Another EHH legacy may bite the dust.

6578 views
33 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Another EHH legacy may bite the dust.
Posted by blue streak 1 on Tuesday, May 28, 2024 8:44 PM

Cumberland MD radio reports CSX restoring hump.  This needs more investigation by those in the know.

CSX To Re-Install, Improve Hump at Cumberland | WCBC (wcbcradio.com)

EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain?

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Tuesday, May 28, 2024 9:50 PM

I don't know what actually took place when the hump was closed at Cumberland - to my knowledge it didn't not get the Tilford Yard treatment that happened in Atlanta.

In my 50+ years working - it was 'normal' for a new regime to 'close' some yard or facilitiy on the property and claim the closing would result in saving X millions.  The next regime would come on the scene and reopen the previously closed facility and claim the reopening would save Y millions.

What happened with EHH and his version of PSR was more involved and destructive than those that happened when I was employed.

Never too old to have a happy childhood!

              

  • Member since
    February 2002
  • From: Mpls/St.Paul
  • 13,892 posts
Posted by wjstix on Wednesday, May 29, 2024 10:07 AM

blue streak 1
EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain?

Interesting idea, but not sure how that would work?

In the earliest hump yards, each car had a yard worker riding it to apply the brakes manually. I'd think retarders, especially modern computer controlled ones, would be much cheaper and efficient than that.

Stix
  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Wednesday, May 29, 2024 12:18 PM

blue streak 1

EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain?

 
The only hump design that would reduce the use of retarders would be a grade that is not as steep so the acceleration due to gravity would be less.
     Retarders could be eliminated only by flat switching.
The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    March 2023
  • 11 posts
Posted by Reading467 on Wednesday, May 29, 2024 1:40 PM

blue streak 1

Cumberland MD radio reports CSX restoring hump.  This needs more investigation by those in the know.

CSX To Re-Install, Improve Hump at Cumberland | WCBC (wcbcradio.com)

EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain? 

 

Looking at Google Maps, the hump infrastructure still exists, including the tower and bridge for the locomotive duck under track.  The hump lead and distribution tracks were removed.  I assume some of the control systems from the tower to the retarders were also removed. 

  • Member since
    December 2001
  • From: Northern New York
  • 25,023 posts
Posted by tree68 on Wednesday, May 29, 2024 2:10 PM

Recall that Carl (cshaverr) was a retarder operator at a Chicago area yard.

The return of a hump yard may signal recognition that loose car railroading isn't going away any time soon.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    August 2019
  • 260 posts
Posted by Psychot on Wednesday, May 29, 2024 4:20 PM

I recall that UP tried to idle one of the humps at North Platte a few years ago. I think that lasted about a week.

  • Member since
    August 2019
  • 260 posts
Posted by Psychot on Wednesday, May 29, 2024 4:20 PM

wjstix

 

 
blue streak 1
EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain?

 

Interesting idea, but not sure how that would work?

In the earliest hump yards, each car had a yard worker riding it to apply the brakes manually. I'd think retarders, especially modern computer controlled ones, would be much cheaper and efficient than that.

 

Not to mention safer.

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Wednesday, May 29, 2024 4:43 PM

Psychot
 
wjstix
blue streak 1
EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain? 

Interesting idea, but not sure how that would work?

In the earliest hump yards, each car had a yard worker riding it to apply the brakes manually. I'd think retarders, especially modern computer controlled ones, would be much cheaper and efficient than that. 

Not to mention safer.

Back in the day - many non-retarder humps used track skates to define the far end of the tracks being humped into and let the skate stop the first car into the track and then continue to hump against the cars that were stopped by the skates.

Never too old to have a happy childhood!

              

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Wednesday, May 29, 2024 4:59 PM

tree68

The return of a hump yard may signal recognition that loose car railroading isn't going away any time soon.

We keep hearing that carload freight is dying and will one day disappear.  Yet new boxcars, flats, tanks and hoppers continue to be built, and out here in western Canada there is still a huge amount of chemical, forestry, oilfield and farming related freight that moves long distances and in amounts that are too large and heavy for trucking yet are not enough to make a 100 car unit train.

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    July 2010
  • From: Louisiana
  • 2,310 posts
Posted by Paul of Covington on Wednesday, May 29, 2024 10:16 PM

   From the article in the opening post:

      "plans are to remove the exisiting hump terminal and install new switching capabilities allowing more cars to be trafficked through the yard"

it sounded to me like they were going to replace the hump with a flat-switching facility, but they claimed that it would allow more cars to be handled.  Are they going to install a "new, improved" hump?

_____________ 

  "A stranger's just a friend you ain't met yet." --- Dave Gardner

  • Member since
    August 2004
  • From: The 17th hole at TPC
  • 2,283 posts
Posted by n012944 on Thursday, May 30, 2024 7:58 AM

"That has cost CSX across the country millions of dollards and several other yards are also abandoning the idea"

 

 

That sounds like it came form a hopeful employee more than anything else.  

An "expensive model collector"

  • Member since
    March 2011
  • 188 posts
Posted by dpeltier on Thursday, May 30, 2024 9:05 AM

blue streak 1

EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain?

Not really. In a hump yard, each car starts at the top of the hump going more or less the same speed, accelerates due to gravity, and (ideally) passes the last retarder at a speed such that it will be at a safe coupling speed when it reaches the coupling spot. The retarders are the only way to make that happen.

 

All cars are see the same acceleration due to gravity, but the deceleration due to air resistance is radically different for, say, a covered sand hopper versus an empty bulkhead flat. Without retarders, loaded cars would wind up going much faster than empties. Either the empties would stall out early, or the loads would couple at damaging speeds.

The only way to work around this would be to release different cars with different initial speeds, or at different spots on the hump. Either of those would eliminate the efficiency of humping in the first place - you would basically be flat-switching on a hill.

Maybe some day we'll have microprocessor-controlled brakes on each car, and the car can just be programmed to use the car's brakes to maintain a desired speed profilr. But we're pretty far from that (and not really heading in that direction at the moment).

One thing to note is that hump yards all have automated electronic switching systems setting the routes for each cut of cars down into the bowl, while most flat-switching yards use hand-throw switches. This is a somewhat separate issue from the hump itself. You can install an automatic routing system on a flat yard (and in fact Conrail has a yard where they did just that). But, if you are classifying enough cars to justify that kind of investment, there's a good chance that you can justify the expense of maintaining a hump and retarders as well. Once you've physically removed the hump - or, if your need is in a place that never has a hump - maybe the equation would be different. It's not a stretch to think we might see some more "automated flat yards" in the next couple decades.

Dan

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, May 30, 2024 11:41 AM

Replacing Hump Yards would be the application of the various autonomous operating cars - they become autonomous when released at the crest and insure a safe low impact coupling in the ultimate class track.

Never too old to have a happy childhood!

              

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Thursday, May 30, 2024 1:30 PM

blue streak 1

EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain?

CP sort of tried this in Calgary.  Kicking cars with power switches, not much of a hump and fewer retarders.  The new yard design had several accidents over its first year or so of operation.

https://www.tsb.gc.ca/eng/rapports-reports/rail/2019/r19c0002/r19c0002.html

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    March 2008
  • 112 posts
Posted by OWTX on Thursday, June 6, 2024 8:16 AM

n012944

That sounds like it came form a hopeful employee more than anything else.  

 

 
It fits the railfan golden triangle of wanting it to be true, two or three hops from what somebody thought they heard, and someone funnin' the foamers.
 
The reported premise is spending up to $40 million to sort 600 cars per day. Unless Joe Hinrichs wants his severance package in the near term, that seems unlikely.
 
I can see them reworking track centers and clearances on account of that trainee getting killed there last year.
  • Member since
    March 2008
  • 112 posts
Posted by OWTX on Friday, June 14, 2024 6:43 AM

Trains news-wire

Hump and tower are getting bulldozed. Reworking the track layout and adding automated ladder tracks at each end. Hindsight being 20/20, could they have flattened Cumberland in '94 and shifted westbound builds to Gateway? It had a better footprint (more acreage and longer).

  • Member since
    November 2014
  • 137 posts
Posted by JoeBlow on Friday, June 14, 2024 7:06 PM

EDIT:  Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain?

How much more does it cost to manually classify a train in a flat yard as opposed to a hump yard?
Hump yards are like automated warehouses such as some Amazon or US Postal Service facilities - really good if you have consistency in traffic volume and freight type. All of the automated shelving, conveyor belts and wrapping machines justify the expense. 
Flat yards are like a normal/stereotypical warehouses that can be found anywhere - really good if you having varying traffic volume and inconsistent freight type. Now pallet jacks, a forklift and hand wrapping are the right strategy. 
  • Member since
    September 2011
  • 6,449 posts
Posted by MidlandMike on Friday, June 14, 2024 9:14 PM

OWTX
Hump and tower are getting bulldozed. Reworking the track layout and adding automated ladder tracks at each end. ...

What is an automated ladder track?

  • Member since
    September 2002
  • From: Sterling Heights, Michigan
  • 1,691 posts
Posted by SD60MAC9500 on Tuesday, June 18, 2024 10:21 AM

SD70Dude

 

 
tree68

The return of a hump yard may signal recognition that loose car railroading isn't going away any time soon.

 

 

We keep hearing that carload freight is dying and will one day disappear.  Yet new boxcars, flats, tanks and hoppers continue to be built, and out here in western Canada there is still a huge amount of chemical, forestry, oilfield and farming related freight that moves long distances and in amounts that are too large and heavy for trucking yet are not enough to make a 100 car unit train.

 

Carload growth has been little to flat. The majority of these are replacements for cars currently reaching the AAR 50 year rule.

Rahhhhhhhhh!!!!
  • Member since
    September 2003
  • 21,669 posts
Posted by Overmod on Tuesday, June 18, 2024 12:40 PM

MidlandMike
What is an automated ladder track?

Uses power switches on the approach ladder so that a shove goes into the intended track for the next car or block to be cut off.  The locomotive and remainder of its consist then backs to the throat, and re-enters the next track, etc.

Likewise, the 'departure' ladder can be power-switched as a departing train is made up by repeated backing and coupling onto standing cuts.  

 

  • Member since
    September 2003
  • 21,669 posts
Posted by Overmod on Tuesday, June 18, 2024 12:57 PM

JoeBlow
Is it possible for a different design of a hump to eliminate or greatly reduce the use of retarders which are expensive to maintain?

Basically, no.

The whole premise of a hump yard is to add potential energy 'enough' that each of the cars in a cut will roll itself all the way to an assured coupling with its standing cut of cars (or to the skate or whatever in an as-yet-unoccupied track).  The only real alternative to retarders is to go back to the original method: station a brakeman on each car and have him 'eyeball' just how much brake he has to wind on, and how fast to wind it on, to get the car to a guaranteed pin-drop coupling.  In a world where boarding moving equipment is already deprecated, the idea that you'd stop the hump cut every time someone gets on board a car, and having the necessary number of strong backs ready to get on the cars you want to classify... well, let's just chuckle and move on.

This would be an ideal thing for a Boston Dynamics robot brakeman, with full HA-NDGPS and other sensors to get it as 'just right' (and then of course wind off the brake and check that the foundation has released, etc.).  They might even be equipped with high-speed ability to do parkour or whatever to get back up to the top of the hump in ™mely fashion to reduce that expensive capital requirement.  Now, in a world where a cockamamie non-starting idea like the Parallel Systems original concept can get $50 million of investment... who am I to say you couldn't finance this or make good grant money ringing the changes on how to build it (and yes, I think you could build and perhaps even maintain it)?  And yes, wouldn't these eventually make nifty 'superconductors' or engine crew?

But not as good as a good proportional retarder setup with scale and sensors to measure rolling characteristics, weather, etc.  One of the 'keys' to this is that both the uncoupling of cuts at the top of the hump and the programming of the retarder action has to be coordinated to allow the equivalent of block switching -- perhaps up to 40 cars in a given block -- for blocks distributed randomly in a given hump cut.  If you can't assure that, you might be better off with the automated ladder, and switcher power with LOTS of hybrid energy storage and the equivalent of Ludicrous++ acceleration using it.  Plus really good continuous monitoring and maintenance of the now faster-wearing parts of your approach ladder... something you can bet the PSR dolts haven't quite yet realized is going to be a concern.

  • Member since
    March 2008
  • 112 posts
Posted by OWTX on Sunday, June 23, 2024 10:56 AM

MidlandMike

 

What is an automated ladder track?
 

What Overmod said. The power switches are electronically controlled. Options depend on the vendor and CSX. Towers are replaced with a kiosk containing a control panel and multi-camera feeds to line up the moves, which are done by a RCO.

  • Member since
    March 2016
  • 349 posts
Posted by croteaudd on Sunday, June 23, 2024 12:09 PM

Now the TRAINS forum won't allow cutting and pasting!

I give up

  • Member since
    March 2016
  • 349 posts
Posted by croteaudd on Sunday, June 23, 2024 12:51 PM

One thing unrecognized is a pendulum swinging of sorts.  There is an advantage in doing something a certain way under a certain condition, and when a pendulum swings the other way, it is advantageous to do it the other way.  A SORTING FACILITY eliminates that and makes a constant flow of freight cars in various directions practical.  Until such is adopted (a model train layout, or a computer similation, would prove the concept), the pendulum switching will be eternal.

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Sunday, June 23, 2024 3:31 PM

croteaudd
One thing unrecognized is a pendulum swinging of sorts.  There is an advantage in doing something a certain way under a certain condition, and when a pendulum swings the other way, it is advantageous to do it the other way.  A SORTING FACILITY eliminates that and makes a constant flow of freight cars in various directions practical.  Until such is adopted (a model train layout, or a computer similation, would prove the concept), the pendulum switching will be eternal.

Through 50+ years of railroad employment - I watch the pendulum swing both ways many times.  Management #1 operates a specific physical plant.  Management #2 comes along and states they can save $X millions by closing Facility #14, and they close it - sending its traffic and employees elsewhere.  After a period of time Management #3 comes into control and states they can save $Y millions by reopening Facility #14 and they change the operating plan and bring manpower back to Facility #14.  Rinse & Repeat multiple times during my career.

On one Division, a major terminal had supervision to close one of the yards in the terminal - that 'plan' lasted about 48 hours and resulted in the terminal being codlocked and unable to move ANY traffic.  That 'plan' was stopped and things reverted to the prior plan.

 

Never too old to have a happy childhood!

              

  • Member since
    April 2016
  • 1,447 posts
Posted by Shadow the Cats owner on Thursday, June 27, 2024 6:53 PM

My hubby just laughs and remembers the SP/UP merger where UP decided that all the smaller yards around Houston were not needed besides the main one and the carnage that happened nationwide on their system for about the next 12-18 months.  

  • Member since
    September 2002
  • From: Sterling Heights, Michigan
  • 1,691 posts
Posted by SD60MAC9500 on Friday, June 28, 2024 5:56 PM

Shadow the Cats owner

My hubby just laughs and remembers the SP/UP merger where UP decided that all the smaller yards around Houston were not needed besides the main one and the carnage that happened nationwide on their system for about the next 12-18 months.  

 

UP tried to move all classification from Strang Yard, in La Porte, to Englewood. Strang was classifying 600 cars/day. I think Englewood was only good for 1800/day and that was pushing it. That caused a cascading effect across the network. Typical execs, trying to save a buck without a system analysis of Strang's closure..

Rahhhhhhhhh!!!!
  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Friday, June 28, 2024 10:38 PM

SD60MAC9500
 
Shadow the Cats owner

My hubby just laughs and remembers the SP/UP merger where UP decided that all the smaller yards around Houston were not needed besides the main one and the carnage that happened nationwide on their system for about the next 12-18 months.   

UP tried to move all classification from Strang Yard, in La Porte, to Englewood. Strang was classifying 600 cars/day. I think Englewood was only good for 1800/day and that was pushing it. That caused a cascading effect across the network. Typical execs, trying to save a buck without a system analysis of Strang's closure..

Operating Plans have to take into account the ability of the facilities upon which the plan is implemented.  Whatever the plan is - the entirety of the operating organization MUST remain fluid.

Immediately after the ConRail split, a ConRail executive was placed in charge of the CSX Operating Plan and melding it with the remains of the CR plan.  The CR plan was for 'fewer bigger trains' as CR had been doing.  CR had relatively bloated terminals that had their origins in their PRR & NYC predecessors whose facilites could hold several trains and still have room for inbound trains.  CSX terminals did not have excess capacity to hold traffic for the 'bigger' trains and within short order the entire CSX system was codlocked to a relative standstill.

After a couple of months, the CR individual was relieved of responsibilities and a CSX individual was placed in charge and implement a new plan that had terminals performing what they were actually able to do the fluidity was restored to the entire network.

It doesn't take much to throw an operating network into situation it can take weeks or months to dig out of.

From an operating perspective, the easiest way to bring a network to its knees is in not having a sufficient number of crews working.  Trains don't run without crews, a train that is no running requires track space for it to be parked until a crew becomes available, as more trains get into the situation of needing crews - more track parking space is required and the trains start getting parked further and further from the crew change location and the situation snowballs.  Digging line segments out of crew shortage is HELL. 

Never too old to have a happy childhood!

              

  • Member since
    July 2010
  • 351 posts
Posted by ns145 on Saturday, June 29, 2024 11:25 AM

.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy