on Tuesday, May 9, 2017 7:46 PM

Interesting, the FRA is further along than I thought on the NY to Boston segment.

http://wpri.com/2016/12/23/charlestown-residents-sound-alarm-over-surprise-federal-railroad-plan/

 

  • Member since
    September 2011
  • 6,449 posts
Posted by MidlandMike on Wednesday, May 10, 2017 7:40 PM

When Amtrak previously showed an alternative direct line to Boston, bypassing Providence, the Rhode Islanders seem to have killed that option.  Maybe it's time to dust off that bypass plan.

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, May 11, 2017 8:03 AM

Typical NIMBY BANNA stuff - and then they will complain that the US doesn't have any REAL High Speed Rail

Never too old to have a happy childhood!

              

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Thursday, May 11, 2017 8:27 AM

Someone with the math skills needs to figure how much time will be saved.  Figure base line present speeds, 160 MPH including reasonable acceleration when on segment and slowing before leaving segment.  Then 220 MPH when on segment then slowing before exiting segment.

 

RME
  • Member since
    March 2016
  • 2,073 posts
Posted by RME on Thursday, May 11, 2017 8:55 AM

Look at this in common with the Cross Harbor Tunnel thread.

Most of the people -- presumably, voters -- who live in the vicinity of HSR rights-of-way derive even less benefit than they would if an 'Interstate runs through the front yard'.  Chinese wall (with draconian penalties in the 21st Century for 'trespassing'; noise, the every-present possibility of neighborhood disruption in the case of incident or accident.  If the tracks were 'upgraded' from regional, they may even have lower or worse rail service than before, as they might well have to endure local stops to get to wherever they can board the high-speed train effectively.  It would take far-sighted and altruistic people indeed to wish such a thing on their backyard rather than some other body's.  And it isn't too surprising that their local elected representatives would represent their voters' "best interests" rather than those of, say, the likely beneficiaries of American HSR service.

Compare the Brooklyn and Queens 'victims' of the approach and connections to the Cross Harbor Tunnel.  The amount of 'benefit' they would derive from diversion of road traffic is comparatively slight; the amount of increased exhaust and noise likely considerable'; the construction impact immense and the neighborhood presence ... I can't imagine it would be much different from the Alameda Connector all the way out of the boroughs ... an ongoing annoyance.  And as an added annoyance, very little if any of the traffic through the tunnel would be 'local' freight quickly available for local delivery; it would far more likely move through to the 'nearest' convenient intermodal point and be backhauled or transshipped/warehoused for local truck delivery, far slower than just running the freight by truck on existing roads across the Hudson and then Manhattan. 

If you go back to the earliest days of railroads, or pipelines, you see just the same thing at work, for the same or fundamentally similar reasons.  That is one reason that eminent-domain principles were enacted, and in these cases we can expect similar action: the 'best interests of the majority' riding roughshod over the poor affected 'few' for the minimum compensation that folks riding the bottom line can jigger. 

The great problem I see with any prospective American HSR is that only a limited demographic is going to ride it, and (as with some of the Midwest projects) the actual benefits in station-to-station time saving can be ridiculously slight.  Much of the economics works the way it did for New York-area commuter-rail in the Fifties: the demand is clearly there, but the cost of the improvements and specialized equipment is not.  A constant theme we see in forum posts is including the 'below-the-rail' costs of the NEC in an analysis of its 'profitability', and even with the dramatic improvements in tracklaying and maintenance equipment that have occurred so far, I don't see the cost of providing, maintaining, and securing true high-speed infrastructure coming down very far, if at all, from high levels. 

It would be a somewhat different thing, technically, if there were extensive 220mph operation on the class 9 track.  Unfortunately, that largely rules out Providence as an effective NEC stop on most any route that would include it unless you adopt thoroughly non-fuel-efficient acceleration and deceleration profiles.  Probably either Wilmington or Baltimore, too, so you can expect those cities to be served by trains built and operated to much lower peak speed -- arguably as low as 125mph maximum.  So the full benefit of HSR in the Corridor is for those people who want to save a few minutes between large cities, but who don't have VIP access at airports or can't afford private jet transport.  Even at the ragged trailing edge of adoption, 30 years from now when the first-generation HSR equipment is repurposed to low-price transport (as in France with the early but still potent TGV sets) I doubt that even if every seat, every train is filled it would pay for all the sunk cost of 220mph improvement. 

So there has to be the political will to ... I don't know, throw away billions on something that contributes dubiously to the domestic image of national prestige.  We see three very different pictures of this ... and the supporting economics ... in Florida, Texas, and California.  Now, I'm a train lover and supporter, and have long been an advocate of true high-speed rail or guideway transportation; I think a case can be made for HSR at a number of levels, and clearly for true HSR in some services or corridors.  But don't expect me to defend it to the folks backed up to a trench or embankment.

When I was planning 225mph HSR in the early '70s, one assumption was that most of the mileage was (as, I thought, on the New Tokaido Line) going to run at considerable elevation on viaducts and bridges (with 'stuff' underneath them largely unperturbed after construction) and developed systems to put this in place as 'cost-effectively' as possible (it wasn't at all cost-effective compared to what the LGV development entailed a decade later).  The part of the NEC being discussed with this 'raises some local opposition' thread is an example of great inconvenience being made for ridiculously little return in the near future, and no effective return I can see for the proposed 'second spine' routings.  I am not sure I understand how claims the US has some REAL High Speed Rail for a few unexploitable miles here and there, or improvements that save a whopping two minutes of end-to-end trip time for the millions or billions spent, are an improvement here.

  • Member since
    June 2009
  • From: Dallas, TX
  • 6,952 posts
Posted by CMStPnP on Thursday, May 11, 2017 12:26 PM

blue streak 1

Someone with the math skills needs to figure how much time will be saved.  Figure base line present speeds, 160 MPH including reasonable acceleration when on segment and slowing before leaving segment.  Then 220 MPH when on segment then slowing before exiting segment.

Didn't they say 45 minutes?

RME
  • Member since
    March 2016
  • 2,073 posts
Posted by RME on Thursday, May 11, 2017 2:15 PM

CMStPnP
Didn't they say 45 minutes?

Yes, but even if someone figures out Mrs. Todd's Shortcut for trains, you couldn't possibly save that time in Rhode Island.

That number looks a bit like the putative time saving for the whole Boston-New York segment for one of the 220mph-capable projects.  You need to examine these very carefully to see how the 'time saving' was calculated.  Avoid any that simply substitute speed for distance instead of using the kind of detail analysis that was, say, in the 1967 United Aircraft proposal for part of the Water Level Route -- that was an engineer's way of looking at the thing.  Slow sections, net of deceleration and then reacceleration, eat dramatically into achieved 'average trip speed' and hence the associated trip time reduction of nominal higher speed.

For a good step-by-step illustration of what approaches might be involved in fast running on the north end of the NEC at higher peak speed might be like, read the Classic Trains account of one of the Super C trips (I think by Jack Elwood in special issue 7 on 'fast trains').

  • Member since
    July 2006
  • 9,610 posts
Posted by schlimm on Thursday, May 11, 2017 5:55 PM

RME
For a good step-by-step illustration of what approaches might be involved in fast running on the north end of the NEC at higher peak speed might be like, read the Classic Trains account of one of the Super C trips (I think by Jack Elwood in special issue 7 on 'fast trains').

A closer comparison would be the electrified passenger trains on German Rail: an ICE Hamburg to Munich: 381 miles, eight intermediate stops, most around 6 hours.

C&NW, CA&E, MILW, CGW and IC fan

RME
  • Member since
    March 2016
  • 2,073 posts
Posted by RME on Thursday, May 11, 2017 8:44 PM

schlimm
A closer comparison would be the electrified passenger trains on German Rail: an ICE Hamburg to Munich: 381 miles, eight intermediate stops, most around 6 hours.

Do we have a comparable curve-by-curve analysis of that run that could be compared with Elwood's (granted, there is probably as much computerized 'cruise control' on the ICE as on the TGVs, but it would be possible to see what the computer is commanding for throttle and brake applications, and the signal-system settings)

I am lamentably unaware of the topo between Hamburg and Munich, or if the line has been substantially 'improved' in profile since steam days.  Are there sections similar to the Shore Line 'as it would be improved' (or the likely way the 'preferred Hartford alternative' would be routed?) and aren't the dwell times much, much shorter at those intermediate stops than Amtrak's?  Something that would be interesting would be a tabulation of the mileage (of the 381 total) that is run at particular ranges of speed, and in particular the percentage of miles run at the nominal 'high speed' for the equipment design.

  • Member since
    June 2009
  • From: Dallas, TX
  • 6,952 posts
Posted by CMStPnP on Friday, May 12, 2017 9:03 AM

I must say I like this proposal better than the last one that had a totally new NEC going to/from Boston via Hartford, CT.     I think this realignment is more reasonable as far as costs are concerned and it has the incrementalism vs all at once that Amtrak seems to be better at managing.    I hope they get the money they need from the Feds.    Hopefully the NY to DC alignment changes are also kept modest and the costs lower than these grandiose schemes first proposed.

  • Member since
    July 2006
  • 9,610 posts
Posted by schlimm on Friday, May 12, 2017 5:51 PM

RME

 

 
schlimm
A closer comparison would be the electrified passenger trains on German Rail: an ICE Hamburg to Munich: 381 miles, eight intermediate stops, most around 6 hours.

 

Do we have a comparable curve-by-curve analysis of that run that could be compared with Elwood's (granted, there is probably as much computerized 'cruise control' on the ICE as on the TGVs, but it would be possible to see what the computer is commanding for throttle and brake applications, and the signal-system settings)

I am lamentably unaware of the topo between Hamburg and Munich, or if the line has been substantially 'improved' in profile since steam days.  Are there sections similar to the Shore Line 'as it would be improved' (or the likely way the 'preferred Hartford alternative' would be routed?) and aren't the dwell times much, much shorter at those intermediate stops than Amtrak's?  Something that would be interesting would be a tabulation of the mileage (of the 381 total) that is run at particular ranges of speed, and in particular the percentage of miles run at the nominal 'high speed' for the equipment design.

 

Several stretches have been realigned and improved to reach 280-300 kmh limits since steam days (50-60 years ago, I guess), notably Uelzen to Hannover and Nuremberg south through Ingolstadt.  Dwell times are typically very short - 2-3 minutes - because all doors on trains open without conductor assistance.  You really owe it to yourself to make some journeys into the 21st century, RME.

C&NW, CA&E, MILW, CGW and IC fan

  • Member since
    June 2009
  • From: Dallas, TX
  • 6,952 posts
Posted by CMStPnP on Friday, May 12, 2017 7:24 PM

I rode Bremen to Munich back when I was stationed in the Army using the train as a rolling hotel.    Boarded Friday night around midnight or 12:30 a.m.   Train was in Munich about 7:30 or 8:00 a.m.    Just in time to wake up, and get off the train.    The whole trip was 2nd class......and I never did that again.    Had to share the sleeping compartment with 4 other strangers (it slept 6 total in 2nd Class......3 tiered bunk bed on each wall)    Departed Munich around 11-12 p.m. Saturday night after a full day at Ocktoberfest then back in Bremen the next morning.   Full day at the festival, no hotel bill, just the price of transport.

Interesting it is down to 6 hours now.

Remember one time riding the train via Nuereumburg to Munich and seeing the huge World War II era Nazi built stadium next to the tracks, where they had the mass rallies we frequently see on old newsreals from that time........that thing had to be at least a mile or mile and a half long......TV did not do it justice as to the real scale of the structure.

RME
  • Member since
    March 2016
  • 2,073 posts
Posted by RME on Friday, May 12, 2017 9:18 PM

schlimm
You really owe it to yourself to make some journeys into the 21st century, RME.

That is the truth -- I have done all the tech, but haven't ridden any of the modern trains since the second-generation TGV.

There are a couple of YouTube videos that give me some of the flavor of the newer German construction - probably more than if I rode in a regular seat looking out.  Makes me more than a little irritated that we have so little opportunity or incentive to build comparable services.

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, May 13, 2017 10:36 AM

RME
I am lamentably unaware of the topo between Hamburg and Munich, or if the line has been substantially 'improved' in profile since steam days.

I can't help with a curve by curve analysis.But here is some additional information. The linked map shows the speeds in km/h (0.621 mph) the sections were designed or upgraded for. https://upload.wikimedia.org/wikipedia/commons/e/eb/ICEtracks.png
 
The ICE Hamburg to Munich runs via Hannover, Goettingen, Kassel-Wilhelmshöhe, Fulda, Wuerzburg, and Nuremberg. The shortest run time is 5-3/4 hours. In the 1980s it was about 8-1/2 hours.

From Hamburg to about 19 miles behind Hannover we are on the relatively flat North German Plain.
 
The high-speed rail line Hannover to Wuerzburg has  minimum curves of 23,000 ft in exceptional cases 16,700 ft. As the line is used by freight trains too the grade is limited to 1.25%. The height lies between +164 ft and 1234 ft.
 
The track section between Hannover and Goettingen is relatively flat for 19 miles, the rest has 8.7 miles in tunnels.
 
The section Goettingen to Kassel is 28 miles with 13 miles in tunnels.
 
The section Kassel to Fulda is 56 miles long with 29.7 miles in tunnels, and about 33 miles on viaducts.
 
The remaining Fulda to Wuezburg is 59 miles long, 35.4 miles in tunnels, 5.6 miles on viaducts
 
Wuerzburg to Nuremberg is upgraded track as is Hamburg to Hannover.
 
The high-speed line Nuremberg to Munich is partly hilly from Nuremberg to Ingolstadt and constantly climbing to Munich.
 
Nuremberg - Ingolstadt:  77,4 km long, 27 km in tunnels, 43 km curves with a minimum of 4085 m, 2% grades, profile 330m - 450m - 375 m - 500 m - 370m
 
Ingolstadt -  Munich: 80,7 km long, profile 370 m - 520 m
 
I hope this helps a bit to understand the topography of the Hamburg to Munich together with the following link:
http://www.georelief.de/isotope/i/id-4280000002020_big.jpg
 
Most German high-speed rail lines are designed for mixed traffic. The line Stuttgart to Ulm (in design phase) with grades up to 3.1% will only be used by light freight trains equipped with disk brakes.
 
All this doesn't come cheap. On hilly lines 1 minute less journey time cost up to $100 million depending on alignment design elements here in Germany.
Regards, Volker

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy