Trains.com

HAND OFF

609 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    April 2003
  • 305,205 posts
HAND OFF
Posted by Anonymous on Thursday, September 15, 2005 8:20 AM
I believe in the past, when a train was crossing the country,before the "fallen flag days," a diffrent crew and engine of the connecting railroad,would take over to continue the train on it's journey. I live near Dalton ga.,where the principle carrier is csx, norfolk southern & conrail. Yesterday I saw a BNSF,three engines,running a coal drag through town. Do railroads nowadays clear other carriers to run their loads though to their final destinations???? Thanks Easter
  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Thursday, September 15, 2005 9:44 AM
The motive power may run through with the rest of the train, but the crews still change at the usual interchange or division points.
The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    December 2001
  • From: Northern New York
  • 25,008 posts
Posted by tree68 on Thursday, September 15, 2005 11:02 AM
Motive power is so standardized today that virtually any engineer can run any power. The paint job doesn't matter. Add in the myriad power-sharing schemes and things get real interesting. Those BNSF engines might have been paying back hours owed.

In the days of steam engines an engineer might "own" his engine (not literally, but it was the one he always used and he was proud of it). No way he was handing it off to another engineer.

Consider, too, the labor and time required to change out the engines. I'm no expert, but I have to believe that leaving the power on a 100 car train cuts down significantly from the time needed to physically swap the engines, then perform whatever tests become necessary since the air was disconnected.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    December 2001
  • From: Upper Left Coast
  • 1,796 posts
Posted by kenneo on Thursday, September 15, 2005 11:21 AM
Swapping power can easily eat up 30 minutes. The fastest I have ever seen it done is 15 minutes; the usual is about 30 minutes or more when picking up a unit and putting it into multiple - unhook a motor, reach over and get the new motor(s), couple the hoses and the jumper, sander test, dynamic test, continuity test, air test (independent), back over to the train, couple more hoses, another jumper, another set of tests, send the Conductor to the rear of the train to do a "blow and go", Conductor walks back to the engine. And that is when things are going really well.
Eric

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy