Posted by schlimm on Tuesday, February 16, 2010 10:11 AM

oltmannd
The only thing wrong with Doraville as a stop is the nothern part of I-285 and the junction of I-285 and I-85 are some of the most congested areas in Atlanta. If you are coming from Gwinnett or north Fulton and you get that far, it's not a big deal to go all the way to mid-town where the existing station is.

 

I assume Cobb County continues to not participate in MARTA?  Are they thinking of heavy rail commuter service?  And what about service from Atlanta north to Chattanooga and/or beyond?

C&NW, CA&E, MILW, CGW and IC fan

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Tuesday, February 16, 2010 7:51 AM
schlimm

Sam1

Why is this proper, but it is not proper to present the economics (cost) of passenger rail or any other mode of transport?  The passenger per mile subsidy for rail is many times greater than the corresponding subsidies for airline passenger miles and motor vehicle miles traveled.

 

One of the problems with the sort of statistics you present is that the presumption is that the number of passengers per mile is a relatively fixed value.  If that were true, then rail travel would make little sense.  But most proposals make the valid assumption (based on passengers per unit of distance on developed corridors in other countries) that the number of passengers will greatly increase if the proper route, marketing, scheduling, etc. is carried out.  Since many (though not all) of the costs are fixed, the cost per passenger mile would be accordingly reduced.  (Magnitude savings)  Predictions are always difficult, but to extrapolate from the data of a ridiculous route such as the Sunset (with one piddly cruise train, has little bearing on a potentially densely traveled route such as many discussed here.  The analogy would be if Atlanta Hartsfield had only two RT flights a day.  Can you imagine how much an airline ticket would need to cost to cover that?  Even now in Chicago, the airlines are trying to back out of paying for the final O'Hare expansion because to pay would put them out of business.  Clearly that is not going to happen, nor should it. 

 

What you say makes sense, but I have never seen any evidence that Amtrak has economies of scale when service is expanded, so I am skeptical....

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Tuesday, February 16, 2010 7:39 AM
schlimm

blue streak 1
Well we are both liking the same area Chamblee - Doraville - Duluth - Buford

 

I heard there is another mega-mall beyond Gwinnett now, even bigger?

blue streak 1
Ga. It is 159 countys statewide and trying to go to 160 (the MIlton county proposed split of Fulton Co). One fact -- Ga is the largest state in area east of the MIssissippi.  

 

And Illinois, considerably smaller in area, has 102.  Most states should reduce the number of counties by 75%.

The mega-mall is in Gwinnett near Buford..

The only thing wrong with Doraville as a stop is the nothern part of I-285 and the junction of I-285 and I-85 are some of the most congested areas in Atlanta. If you are coming from Gwinnett or north Fulton and you get that far, it's not a big deal to go all the way to mid-town where the existing station is.

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    October 2006
  • 1,123 posts
Posted by HarveyK400 on Monday, February 15, 2010 6:56 PM

Let me add my 2 cents and say that Doraville looks like a good choice with a transfer to MARTA and access to I-285.  Another stop might be at Suwanee, half way between Doraville and Gainesville.

blue streak 1

oltmannd
schlimm
I lived in Stone Mountain from 1980-87.  Even then it had grown a lot.  I understand now it extends quite far to the NW, N, NE, and E.  One would think a short-haul/suburban line to Athens would make sense.
You have no idea how much the north side has grown since then. Gwinnett county now has 660,000 people in it. I know that doesn't sound like a lot to others outside GA, but GA has tiny counties. There are over 50 in the state (a man on horseback had to be able to make a round trip to the county seat in a day).

Don you would not pass the required high school test about Ga. It is 159 countys statewide and trying to go to 160 (the MIlton county proposed split of Fulton Co). One fact -- Ga is the largest state in area east of the MIssissippi.  

North Fulton is similarly jamb-packed. An Amtrak stop in Duluth or Buford (or even Doraville or Norcross) would make HUGE sense. It would be within 10 miles of at least a million people.

Well we are both liking the same area Chamblee - Doraville - Duluth - Buford

 
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, February 15, 2010 6:30 PM

Phoebe Vet

I just reread your post, a little more carefully this time, and it sounds like the proposed SEHSR service.

Yes but I was thinking more to start the service as a conventional train once equipment was available. Then once the Petersburg - Raleigh route is opened then it could be HSR and will be 2 HRS faster than the Cresent not counting any upgrades Raleigh - CLT. That does not take in account any upgrades WAS - Petersburg and CLT - ATL.

  • Member since
    September 2007
  • From: Charlotte, NC
  • 6,099 posts
Posted by Phoebe Vet on Monday, February 15, 2010 4:36 PM

I just reread your post, a little more carefully this time, and it sounds like the proposed SEHSR service.

Dave

Lackawanna Route of the Phoebe Snow

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, February 15, 2010 4:28 PM

Phoebe Vet

You can't give the Crescent the Piedmont's time slot.  That would leave Kannapolis, Burlington, Durham, Cary, and Raleigh without service in those two time slots and Raleigh to Charlotte is a large part of the Piedmont mission.

NO NO I was speaking of another train service. New train NYP - RIC - Raleigh - CLT - ATL 

  • Member since
    September 2007
  • From: Charlotte, NC
  • 6,099 posts
Posted by Phoebe Vet on Monday, February 15, 2010 4:21 PM

You can't give the Crescent the Piedmont's time slot.  That would leave Kannapolis, Burlington, Durham, Cary, and Raleigh without service in those two time slots and Raleigh to Charlotte is a large part of the Piedmont mission.

Dave

Lackawanna Route of the Phoebe Snow

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, February 15, 2010 4:20 PM

schlimm

The analogy would be if Atlanta Hartsfield had only two RT flights a day.  Can you imagine how much an airline ticket would need to cost to cover that?  Even now in Chicago, the airlines are trying to back out of paying for the final O'Hare expansion because to pay would put them out of business.  Clearly that is not going to happen, nor should it. 

 

YYes and the O'Hare people better be careful. All it takes is for any airline to do a quick bankruptcy and then dump all the contracts they want.

  • Member since
    July 2006
  • 9,610 posts
Posted by schlimm on Monday, February 15, 2010 4:20 PM

blue streak 1
Well we are both liking the same area Chamblee - Doraville - Duluth - Buford

 

I heard there is another mega-mall beyond Gwinnett now, even bigger?

blue streak 1
Ga. It is 159 countys statewide and trying to go to 160 (the MIlton county proposed split of Fulton Co). One fact -- Ga is the largest state in area east of the MIssissippi.  

 

And Illinois, considerably smaller in area, has 102.  Most states should reduce the number of counties by 75%.

C&NW, CA&E, MILW, CGW and IC fan

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, February 15, 2010 4:11 PM

oltmannd
schlimm
I lived in Stone Mountain from 1980-87.  Even then it had grown a lot.  I understand now it extends quite far to the NW, N, NE, and E.  One would think a short-haul/suburban line to Athens would make sense.
You have no idea how much the north side has grown since then. Gwinnett county now has 660,000 people in it. I know that doesn't sound like a lot to others outside GA, but GA has tiny counties. There are over 50 in the state (a man on horseback had to be able to make a round trip to the county seat in a day).

Don you would not pass the required high school test about Ga. It is 159 countys statewide and trying to go to 160 (the MIlton county proposed split of Fulton Co). One fact -- Ga is the largest state in area east of the MIssissippi.  

North Fulton is similarly jamb-packed. An Amtrak stop in Duluth or Buford (or even Doraville or Norcross) would make HUGE sense. It would be within 10 miles of at least a million people.

Well we are both liking the same area Chamblee - Doraville - Duluth - Buford

  • Member since
    July 2006
  • 9,610 posts
Posted by schlimm on Monday, February 15, 2010 4:05 PM

Sam1

Why is this proper, but it is not proper to present the economics (cost) of passenger rail or any other mode of transport?  The passenger per mile subsidy for rail is many times greater than the corresponding subsidies for airline passenger miles and motor vehicle miles traveled.

 

One of the problems with the sort of statistics you present is that the presumption is that the number of passengers per mile is a relatively fixed value.  If that were true, then rail travel would make little sense.  But most proposals make the valid assumption (based on passengers per unit of distance on developed corridors in other countries) that the number of passengers will greatly increase if the proper route, marketing, scheduling, etc. is carried out.  Since many (though not all) of the costs are fixed, the cost per passenger mile would be accordingly reduced.  (Magnitude savings)  Predictions are always difficult, but to extrapolate from the data of a ridiculous route such as the Sunset (with one piddly cruise train, has little bearing on a potentially densely traveled route such as many discussed here.  The analogy would be if Atlanta Hartsfield had only two RT flights a day.  Can you imagine how much an airline ticket would need to cost to cover that?  Even now in Chicago, the airlines are trying to back out of paying for the final O'Hare expansion because to pay would put them out of business.  Clearly that is not going to happen, nor should it. 

 

C&NW, CA&E, MILW, CGW and IC fan

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, February 15, 2010 3:58 PM

oltmannd

As for why Amtrak doesn't extend from Charlotte to Atlanta...they can't even figure out they need a suburban stop on both sides of Atlanta.

Yes how true. The Cresent  makes suburban stops at Newark, Trenton, Wilmington, Baltimore, and Alexandria especially but does not make a stop at either Chamblee or Doraville on the NE or Austell on the west. With the upgrades NS is making on the route from Atlanta - Meridian the time saved would enable no increase in total travel times for the Cresent. 

The Crescent is making the same station stops it did in 1956 - I looked it up yesterday. Atlanta has grown from less than 500,000 to over 4M in the meantime, most of it suburban on the north side much of it along the SOU main. If it hasn't occurred to them to add a stop to the existing route where the people live, it'll never occur to them to change or add service...

Added service could be instituted by taking the Piedmont's time slot or another of the planned additional services and having a 7 PM departure from NYP to Richmond - Raleigh - CLT - ATL and arrive ATL about midnight. Leave ATL 11:00 AM take new trip's slot schedule to Raleigh and arrive NYP about 6:00 AM. Will it happen anytime soon not likely---equipment, operating money, lack of will in staqte of Ga DOT, etc.

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Monday, February 15, 2010 3:36 PM

Phoebe Vet

Gosh what a surprise, Sam doesn't like NC train plans.

The reason the Feds are participating in the upgrade is because it is part of the route for the planned Southeast High Speed Rail project from DC to Charlotte and eventually to Atlanta and Macon.

Sam does not have a view on NC train plans.  I have not ridden them.  I said that passenger rail is a desirable transport solution in relatively short high density corridors, but reporters and advocates should present the whole story, not just the upside aspects of it.  This includes comparative costs.  

When our engineering friends talk about rail technologies, they tend to present all relevant sides of the story.  Why is this proper, but it is not proper to present the economics (cost) of passenger rail or any other mode of transport?

The passenger per mile subsidy for rail is many times greater than the corresponding subsidies for airline passenger miles and motor vehicle miles traveled.  That said, if the good citizens of North Carolina and Virginia, as well as California, want to build a high speed or moderate speed passenger rail system to connect their cities, they should pay for it.  The same is true for Texans. 

Ideally, if transport in the U.S., as well as most other countries, was not the political football that it is, no form of transport would be subsidized, with the possible exception of the start-up infrastructure.  Each mode would wear its true costs, which would be paid for in ticket prices or at the pump, and be required to stand on its own.  Or fall over!  If this came about, airline passengers, motorists, etc., would know the true cost of their chosen mode of transport, and once they picked themselves up off the floor, many of them would find that passenger rail is a viable option.  Unfortunately, this is unlikely to happen.    

Two weeks ago I took the Texas Eagle from Austin to San Diego and back.  Had a great trip!  What was the purpose?  Take a train ride!  I am retired with more than a few dollars in my jeans, no spouse or kids, and so I can afford it.  I love traveling by train.  But I am not overlooking the fact that I got a $1,499.96 subsidy for my trip.  And that is before interest and depreciation.  My trip cost Amtrak $2,187.96 before interest and depreciation.  Thus, I paid 31.4 per cent of the tab before interest and depreciation and taxpayers wore the bulk of it.  The justification for this subsidy is difficult for me to fathom.

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Monday, February 15, 2010 3:33 PM
blue streak 1

Phoebe Vet

You may have misunderstood the cities.  The Piedmont and the Carolinian Go from CHARLOTTE to Raleigh, with the Carolinian continuing on through Richmond to NYC.  Neither one goes to CHARLOTTESVILLE.

The Crescent goes through CHARLOTTE and CHARLOTTESVILLE en route between NYC and New Orleans.  It does not go to Raleigh.

The SEHSR corridor will go from DC to Charlotte through Richmond and Raleigh.  It will not go through Charlottesville.  In the future it is planned to be extended to Atlanta and Macon.

Since the early '90s NC has been upgrading the ROW between Charlotte and Raleigh.  They have been removing or upgrading grade level crossings, replacing switches, minimizing curves and installing double track.  There is still a bunch of single track and areas with low speed limits that they are trying to eliminate.  The plan is to make the entire route 90 MPH track.  From Raleigh to DC is going to be 110 MPH track.

Harvey: These figures of Phoebe are correct. To give a further idea the Cresent now takes about 7:50 Wash - CLT, The Carolinian takes 9:20. This is mainly because it is 103 miles further by way of Raleigh - 479 vs 376. This averages speeds to 48 MPH by way of Charlottesville and 51 MPH by way of Raleigh and Selma. This is mainly due to several slow restriction on the SOU route of 30 MPH that will be very costly to eliminate. If the SEHSR is finished it will be about 6:30 by way of Richmond, petersburg, Raleigh , Greensborough, NC. This route will be thru a much more populated area than Charlottesville even though it is not as much % difference as it once was.

The speed increases are documented in NC's proposal mile by mile and project by project. The proposal was originally set for 79MPH but when proposals were solicited NC quickly was able to show all locations easily upgradeable to 90 MPH and I suspect some engineering is already going on to locate those places where it can become 110 MPH.

Granted NCDOT has a leg up because it owns the ROW. 

Any route that would by-pass Raleigh/Durham/Cary would be a disaster. And, isn't Norlina to Petersburg nearly arrow straight?

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Monday, February 15, 2010 3:30 PM
schlimm
I lived in Stone Mountain from 1980-87.  Even then it had grown a lot.  I understand now it extends quite far to the NW, N, NE, and E.  One would think a short-haul/suburban line to Athens would make sense.
You have no idea how much the north side has grown since then. Gwinnett county now has 660,000 people in it. I know that doesn't sound like a lot to others outside GA, but GA has tiny counties. There are over 50 in the state (a man on horseback had to be able to make a round trip to the county seat in a day). North Fulton is similarly jamb-packed. An Amtrak stop in Duluth or Buford (or even Doraville or Norcross) would make HUGE sense. It would be within 10 miles of at least a million people.

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, February 15, 2010 3:28 PM

Phoebe Vet

You may have misunderstood the cities.  The Piedmont and the Carolinian Go from CHARLOTTE to Raleigh, with the Carolinian continuing on through Richmond to NYC.  Neither one goes to CHARLOTTESVILLE.

The Crescent goes through CHARLOTTE and CHARLOTTESVILLE en route between NYC and New Orleans.  It does not go to Raleigh.

The SEHSR corridor will go from DC to Charlotte through Richmond and Raleigh.  It will not go through Charlottesville.  In the future it is planned to be extended to Atlanta and Macon.

Since the early '90s NC has been upgrading the ROW between Charlotte and Raleigh.  They have been removing or upgrading grade level crossings, replacing switches, minimizing curves and installing double track.  There is still a bunch of single track and areas with low speed limits that they are trying to eliminate.  The plan is to make the entire route 90 MPH track.  From Raleigh to DC is going to be 110 MPH track.

Harvey: These figures of Phoebe are correct. To give a further idea the Cresent now takes about 7:50 Wash - CLT, The Carolinian takes 9:20. This is mainly because it is 103 miles further by way of Raleigh - 479 vs 376. This averages speeds to 48 MPH by way of Charlottesville and 51 MPH by way of Raleigh and Selma. This is mainly due to several slow restriction on the SOU route of 30 MPH that will be very costly to eliminate. If the SEHSR is finished it will be about 6:30 by way of Richmond, petersburg, Raleigh , Greensborough, NC. This route will be thru a much more populated area than Charlottesville even though it is not as much % difference as it once was.

The speed increases are documented in NC's proposal mile by mile and project by project. The proposal was originally set for 79MPH but when proposals were solicited NC quickly was able to show all locations easily upgradeable to 90 MPH and I suspect some engineering is already going on to locate those places where it can become 110 MPH.

Granted NCDOT has a leg up because it owns the ROW. 

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, February 15, 2010 3:00 PM

henry6

The other part of that is how much would it cost to build a road and subisidize a bus or private car for the same trip per person?  Or for a short hop helicopter or private plane?  Lets put all means of transportation on the spend/cost/return balance sheets instead of throwing spears at one!

Good point and I would put all transportation funding into one pot to be distributed as best fits each area's needs.

  • Member since
    October 2006
  • 1,123 posts
Posted by HarveyK400 on Monday, February 15, 2010 1:19 PM

My impression was we are asking for strategic suburban stops in addition to a city center station.  This works well for the Chicago area at Glenview, Naperville, Joliet, and Homewood.  New York, another example, has Newark and Metro Park among others; but I'm also familiar with the Richmond Staples Road station and can appreciate the decision.   

Hammond (IN) was the location urged by a Whiting railfan despite my efforts to encourage a stop farther east, particularly at Buffington and Gary which were more central and accessible to the northwest Indiana population.  Buffington (Gary, IN) would have been just off the Cline Ave Expressway (SR-912) and convenient to I-80, near Gary Airport, and now would be adjacent to the casino.  Gary, at a restored Union Station on Broadway, could have been connected to the Cong Adam Benjamin TC and South Shore station across the Toll Road and the [Gary] Civic Center; and would have been convenient to I-65 and I-80 to the west.

BNSFwatcher

Jacksonville, FL has had 'Clifford Lane Station' for years and years, with no downtown station.  It is a "suburban station".  Only problem is, no one lives in those "suburbs"!  I heard that it recently got metro JTA bus service, after ages of $20+ taxi rides.  Be careful what you ask for!

Hays

 
  • Member since
    July 2006
  • 9,610 posts
Posted by schlimm on Monday, February 15, 2010 12:48 PM

oltmannd
As for why Amtrak doesn't extend from Charlotte to Atlanta...they can't even figure out they need a suburban stop on both sides of Atlanta. The Crescent is making the same station stops it did in 1956 - I looked it up yesterday.

 

I lived in Stone Mountain from 1980-87.  Even then it had grown a lot.  I understand now it extends quite far to the NW, N, NE, and E.  One would think a short-haul/suburban line to Athens would make sense.

C&NW, CA&E, MILW, CGW and IC fan

  • Member since
    May 2009
  • 798 posts
Posted by BNSFwatcher on Monday, February 15, 2010 10:46 AM

Jacksonville, FL has had 'Clifford Lane Station' for years and years, with no downtown station.  It is a "suburban station".  Only problem is, no one lives in those "suburbs"!  I heard that it recently got metro JTA bus service, after ages of $20+ taxi rides.  Be careful what you ask for!

Hays

  • Member since
    January 2001
  • From: Atlanta
  • 11,971 posts
Posted by oltmannd on Monday, February 15, 2010 6:41 AM
HarveyK400
It's interesting that North Carolina is focusing on Asheville and Wilmington for expansion, something within their control.  I think it's a shame Amtrak hasn't pursued additional services between Washington, DC and Atlanta to round out services in Virginia, the Carolinas, and Georgia.  For Amtrak to extend the NEC to Richmond seems highly discriminatory while avoiding any new or expanded services in other interstate corridors.  What's depressing is the long lead time for implementation of any of this.
Improving Richmond to DC is a good idea because the route should generate the same type of ridership and fares that the rest of the NEC does. Driving in this corridor is ridiculously bad right now. Other corridors lack the integration with an existing rail network that a NEC corridor extension would have.

As for why Amtrak doesn't extend from Charlotte to Atlanta...they can't even figure out they need a suburban stop on both sides of Atlanta. The Crescent is making the same station stops it did in 1956 - I looked it up yesterday. Atlanta has grown from less than 500,000 to over 4M in the meantime, most of it suburban on the north side much of it along the SOU main. If it hasn't occurred to them to add a stop to the existing route where the people live, it'll never occur to them to change or add service...

-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/

  • Member since
    September 2007
  • From: Charlotte, NC
  • 6,099 posts
Posted by Phoebe Vet on Monday, February 15, 2010 6:06 AM

You and I are pretty much in agreement in the " I'd rather see " department, but the current plan is a significant improvement over what exists now.  NC & VA have been committed to and working on this plan for years.  They originally wanted it to be a MAGLEV route, but that plan quietly went away sometime around 2003.

Dave

Lackawanna Route of the Phoebe Snow

  • Member since
    October 2006
  • 1,123 posts
Posted by HarveyK400 on Sunday, February 14, 2010 9:57 PM

I didn't misunderstand - it was another senior moment.  I didn't realize that I wrote Charlottesville (VA) instead of Charlotte (NC).

As for Richmond-Raleigh, I might see spending the ginormous dollars to ease curves - essentially relocate and rebuild almost the entire xSBD for 185-215 mph; but certainly not for just 110 mph.  What a snake path!  For 110 mph, I'd rather see improvements - grade separation, two main tracks, and even electrification on the xACL CSX A-Line; and more 90 mph improvements on the NS between Alexandria and Greensboro.  If Richmond-Raleigh hasn't been committed to; maybe there is time to modify the application.

  • Member since
    October 2006
  • 1,123 posts
Posted by HarveyK400 on Sunday, February 14, 2010 7:16 PM

Sam1 is our reality check.  Is $25 the best price point?  What proportion of riders are discounted monthly pass or 10-ride ticket holders; and are the discounts too deep (again, the price point)?  What could be done about costs?

What's more interesting is that it's the Fed, and not Amtrak, that is taking the initiative.  Someone (Don Philips?) recently decried how Amtrak over the years has been too passive in fighting for funds to expand.  Of course there are a lot of nobodies out here speaking to deaf ears for a long time.

Phoebe Vet

Gosh what a surprise, Sam doesn't like NC train plans.

The reason the Feds are participating in the upgrade is because it is part of the route for the planned Southeast High Speed Rail project from DC to Charlotte and eventually to Atlanta and Macon.

 
  • Member since
    September 2007
  • From: Charlotte, NC
  • 6,099 posts
Posted by Phoebe Vet on Sunday, February 14, 2010 7:15 PM

You may have misunderstood the cities.  The Piedmont and the Carolinian Go from CHARLOTTE to Raleigh, with the Carolinian continuing on through Richmond to NYC.  Neither one goes to CHARLOTTESVILLE.

The Crescent goes through CHARLOTTE and CHARLOTTESVILLE en route between NYC and New Orleans.  It does not go to Raleigh.

The SEHSR corridor will go from DC to Charlotte through Richmond and Raleigh.  It will not go through Charlottesville.  In the future it is planned to be extended to Atlanta and Macon.

Since the early '90s NC has been upgrading the ROW between Charlotte and Raleigh.  They have been removing or upgrading grade level crossings, replacing switches, minimizing curves and installing double track.  There is still a bunch of single track and areas with low speed limits that they are trying to eliminate.  The plan is to make the entire route 90 MPH track.  From Raleigh to DC is going to be 110 MPH track.

Dave

Lackawanna Route of the Phoebe Snow

  • Member since
    October 2006
  • 1,123 posts
Posted by HarveyK400 on Sunday, February 14, 2010 6:49 PM

Saving "almost an hour" with Raleigh-Charlottesville improvements seems overly ambitious.  A more realistic schedule may be 2:40 hrs, saving :30 min and averaging a respectable 64 mph.  Increasing speed to 90 mph saves only roughly (difference of time between 79 mph and 90 mph taken from existing schedule) :15 min; and savings for meets, a very uninformed guess from Illinois, might add up to another :15 min.  By comparison, the current Chicago-Milwaukee Hiawathas average only 56 mph during non-peak times, same as for the current Piedmont and Carolinian.

It's interesting that North Carolina is focusing on Asheville and Wilmington for expansion, something within their control.  I think it's a shame Amtrak hasn't pursued additional services between Washington, DC and Atlanta to round out services in Virginia, the Carolinas, and Georgia.  For Amtrak to extend the NEC to Richmond seems highly discriminatory while avoiding any new or expanded services in other interstate corridors.  What's depressing is the long lead time for implementation of any of this.

Phoebe Vet

 
  • Member since
    July 2004
  • 2,741 posts
Posted by Paul Milenkovic on Sunday, February 14, 2010 1:22 PM

henry6

The other part of that is how much would it cost to build a road and subisidize a bus or private car for the same trip per person?  Or for a short hop helicopter or private plane?  Lets put all means of transportation on the spend/cost/return balance sheets instead of throwing spears at one!

It is back to the standard advocacy stance on subsidies.  "Look at all of the money being wasted on highways!  It is not fair that a comparable share of money is not wasted on trains!"

My economics/engineering intuition is that subsidy of intercity bus service would be both the most cost-effective as well as the "greenest" from the standpoint of CO2 way of making common-carrier transportation more widely available in the short-range market.  Intercity bus and intercity rail have about an equal share of the European Community (EC) market, each of which is orders of magnitude more than what we do with Amtrak in the US.

The thing is that we do indeed apply spend/cost/return balance sheets to all modes of transportation.  All modes get some form of subsidy or support for the road/tracks/airports/airways.  What is unique about trains is that they commonly require high levels of subsidy for the moving part -- the train.

Actually, the NEC turns in a slim operating profit (Sam1 tells us) before their capital charges, which they accomplish by charging high fares.  The Midwest Regional Rail Initiative was at one time supposed to cost about 5 billion dollars, mainly in track improvements, a small portion of that in trainsets.  For that capital outlay, it was supposed to break even on operating costs charging more modest fares, and it was supposed to carry enough passenger miles to amount to half an Amtrak.  Imagine if the 35 billion in subsidy over the years of Amtrak were to have been spent on 7 regional rail systems on the scale of the MWRRI, and if that network were carrying 3 1/2 times Amtrak's current passenger-mile volume, and if there were no yearly charges for ongoing operating subsidies?

When you think of the missed opportunity, I think that Sam1 should keep on pitching spears -- at the advocacy community.

If GM "killed the electric car", what am I doing standing next to an EV-1, a half a block from the WSOR tracks?

  • Member since
    September 2007
  • From: Charlotte, NC
  • 6,099 posts
Posted by Phoebe Vet on Sunday, February 14, 2010 10:49 AM

Gosh what a surprise, Sam doesn't like NC train plans.

The reason the Feds are participating in the upgrade is because it is part of the route for the planned Southeast High Speed Rail project from DC to Charlotte and eventually to Atlanta and Macon.

Dave

Lackawanna Route of the Phoebe Snow

  • Member since
    December 2001
  • 8,156 posts
Posted by henry6 on Sunday, February 14, 2010 10:29 AM

The other part of that is how much would it cost to build a road and subisidize a bus or private car for the same trip per person?  Or for a short hop helicopter or private plane?  Lets put all means of transportation on the spend/cost/return balance sheets instead of throwing spears at one!

RIDEWITHMEHENRY is the name for our almost monthly day of riding trains and transit in either the NYCity or Philadelphia areas including all commuter lines, Amtrak, subways, light rail and trolleys, bus and ferries when warranted. No fees, just let us know you want to join the ride and pay your fares. Ask to be on our email list or find us on FB as RIDEWITHMEHENRY (all caps) to get descriptions of each outing.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy