Cost of upgrading Rail
Posted by CaptainChuck on Friday, February 17, 2006 9:12 PM
Whats the approx. cost to upgrade a Rail line to 115lb CWR? Like for lets say, 10 miles?
  • Member since
    March 2005
  • From: Brewster, NY
  • 648 posts
Posted by Dutchrailnut on Friday, February 17, 2006 9:30 PM
From what ?? and todays new rail is around 130 Lb/yd
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Friday, February 17, 2006 9:46 PM
QUOTE: Originally posted by Dutchrailnut

and todays new rail is around 130 Lb/yd



Dutchrailnut: And what planet are you living on?

Capt.Chuck:
(1) 115# new is almost all captive to the transit industry and the rail mills in North America (2 US, 1 Canada) are kicking out the stuff in 78 foot blanks as fast as they can.....136, 141 AREMA sections are easier to get new (or consider European, Russian 132 & 136 or Japanese sections if you can wait)

(2) Any turnouts in those 10 miles? at-grade crossings? open deck bridges?

(3) Existing rail size? if the rail base dimension changes to meet the 5 1/2 inch base of 115# rail, you just bought all new tie plates and fastenings (and anchors if not renewing with D-E or Pandrol clips)...you may have to adze/dap the ties to accomodate the new plates and some ties will not survive the modifications...

(4) CWR or jointed? Assuming the old rail was jointed, you are surfacing too. (getting rid of low spots from bad joint memory, properly suporting the new rail.) Step joints?

Hinting at associated costs that may figure into any shotgun calculation and skew the numbers....as in it isn't just the new rail you're buying plus the related extra gang labor & equipment costs.
Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, February 17, 2006 11:06 PM
Lets also not forget:

(With deference to MC, of course)

1. Cost of taking up existing rail and ties

2. Replacement of all ties or all unsalvagable ties

3. Cost of plugging salvagable ties (if reqd)

4. Costs of repacing OTM (even assuming CWR, those fastening systems aren't cheap)

Just a few thoughts...I'm sure there's more...

LC
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, February 18, 2006 1:41 PM
As we discussed in the HAL vs Shortlines thread, the rail industry as a whole would have been better off with LAL's and 6 axle railcars to achieve increased load factor without sacrificing current shortline/branchline infrastructure. Not to mention that it'd be a lot cheaper to focus on structure upgrade and then weld together the 115# existing rail over new ballast. You might have been able to use some of the existing ties and accessories that would otherwise have to be replaced for heavier rail.

It would have taken a lot less steel (e.g. less industry $$) to add third axles to rail trucks for the entire railcar fleet than it is to upgrade to heavier rails across the entire nationwide rail network.
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Saturday, February 18, 2006 1:50 PM
FM and dutchrailnut must be living on the same foreign planet. (as in Leno's "Goofy" out there beyond Pluto)
Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, February 18, 2006 2:00 PM
'cuse me. Guess I should have said 87# rail?

Here's a suggestion: Follow the idea trail, and if the details need clarification, do so. A hole in the ballast is worth.........less.
  • Member since
    June 2003
  • From: South Central,Ks
  • 7,170 posts
Posted by samfp1943 on Saturday, February 18, 2006 4:51 PM
QUOTE: Originally posted by futuremodal

As we discussed in the HAL vs Shortlines thread, the rail industry as a whole would have been better off with LAL's and 6 axle railcars to achieve increased load factor without sacrificing current shortline/branchline infrastructure. Not to mention that it'd be a lot cheaper to focus on structure upgrade and then weld together the 115# existing rail over new ballast. You might have been able to use some of the existing ties and accessories that would otherwise have to be replaced for heavier rail.

It would have taken a lot less steel (e.g. less industry $$) to add third axles to rail trucks for the entire railcar fleet than it is to upgrade to heavier rails across the entire nationwide rail network.

Undoubtedly, FM you are correct, but to just create a six axle truck and replace them under the conventionally trucked cars, would first of all be an engineering nightmare, not to mention finding the off shore manufacturers to supply them [ since so much steel casting capacity is now off shore due to various restrictions, EPA, and other US Gov rules]
I suspect it would be blindingly expensive to retrofit all the necessary cars for just those 6axle trucks.
Sam

 

 


 

  • Member since
    September 2002
  • From: Back home on the Chi to KC racetrack
  • 2,011 posts
Posted by edbenton on Saturday, February 18, 2006 4:56 PM
Since you are looking at roughly 30 million a mile to lay all new trackager and ballast figure on roughly 6 mil a mile rough guess remember there is no need to put down new subroadbed and ballast just redoing the track figure on the rough guess of 6 mil a mile. That 30 mil a mile comes from what it is costing the BNSF to double track the transcon.
Always at war with those that think OTR trucking is EASY.
  • Member since
    March 2005
  • From: Brewster, NY
  • 648 posts
Posted by Dutchrailnut on Saturday, February 18, 2006 8:14 PM
The planet I live on even has 136 Lbs rail on Branch line.
The lightest rail other than yards is 119.
Most Mainline rail is 140 on both Concrete and wood.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, February 18, 2006 9:13 PM
QUOTE: Originally posted by samfp1943

QUOTE: Originally posted by futuremodal

As we discussed in the HAL vs Shortlines thread, the rail industry as a whole would have been better off with LAL's and 6 axle railcars to achieve increased load factor without sacrificing current shortline/branchline infrastructure. Not to mention that it'd be a lot cheaper to focus on structure upgrade and then weld together the 115# existing rail over new ballast. You might have been able to use some of the existing ties and accessories that would otherwise have to be replaced for heavier rail.

It would have taken a lot less steel (e.g. less industry $$) to add third axles to rail trucks for the entire railcar fleet than it is to upgrade to heavier rails across the entire nationwide rail network.

Undoubtedly, FM you are correct, but to just create a six axle truck and replace them under the conventionally trucked cars, would first of all be an engineering nightmare, not to mention finding the off shore manufacturers to supply them [ since so much steel casting capacity is now off shore due to various restrictions, EPA, and other US Gov rules]
I suspect it would be blindingly expensive to retrofit all the necessary cars for just those 6axle trucks.
Sam


Well, what should have happened is for all new railcars that were built for 286k loads at 35 tons per axle and 36" per wheel should have instead gone with three axle trucks with 28" wheels at 25 tons per axle for a gross load of 300k per car. Even though that too would have put pressure on shortlines and branchlines to adapt, they could have then just focused on upgrading their bridges and other weight bearing structures, and been able to stick with their lighter rail tracks.

Not only that, a three axle truck with 28" wheels would allow a lower center of gravity than the two axle truck with 36" wheels.
  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Posted by beaulieu on Sunday, February 19, 2006 10:44 AM
Remember Dave, the railroads own less than 50 percent of the railcars now. Nothing would stop an ADM, Cargill, or XCel Energy from buying a six axle railcar.
Remember though, the extra wheelsets will add rail wear which will offset some of the savings from lower axle load, and the longer wheelbase hurts too. Not to mention the higher purchase price and maintenance cost of the non-standard truck.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, February 19, 2006 12:13 PM
QUOTE: Originally posted by beaulieu

Remember Dave, the railroads own less than 50 percent of the railcars now. Nothing would stop an ADM, Cargill, or XCel Energy from buying a six axle railcar.
Remember though, the extra wheelsets will add rail wear which will offset some of the savings from lower axle load, and the longer wheelbase hurts too. Not to mention the higher purchase price and maintenance cost of the non-standard truck.


Nothing would stop them from buying 6 axle cars, but wouldn't the railroads simply refuse to run them? Isn't that what happened to the TTOX single axle cars? If the rail industry percieves a problem with an unconventional arrangement, they will refuse to run it rather than risk the unknown.

As for relative rail wear, what you are saying is that spreading the increased gross weight over more axles (LAL) will cause more rail wear than putting more weight on the same number of axles (HAL). I would think the opposite would be true, simply because the physics of such are already proven in highway use.

In other words 10,000 gross tons riding on 400 total axles (25 tons per axle with 28" wheels) should in theory cause less surface wear than 10,000 tons riding on 280 axles (35.8 tons per axle with 36" wheels). Concentrated weight on fewer axles should cause more rail wear than the extra wheel/rail interaction, otherwise why the need to upgrade to heavier rail for the 35 ton and projected 39 ton per axle standards? The extra tare of the third axle wouldn't be that much, and if I remember correctly the ABC-NACO three axle truck that came out a few years ago was not much longer than the standard three piece truck. (Unfortunately, since Meridian took over ABC-NACO's assets the spec sheets are no longer available online, so it's hard to check this statement for accuracy).
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Sunday, February 19, 2006 1:05 PM
QUOTE: Originally posted by futuremodal

QUOTE: Originally posted by beaulieu



Nothing would stop them from buying 6 axle cars, but wouldn't the railroads simply refuse to run them? Isn't that what happened to the TTOX single axle cars? If the rail industry percieves a problem with an unconventional arrangement, they will refuse to run it rather than risk the unknown.


The problem was VERY real, not "perceived". The single bogey (sp?) truck was famous for derailing under what would be normal buffing forces for other cars, the single-axle truck dampening system was its own worst enemy when empty around switches in the terminals (empty, they were menacing switch pickers; spent many a night at Hobart picking them up and repairing #8 and #10 switches), hunting was bad under heavy loads and they had serious yaw problems in crosswinds (especially needed a snubber purpose rethinking). Railroads will try anything new, howevever- when the shakedown period ends, the mechanical forces had better not be spending a disproportionate amount of time working with a single class of rollingstock. With TTOX cars, they always got considerable extra attention.


On the three axle truck biz:
DODX three axle flats still require special handling in most timetables (even though their numbers are dwindling, we see them here under Ft. Carson M-1 tanks frequently). Their frames are hinged and it was my experience in yards with plenty of #6.5, #7,#8, #9 and #10 turnouts that the middle/center axle could derail between the swichpoint and the frog. This condition always was a bear to rerail (getting the center axle back over) with a loaded car, without further damaging the turnout. If the MX/Rail Garrison project data ever comes out, you will get an eyefull of the military's frustration with the three axle truck used under their testbed "portable switch heaters".... In short, a three axle truck cannot go a lot of places that a standard truck can, especially lighter weights of rail with curvature (the rolling moment is too high to expect cut spikes on older ties to hold)
Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Posted by beaulieu on Sunday, February 19, 2006 1:12 PM
Bogie = Truck

TTOX/TTUX cars were single axle trucks
  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Posted by beaulieu on Sunday, February 19, 2006 1:19 PM
Dave, smaller wheels equal smaller contact patch and so the pressure per square inch may be closer than you think even with a lighter load. The ASF or Buckeye three axle trucks
have a longer wheelbase than any two axle truck which will increase flange wear. It also will have significantly higher inspection and maintenance costs. Private Freight Car Owners are already howling since the Railroads have gotten tough over Wild cars. More frequent truck inspection will deter any move to three axle trucks where it is possible to avoid them.
  • Member since
    May 2005
  • From: S.E. South Dakota
  • 13,569 posts
Posted by Murphy Siding on Sunday, February 19, 2006 2:59 PM
mudchicken: Why would a three axel truck under a car have more problems with derailing than the three axel truck on the locomotive pulling it?

Thanks to Chris / CopCarSS for my avatar.

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Sunday, February 19, 2006 6:03 PM
Totally different construction and weight. Derailed central axle far less common (but still happens, less likely to pop-up with a traction motor wrapped around it, locomotive truck much more free to move vertically because they cost much more)....and both leave plenty of tiny shiny flakes that evidence the wear problem with the wheels being out further from the centerpin (and not being tangent to that point in the curves like radial locomotive trucks on light curves less than six degrees)


Sooner or later Randy Stahl will comment and I would defer to him.
Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, February 19, 2006 6:22 PM
beaulieu and mudchicken,

To further Murphy's inquiry, are we comparing the same product? The ABC-NACO/Meridian three axle truck is (was?) designed with radial steering (same as what's on the SD's) so that each axle would follow the curve, so the wheelbase problem is mitigated, perhaps even to the point of being LESS wearsome to the rail than standard three piece two axle trucks. That in and of itself makes it a completely different product than the more rigid three axle trucks used on those older heavy haul flats.

I am not sure why three axle trucks would have higher inspection costs, especially if such costs are allocated to the increase in load factor per car (and the presumed decrease in track wear). Higher maintenance costs? Maybe, if such is predicated simply on the number of axles and associated components therein. But if that is the case, wouldn't the TTOX's have had lower inspection and maintenance costs?

And speaking of the TTOX's, it was my understanding that the derailing problems were no worse than those experienced by empty 89' flats or the drawbar connected 2 x 89' flats, e.g. the draft and buff derailments are common for lighter empty cars located midconsist between heavier loaded cars. Granted, the rigid wheelbase has an inherent problem not experienced by pivoting trucks. The solution of course (at least for the TTUX "Four Runner" cars) would have been to replace the single axles and drawbars at the "A" and "B" connections and replace them with an articulated two axle truck. This would have given more flexibility contrast for the single axle ends, and should have solved the truck hunting problem. That and replacing the 28" wheels (and associated journals) on the single axles with larger wheels and journals, which would have also allowed for heavier load limits.

Okay, that's a lot of work, but it would have provided data to prove the worthiness of a hybrid single/two axle carset over the stand alone single axle cars. The point is, the cars were tossed in the trash heap instead of upgraded to fix the problems experienced in the subjective arena. For the record, the Trough Train had single axle trucks on the coupler ends (38" wheels), and there is no record I know of pertaining to problems with those single axles, so the hybid concept of single's on one end of a subunit and two's on the other end seems legit.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, February 19, 2006 7:57 PM
Okay, I found a link via old issues of Railway Age website regarding the ABC-NACO tri-axle truck:

http://railwayage.com/may99/ridequality.html

The three axle offering from ABC-NACO was called the "TA2000 tri-axle" which was based on the Unitruck components of the Axle Motion truck. If I read it correctly, ABC-NACO was basing it's future offerings on the Unitruck single axle component, simply doubling or tripling the Unitrucks for two and three axle offerings, respectively. Makes sense from the standpoint of manufacturing standardization, and the Unitruck bogey had independent suspension on each axle, so ride quality and rail/wheel interaction would have been much improved over the simpler three piece two axle designs, regardless of the number of axles in the truck.

And from the picture in the article, it does look as if the TA2000 had a longer overall wheelbase than comparative two axle designs, but with the independent suspension and radial steering the rail/wheel interaction is still improved over rigid three piece two axle contemporaries. What isn't clear from the article (nor from inspecting the picture) is what if any tare weight increases would be involved. Overall tare increase yes, but relative tare to lading increase? Doesn't seem so.

Too bad ABC-NACO went under, because it seems they had the pulse of the future. Did the US railroad industry's reluctance to implement the advanced Unitruck design play a role in ABC-NACO's eventual bancruptcy?
  • Member since
    September 2002
  • From: Rockton, IL
  • 4,821 posts
Posted by jeaton on Sunday, February 19, 2006 8:12 PM
So what WAS the cost of this tri-axle designed compared to the standard two axle truck.

"We have met the enemy and he is us." Pogo Possum "We have met the anemone... and he is Russ." Bucky Katt "Prediction is very difficult, especially if it's about the future." Niels Bohr, Nobel laureate in physics

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, February 19, 2006 8:35 PM
QUOTE: Originally posted by jeaton

So what WAS the cost of this tri-axle designed compared to the standard two axle truck.


Probably more, given the independent suspension and radial steering. The point is, would it have cost more than a new 125 ton truck (both absolutely, and in relation to load factor and rail/wheel interaction costs)?
  • Member since
    September 2002
  • From: Rockton, IL
  • 4,821 posts
Posted by jeaton on Sunday, February 19, 2006 8:45 PM
Given that railroads have cost reduction as one of the higher priorities, it would appear that the answer to your question is "yes".

"We have met the enemy and he is us." Pogo Possum "We have met the anemone... and he is Russ." Bucky Katt "Prediction is very difficult, especially if it's about the future." Niels Bohr, Nobel laureate in physics

  • Member since
    November 2005
  • 2 posts
Posted by railroadport on Sunday, February 19, 2006 8:55 PM
SDI is providing new 115 pound rail. They only produce 39 foot lengths for special orders and charge a high preminum.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, February 19, 2006 8:57 PM
QUOTE: Originally posted by jeaton

Given that railroads have cost reduction as one of the higher priorities, it would appear that the answer to your question is "yes".


Cost reduction!?!?! If cost reduction was a high priority, we wouldn't even be discussing HAL. HAL raises costs, both in terms of needing costlier rail and rail components, and in terms of increased maintenance. I made the point before that should be obviously to everyone - it would have been less costly to make the upgrades to tri-axle bogies than it is to make the upgrades to the rails, because the rails cover what 50 - 60,000 miles worth of material (and how many tons worth of steel?), while all the new railcars, whether the new "improved" HAL railcars or the proposed tri-axle bogey cars, put end to end might amount to a few hundred miles of material at most.

Nope, if cost reduction was paramount, it would have been better to spend "new" money on the spread axle concept for all new heavy load railcars than it is to spend it on replacing miles and miles of track (not to mention the loss of shortline and branchline business due to these incomprehensible HAL's).
  • Member since
    September 2002
  • From: Rockton, IL
  • 4,821 posts
Posted by jeaton on Sunday, February 19, 2006 9:11 PM
And the cost figures to prove your assertion are found where?

"We have met the enemy and he is us." Pogo Possum "We have met the anemone... and he is Russ." Bucky Katt "Prediction is very difficult, especially if it's about the future." Niels Bohr, Nobel laureate in physics

  • Member since
    May 2003
  • From: US
  • 2,593 posts
Posted by PNWRMNM on Monday, February 20, 2006 1:05 AM
I concur with Jeaton. Lets see the data, and from a reliable professional source.
  • Member since
    July 2003
  • From: Appleton, WI
  • 275 posts
Posted by tormadel on Monday, February 20, 2006 1:34 AM
QUOTE: Originally posted by edbenton

Since you are looking at roughly 30 million a mile to lay all new trackager and ballast figure on roughly 6 mil a mile rough guess remember there is no need to put down new subroadbed and ballast just redoing the track figure on the rough guess of 6 mil a mile. That 30 mil a mile comes from what it is costing the BNSF to double track the transcon.


It's only costing UP $2 million a mile to double track the sunset route.... (and granted I don't have alot of industry insight but that sounds like alot of money for a 15foot wide 1 mile long stretch)
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Monday, February 20, 2006 3:48 PM
That $2 Million cost includes signal, structures, more like 30-50 feet minimum in new dirtwork, drainage work, sand fences, structures rehab and so -on. Plus some of the most bizzarre environmental accomodation measures ever seen (404B permitting is out of control)...
Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    December 2001
  • From: Northern New York
  • 25,026 posts
Posted by tree68 on Monday, February 20, 2006 6:01 PM
When I was riding the Adirondack last fall, the crew was discussing the rehab of the track between Saranac and Tupper. IIRC, they cited $1M a mile. Based on the the numbers given above, that would seem to be reasonable.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy