How does a rail crew insert drainage culverts under a busy mainline?
Posted by Andrew Falconer on Monday, September 4, 2006 11:32 PM

How does a track maintenance crew insert a drainage culvert under a busy mainline?

There are several places on the CN line in the Southbend subdivision where the ballast keeps settling due to poor drainage. The cars severely bounce on the loose ballast section. This leads to track fractures. This problem has existed for over a decade in multiple locations. When a auto carrier unit train rolls over these settled ballast points, piercing metallic shreeks and bangs from the bouncing cars can be heard for a mile.

If they have not fixed the problems in over a decade, is it because it takes too much time and effort for the installation of  proper drainage through culverts or other means?

Are all railroads like this or is it just CN?

Andrew

Andrew

Watch my videos on-line at https://www.youtube.com/user/AndrewNeilFalconer

  • Member since
    December 2001
  • From: Burlington, WI
  • 1,418 posts
Posted by rvos1979 on Tuesday, September 5, 2006 12:06 AM
When they added the passing siding at Nestle (actually just south of Burlington, the site is near a Nestle chocolate plant), they used a big drill to drill under the roadbed and insert steel culvert pipe(s).  Was interesting to watch.

Randy Vos

"Ever have one of those days where you couldn't hit the ground with your hat??" - Waylon Jennings

"May the Lord take a liking to you and blow you up, real good" - SCTV

  • Member since
    September 2003
  • From: California - moved to North Carolina 2018
  • 4,422 posts
Posted by DSchmitt on Tuesday, September 5, 2006 12:56 AM

 rvos1979 wrote:
When they added the passing siding at Nestle (actually just south of Burlington, the site is near a Nestle chocolate plant), they used a big drill to drill under the roadbed and insert steel culvert pipe(s).  Was interesting to watch.

 

BoringWink [;)]Clown [:o)]

I tried to sell my two cents worth, but no one would give me a plug nickel for it.

I don't have a leg to stand on.

  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Tuesday, September 5, 2006 8:04 AM

I remember a case in which a jet pump (using a forced stream of water) was used to install a sewer line under a four-lane divided highway without interfering with the traffic.  A double-track railroad and a culvert shouldn't be too much different.

Not sure a culvert is the answer to settling roadbed, though.  I'd like to see what our resident Mudchicken says about this.  (Sounds to me like they need some serious surfacing, though!)

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    June 2005
  • From: Phoenixville, PA
  • 3,495 posts
Posted by nbrodar on Tuesday, September 5, 2006 9:26 AM

If it's a large culvert, the railroad may suspend operation for 6, 12, or 24 hours, to do the work.    Belive it or not, it's often faster (and operationally less intrusive) to just shut the line down for 12 hours, then to spend 48 hours, trying to work between trains.

Nick

Take a Ride on the Reading with the: Reading Company Technical & Historical Society http://www.readingrailroad.org/

  • Member since
    July 2006
  • From: Vicksburg, Michigan
  • 2,303 posts
Posted by Andrew Falconer on Tuesday, September 5, 2006 10:10 AM

One thought is to just go ahead and build a bridge over the stretches of land where the rocks and track keep sinking. They keep maintaining the line, but the sinking spots still remain.

Andrew

Andrew

Watch my videos on-line at https://www.youtube.com/user/AndrewNeilFalconer

  • Member since
    January 2001
  • From: US
  • 1,537 posts
Posted by jchnhtfd on Tuesday, September 5, 2006 10:16 AM

Without looking at the site, this sounds much more like a subgrade materials problem than a drainage problem, strictly speaking.  The only reasonably permanent solution is to provide drainage -- yes, probably a culvert -- but also to remove the unstable material far enough down (and without looking at it, I'm not going to say how far that is) so that the load is distributed adequately.  The problem is much worse crossing such goop as muskeg, which happens in parts of Canada -- there you may have to go several tens of feet with good material to get adequate bearing strength.

As to how to put a culvert under the line?  There are a bunch of different ways to do it.  Depends on the material, size of culvert, distance to be crossed, access on or outside the right of way, etc.  Jacking is one way; boring and slipping a pipe through is another.  Sometimes as noted the simplest and quickest thing to do is take the line out of service and go in from the top -- but I would think that would be rare these days.

MC?

Jamie
  • Member since
    June 2004
  • From: roundhouse
  • 2,747 posts
Posted by Randy Stahl on Tuesday, September 5, 2006 12:16 PM

Drainage drainage, and drainage !!

We usually change culferts by taking out 3-4 ties and digging . takes about 6 hours depending on the depth of the culvert .

Randy

  • Member since
    October 2004
  • 3,190 posts
Posted by MichaelSol on Tuesday, September 5, 2006 12:53 PM
 jchnhtfd wrote:

As to how to put a culvert under the line?  There are a bunch of different ways to do it.  Depends on the material, size of culvert, distance to be crossed, access on or outside the right of way, etc.  Jacking is one way; boring and slipping a pipe through is another.  Sometimes as noted the simplest and quickest thing to do is take the line out of service and go in from the top -- but I would think that would be rare these days.


In 1981, we had to install a culvert under a substantial fill on the BN mainline, to carry a pipe across the right-of-way. The fill at that point was about 20-25 feet above the point where we had to install the culvert. The BN Engineering Dept said "no problem" that there were private contractors with equipment similar to well drilling equipment, it just went in sideways and slipped the "casing" in sideways, just as a well driller would do. That's how we did it. BN approved the plans, provided an on-site engineer while it was being done, the driller had to stop while trains were passing, and a slow order was put on, but otherwise, there was no interruption in service. It was pretty slick.

The contractor, who did quite a bit of the work apparently (he and the BN engineer obviously knew each other) had a million dollar bond posted.
  • Member since
    July 2006
  • From: Vicksburg, Michigan
  • 2,303 posts
Posted by Andrew Falconer on Tuesday, September 5, 2006 5:21 PM

One of the sinking locations was at Ullery Drive by Indian Lake. A week ago there was much mud oozing up between the rocks that made up the roadbed. More rocks might not do a thing, unless they added asphalt or something built out of concrete that is a combination short bridge and culvert. These spots are bad. I wonder if the CN managers will devise a way fix these sinking roadbeds before there is another derailment.

Andrew

Andrew

Watch my videos on-line at https://www.youtube.com/user/AndrewNeilFalconer

  • Member since
    July 2006
  • From: NW Milwaukee
  • 107 posts
Posted by da Milwaukee beerNut on Tuesday, September 5, 2006 6:05 PM
 rvos1979 wrote:
When they added the passing siding at Nestle (actually just south of Burlington, the site is near a Nestle chocolate plant), they used a big drill to drill under the roadbed and insert steel culvert pipe(s).  Was interesting to watch.

Similar drilling operation was used by a crew earlier this summer at Dupy. CP crew trucks were around the site - but I believe a contractor brought in the drill. The new installation was bored north of the diamond beneath the CN/WC main. Apparently CP has responsibility for the drainage of the diamond and interchange tracks.
  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Tuesday, September 5, 2006 6:46 PM

That sinking and oozing, as well as the settling, may not signal the need for a culvert.  The ballast isn't doing its job of draining when it's fouled by mud, as this place obviously is.  The mud came from somewhere--probably from below the ballast, which has caused the settling. 

There was (maybe still is) a craze for separating the ballast from the sub-ballast with a layer of geotextiles, something permeable to allow water to pass through but not granular things such as soil.  If those are still in vogue, that might be all that's necessary.  As someone else said, drainage is paramount--good ditches alongside the track(s) would probably help in this case--and, yes, culverts if necessary to keep the ditches drained.  It would all depend on the lay of the surrounding land.

MC, where are you?

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Sunday, September 10, 2006 10:22 PM
 CShaveRR wrote:

That sinking and oozing, as well as the settling, may not signal the need for a culvert.  The ballast isn't doing its job of draining when it's fouled by mud, as this place obviously is.  The mud came from somewhere--probably from below the ballast, which has caused the settling. 

There was (maybe still is) a craze for separating the ballast from the sub-ballast with a layer of geotextiles, something permeable to allow water to pass through but not granular things such as soil.  If those are still in vogue, that might be all that's necessary.  As someone else said, drainage is paramount--good ditches alongside the track(s) would probably help in this case--and, yes, culverts if necessary to keep the ditches drained.  It would all depend on the lay of the surrounding land.

MC, where are you?

MC was working far from home, Carl...thanx for pointing out the probable culprit. Beyond fouled ballast, there could be subgrade failure or a problem with ballast pockets.

A good undercutting program followed by shoulder cutting would be a good first step, followed by lime injection or asphalt underlayment in the bad spots. French drains (not culverts) comes next  Throwing ballast and surfacing money at a repeat problem is an admission you don't have adequate maintenance budget (wasting $$$ on shiny new engines and appeasing Wall Street again?) It is a sugar-coating and does not fix the problem.

Subgrade problems , especially persistant ones, require a good geotechnical engineer  to help with the solution and coming up with a program to manage and , if possible, eliminate the problem. Increased tonnage tends to speed-up subgrade problems as does concrete ties.

Subgrade problems have been around since day-1, the difference now is there is considerably better technology and understanding of how to deal with wildly different soil types.

Getting water away from track subgrades involves a lot more than throwing pipe under the track.  If you are placing a pipe or box culvert the choices are:

-Open cut

-Jacking

-Boring

-pipe ramming

-HDD (Horizontal Directional Drilling)...follow that steerable cutting head/mole!

-Microtunneling

-augering

(the problems the railroads are seeing, with frightening regularity, is the improper use of any of these methods...UP is suing two separate entities in Iowa where drilling and jacking outfits have derailed two trains and don't be surprised if they sue the state [Iowa] over some related irresponsible legislation allowing pipeline and utility companies to pull some other dumb stunts under railroads without the knowledge or permission of the railroad.) 

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    January 2003
  • From: Kenosha, WI
  • 6,567 posts
Posted by zardoz on Monday, September 11, 2006 6:46 AM
 CShaveRR wrote:

That sinking and oozing, as well as the settling, may not signal the need for a culvert.  The ballast isn't doing its job of draining when it's fouled by mud, as this place obviously is.  The mud came from somewhere--probably from below the ballast, which has caused the settling. 

There was (maybe still is) a craze for separating the ballast from the sub-ballast with a layer of geotextiles, something permeable to allow water to pass through but not granular things such as soil.  If those are still in vogue, that might be all that's necessary.  As someone else said, drainage is paramount--good ditches alongside the track(s) would probably help in this case--and, yes, culverts if necessary to keep the ditches drained.  It would all depend on the lay of the surrounding land.

MC, where are you?

I wonder what MC would think of the ongoing problems at Deval?

  • Member since
    April 2002
  • From: Northern Florida
  • 1,429 posts
Posted by SALfan on Monday, September 11, 2006 10:35 AM
The problem could be a natural spring (or springs) which keeps the subgrade wet.  I've run into that problem on road construction projects.  The solution I've seen used is one of those proposed by Mudchicken, french drains.
  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Monday, September 11, 2006 10:52 AM
What's a French drain?

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Monday, September 11, 2006 12:33 PM

 CShaveRR wrote:
What's a French drain?

Old technology concept: Napoleon's boys stole it from the Romans, been around for years. aka-a trench drain....

A basic french drain is a slit trench filled to the top with gravel and small stones. The voids in the rocks carry the water off somewhere with a lower elevation.

Modernized, we use the same trench, line the walls and floor of the trench with filter fabric (to keep dirt fines from plugging up the voids), lay perforated ADS pipe at the bottom of the hole to carry off water faster, backfill with gravel, ballast or some gap-graded material and lay filter fabric with a light covering of dirt on top. (a gravel burrito with a straw on the bottom if you will Chef [C=:-)])

http://www.ads-pipe.com/en/documentlisting.asp?documenttypeID=5

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Monday, September 11, 2006 12:37 PM

Thanks, MC!

(Hope you and BH can make it to the Lincoln Summit in October--I promise I won't order a burrito!)

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    March 2002
  • 9,265 posts
Posted by edblysard on Monday, September 11, 2006 2:06 PM

Whats wrong with burritos...might even bring some tamales along too...

Besides, you can always blame it on the dog...

23 17 46 11

  • Member since
    September 2002
  • From: West end of Chicago's Famous Racetrack
  • 2,239 posts
Posted by Poppa_Zit on Monday, September 11, 2006 3:00 PM
 zardoz wrote:

I wonder what MC would think of the ongoing problems at Deval?

Please elaborate.

"Everyone is entitled to their own opinion. They are not entitled, however, to their own facts." No we can't. Charter Member J-CASS (Jaded Cynical Ascerbic Sarcastic Skeptics) Notary Sojac & Retired Foo Fighter "Where there's foo, there's fire."
  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Monday, September 11, 2006 5:12 PM

I can't say what Jim has in mind, but I think the biggest headache right at Deval is the diamond-on-a-bridge over U.S. 14.  Something's being done about it, supposedly. 

They need a flyover there, with two growing commuter lines.

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    July 2006
  • From: Vicksburg, Michigan
  • 2,303 posts
Posted by Andrew Falconer on Monday, September 11, 2006 11:13 PM

Mudchicken,

There has to be a way to get the message about proper roadbed construction in every inbox of every CN employee. Some of the derailments over the past two years in the South Bend Subdivision were probably made even worse by the lousy roadbed.

Andrew

Andrew

Watch my videos on-line at https://www.youtube.com/user/AndrewNeilFalconer

  • Member since
    January 2003
  • From: Kenosha, WI
  • 6,567 posts
Posted by zardoz on Tuesday, September 12, 2006 8:17 AM
 Poppa_Zit wrote:
 zardoz wrote:

I wonder what MC would think of the ongoing problems at Deval?

Please elaborate.

At Deval the tracks continually sink into the ground.  The CNW used to do track work at the interlocking every year. One year I dumped 14 ballast cars right at the interlocking; within two years it had all sunk into the ground. 

From what I understand, the interlocking was built in a marsh.  The thinking at the time was that if enough rock was dumped, eventually the ground would be solid underneath.  While that MAY be true someday, that day has yet to arrive.  I can only imagine how much rock has sunk beneath the railbed over the years.

Each day the suburban trains of the Metra Northwest and North Central lines cross the diamonds, as well as every CP and UP train heading from Chicago to the Twin Cities...a very busy place indeed!

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy