Posted by railfanjohn on Wednesday, September 6, 2023 2:12 AM

Wytheville to Fort Chiswell (I-81;  I-77 overlap.  -  where you are driving south and north at the same time [must be the Twilight Zone]) is in west .... Virginia.  NOT in the State of West Virginia.

railfanjohn
  • Member since
    February 2008
  • From: Potomac Yard
  • 2,767 posts
Posted by NittanyLion on Tuesday, August 15, 2023 12:29 PM

BaltACD
Just like the situation in West Virginia where you have North South Interstates going in oposite directions on the same segments of road.  I-81 and I-77 - where you ar on I-81 North you are also on I-77 South.

While also physically moving east-west.  And also on US-11 and US-52.  Wytheville to Fort Chiswell is a weird stretch of road.

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Tuesday, August 15, 2023 10:46 AM

One day the division roadmaster told one of his section foremen to build a tool shed exactly halfway between two mileposts.  The foreman tells one of his men to go to the far milepost. At 1pm, they'll both start walking towards each other.  Where they meet will be halfway.  So they did and built the shed at their meeting point.

A few days later the roadmaster, who heard of how they measured the distance, stopped by where the section gang was working.  He told the foreman that because the foreman had a short stride and his section hand a long stride, the tool shed was not in the center but off by a several hundred feet.  The roadmaster said the foreman needed to move the shed.

A few weeks pass and the roadmaster notes the shed is now halfway between the mileposts, as originally instructed.  He again stops by to see the foreman.  He asks the foreman if he had any trouble moving the shed.  The foreman replied, "No trouble at all.  I moved the milepost instead of the shed."

Jeff

  

  • Member since
    June 2003
  • From: South Central,Ks
  • 7,170 posts
Posted by samfp1943 on Tuesday, August 15, 2023 7:32 AM

mudchicken

The western railroads tend not to use prefix codes in their milepost locations. If I start seeing prefix codes with mileposts, it means I somehow got off the reservation.

Sam may be looking for the wrong type of milepost as BNSF's standard plan has changed twice since 1996. (or B&B has not placed the new signs yet. The dreaded yellow machines and their cowboy operators may have destroyed the old ones...)

IN BNSF's world, the "AT-" indicates the predecessor railroad with "AT-" standing for ATSF, SF standing for SLSF, CS for C&S, BN for BN and so-on. Usually only seen with contract/license designations, the shorthand does pop up in other places.

 

  THANKS ! Mudchicken,

                                               Youyr explanation really sheds a lot of light nkkwhat is hapening out on the BNSF towards Augusta.   {the local desijgnation ofthe line that goes past my place is -Main 3 of the Eldorado sub- , it is marked just  noirth of the end of the line north of the old Mulvane Station is a painted sign on a t-post, MP127 .  

 

 

 


 

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Tuesday, August 15, 2023 7:09 AM

mvlandsw
   Distance is not the only point of confusion between the railroads and the public. I was involved in a court case where east and west were different. The railroad line goes east from Pittsburgh to Cumberland, but at the location in contention the tracks are actually headed west by the compass.

  Between Millvale and Etna, Pa. the B&O and PRR tracks are parallel. However the timetable directions show one going east and the other going west.

Just like the situation in West Virginia where you have North South Interstates going in oposite directions on the same segments of road.  I-81 and I-77 - where you ar on I-81 North you are also on I-77 South.

Never too old to have a happy childhood!

              

  • Member since
    December 2001
  • 1,190 posts
Posted by mvlandsw on Tuesday, August 15, 2023 4:01 AM

   Distance is not the only point of confusion between the railroads and the public. I was involved in a court case where east and west were different. The railroad line goes east from Pittsburgh to Cumberland, but at the location in contention the tracks are actually headed west by the compass.

  Between Millvale and Etna, Pa. the B&O and PRR tracks are parallel. However the timetable directions show one going east and the other going west.

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Tuesday, August 15, 2023 2:26 AM

The western railroads tend not to use prefix codes in their milepost locations. If I start seeing prefix codes with mileposts, it means I somehow got off the reservation.

Sam may be looking for the wrong type of milepost as BNSF's standard plan has changed twice since 1996. (or B&B has not placed the new signs yet. The dreaded yellow machines and their cowboy operators may have destroyed the old ones...)

IN BNSF's world, the "AT-" indicates the predecessor railroad with "AT-" standing for ATSF, SF standing for SLSF, CS for C&S, BN for BN and so-on. Usually only seen with contract/license designations, the shorthand does pop up in other places.

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Monday, August 14, 2023 8:18 PM

samfp1943
 
diningcar

BNSF now identifies its bridges with a painted or posted sign MP identification. 

   andadd to that a partial quote from the THREAD here that Mudchicken authored: 

  M C, said; "...See the old posts about long and short miles (usually due to line changes)

The FRA programmers need to join certain GIS mapping programmers about whining about physical miles being something other than 5280.0000 feet. They all need to get a life. (For that matter, FRA line segments change like the weather and some railroads don't use them at all or know what they are Confused .... and then the "fun" with the confusion between line segments and USRA/PC/CR line codes Bang Head

The Denver-Pueblo "joint line" used to drive operating people nuts. The 1998 re-mileposting by BNSF to kinda-sorta changing the mileposts to match ATSF mileposts to DRGW/C&S caused much havoc with recordkeeping, especially in the Denver and Pueblo terminals.

(and then there was the issue/ running gag of "fuzzy" math with train crews pooling enough fingers and toes to get over the district, especially when "stubby" was on your crew)

And then there is Mile Marker (MM) sneaking-in from the rubber-tired bubbas lexicon, usually via transit operators... Except on old UP mapping trying to show differences between a sign and a pole versus the true map location..."

Thew average personn simply equatesn the term mileage measuremen to mean, a mile beteween ,measurements.  Whodda thunk it would get so complicated? 

Recently, I took a short tour out to see the new construction on BNSF's line (Rose Hill,s. to Augusta,Ks.)   I had hoped to record what I saw by noting mieage MARKERS(?)

  It seemsthat they have olaced 'none' (?). The various signal bungalows and signals, all seemed to be identified, currently ,with a sgn that seems to list an alpha numeric, code.  (a couple of letters- AT-(?),and numbers(?). I wound up using street and road signs, and then guessing the distances....

Makes one wonder how a train crew will report their location to a Dispatcher in Ft. Worth,Tx ?

In the 26 years I spent Dispatching and interacting with the Public - we spoke two different languages - On the railroad Mile Post (or Marker) was spoken.  The Public tended to speak Hundred Block.  Never the twain will meet until someone mentions where a road or street crosses the railroad.

Locations with repeating issues become well known among train crews and Dispatchers as well as (on CSX) the Police & Safety Command Center. (PSCC)

Never too old to have a happy childhood!

              

  • Member since
    June 2003
  • From: South Central,Ks
  • 7,170 posts
Posted by samfp1943 on Monday, August 14, 2023 7:50 PM

diningcar

BNSF now identifies its bridges with a painted or posted sign MP identification.

 

   andadd to that a partial quote from the THREAD here that Mudchicken authored:

  M C, said; "...See the old posts about long and short miles (usually due to line changes)

The FRA programmers need to join certain GIS mapping programmers about whining about physical miles being something other than 5280.0000 feet. They all need to get a life. (For that matter, FRA line segments change like the weather and some railroads don't use them at all or know what they are Confused .... and then the "fun" with the confusion between line segments and USRA/PC/CR line codes Bang Head

The Denver-Pueblo "joint line" used to drive operating people nuts. The 1998 re-mileposting by BNSF to kinda-sorta changing the mileposts to match ATSF mileposts to DRGW/C&S caused much havoc with recordkeeping, especially in the Denver and Pueblo terminals.

(and then there was the issue/ running gag of "fuzzy" math with train crews pooling enough fingers and toes to get over the district, especially when "stubby" was on your crew)

And then there is Mile Marker (MM) sneaking-in from the rubber-tired bubbas lexicon, usually via transit operators... Except on old UP mapping trying to show differences between a sign and a pole versus the true map location..."

Thew average personn simply equatesn the term mileage measuremen to mean, a mile beteween ,measurements.  Whodda thunk it would get so complicated?

 

Recently, I took a short tour out to see the new construction on BNSF's line (Rose Hill,s. to Augusta,Ks.)   I had hoped to record what I saw by noting mieage MARKERS(?)

  It seems that they have placed 'none' (?). The various signal bungalows and signals, all seemed to be identified, currently ,with a sgn that seems to list an alpha numeric, code.  (a couple of letters- AT-(?),and numbers(?). I wound up using street and road signs, and then guessing the distances....

Makes one wonder how a train crew will report their location to a Dispatcher in Ft. Worth,Tx ?

 

 


 

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Monday, August 14, 2023 10:11 AM

zugmann

 

 
mudchicken
And then there is Mile Marker (MM) sneaking-in from the rubber-tired bubbas lexicon, usually via transit operators.

 

Mile marker is a term that was always commonly used around here - even from the old head dispatchers that have been doing it for their whole careers. 

 

Nor have I ever heard of operating people (or unions) trying to change milepost names.  Maybe that's a thing from where you are?  

 

zugmann

 

 
mudchicken
And then there is Mile Marker (MM) sneaking-in from the rubber-tired bubbas lexicon, usually via transit operators.

 

Mile marker is a term that was always commonly used around here - even from the old head dispatchers that have been doing it for their whole careers. 

 

Nor have I ever heard of operating people (or unions) trying to change milepost names.  Maybe that's a thing from where you are?  

 

zugmann

 

 
mudchicken
And then there is Mile Marker (MM) sneaking-in from the rubber-tired bubbas lexicon, usually via transit operators.

 

Mile marker is a term that was always commonly used around here - even from the old head dispatchers that have been doing it for their whole careers. 

 

Nor have I ever heard of operating people (or unions) trying to change milepost names.  Maybe that's a thing from where you are?  

 

KS, MO, OH, FL .... mostly combined rail lines

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Monday, August 14, 2023 9:23 AM

BNSF now identifies its bridges with a painted or posted sign MP identification.

  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Monday, August 14, 2023 9:02 AM

mudchicken
And then there is Mile Marker (MM) sneaking-in from the rubber-tired bubbas lexicon, usually via transit operators.

Mile marker is a term that was always commonly used around here - even from the old head dispatchers that have been doing it for their whole careers. 

 

Nor have I ever heard of operating people (or unions) trying to change milepost names.  Maybe that's a thing from where you are?  

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Monday, August 14, 2023 12:43 AM

Random thoughts:

As long as you have operating people (and unions), there will be attempts to modify changes/ naming to the mileposts in the field. Just let them be.

Used to be (before the pole lines come down) that there could be anywhere between 35-55 poles per mile. It was totally dependent on how many cross-arms/ gains you had on the poles and how much weight you had above the ground. Timetables stated how many poles per mile on a given territory.

Old license/ contract agreements written by some railroads (Rock Island for one, their engineering staff died earlier than most) could really confuse non-railroaders.

Mileposts measured on a map (by stationing) versus mileposts in the field could differ greatly.

If you've ever been west, then you have to see the absurd skyscraper mileposts on the Cotton-Rock in KS-OK-NM that had to be the same height as the locomotive cab windows.

See the old posts about long and short miles (usually due to line changes)

The FRA programmers need to join certain GIS mapping programmers about whining about physical miles being something other than 5280.0000 feet. They all need to get a life. (For that matter, FRA line segments change like the weather and some railroads don't use them at all or know what they are Confused .... and then the "fun" with the confusion between line segments and USRA/PC/CR line codes Bang Head

The Denver-Pueblo "joint line" used to drive operating people nuts. The 1998 re-mileposting by BNSF to kinda-sorta changing the mileposts to match ATSF mileposts to DRGW/C&S caused much havoc with recordkeeping, especially in the Denver and Pueblo terminals.

(and then there was the issue/ running gag of "fuzzy" math with train crews pooling enough fingers and toes to get over the district, especially when "stubby" was on your crew)

And then there is Mile Marker (MM) sneaking-in from the rubber-tired bubbas lexicon, usually via transit operators... Except on old UP mapping trying to show differences between a sign and a pole versus the true map location.

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Saturday, August 12, 2023 6:49 AM

Erik_Mag

Then there were the "smileposts" alluded to in Frank Ellison's articles on his Delta Lines layout first published in 1944, then re-published in 1964.

I've got my layout set up with smileposts - fast time miles.  A scale mile in HO is on the order of 66 feet - longer than most layouts.  Divide that by 12 for a 12:1 fast clock and you might get several more squeezed in...

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    January 2019
  • 1,686 posts
Posted by Erik_Mag on Saturday, August 12, 2023 12:48 AM

Then there were the "smileposts" alluded to in Frank Ellison's articles on his Delta Lines layout first published in 1944, then re-published in 1964.

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Friday, August 11, 2023 8:36 PM

timz

 

 
jeffhergert
They do have 1/4, 1/2, and 3/4 signs.  At least on the main lines.

 

You're a UP guy -- it's had quarter-mile signs/poles forever. Did any other RR have them?

 

Wonder if UP put rings on poles on any of its post-1982 additions. Don't recall if I saw them on WP.

 

On the CNW once the pole lines were abandoned, they first left the ones with rings and mile plate standing. The rest, for the most part, were cut off at the base.  Later they put up signs with stripes, one, two and three for the the quarters and half  miles.  UP replaced them with signs that had the actual fractions. Many that are now getting sun bleached so you can't read them. 

I would guess UP on lines it took over that didn't have rings or signs would've placed signs along the ROW.

Locations with a lot of wires used 50 poles to the mile.

Jeff 

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Friday, August 11, 2023 6:27 PM

My memory has failed on the details of how the B&O St. Louis Division stated the miles and posts in the train orders.  The following is a snippit of the 1960 Employee Timetable permanent speed restrictions for three classes of traffic - Passenger/Express being fastest.  Fast Freight being next fastest.  Slow Freight/Local Freight being the slowest

 

As can be seen it is stated as Pole 327-45 as an example.  Obviously, at least in this location there were more than 40 poles to the mile.

Never too old to have a happy childhood!

              

  • Member since
    February 2005
  • 2,366 posts
Posted by timz on Friday, August 11, 2023 5:39 PM

jeffhergert
They do have 1/4, 1/2, and 3/4 signs.  At least on the main lines.

You're a UP guy -- it's had quarter-mile signs/poles forever. Did any other RR have them?

Wonder if UP put rings on poles on any of its post-1982 additions. Don't recall if I saw them on WP.

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Friday, August 11, 2023 4:07 PM

CSSHEGEWISCH

In reference to Balt's example of a slow order, it may refer to four (telegraph) poles past Mile 53.

 

Yes, that's what Balt is referring to.  Communication poles often had rings,  one ring = 1/4, two = 1/2, three = 3/4 of a mile where nominally 40 poles to a mile existed.  They also correspond to pole 10, 20, and 30. 

Some railroads would use, for example, 20 poles west (or east, north, south as needed) of MP 123.  Others would use MP 123 Pole 20.  And others would use MP 123.5, even when the pole line was maintained. 

Now it's all mile post/pole and decimal.  They do have 1/4, 1/2, and 3/4 signs.  At least on the main lines. 

Jeff 

  • Member since
    February 2005
  • 2,366 posts
Posted by timz on Friday, August 11, 2023 12:42 PM

Yeah, that's what it would mean on a RR like B&O that used trackside markers as mileposts. Most? western RRs did put mileposts on the pole-line poles.

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Friday, August 11, 2023 10:04 AM

In reference to Balt's example of a slow order, it may refer to four (telegraph) poles past Mile 53.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Friday, August 11, 2023 7:38 AM

"Mile pole" is a new term to me - they've always been mileposts.  But I've never seen a marker on a pole line, either.  We still have some concrete mileposts, as well as some wooden replacements fashioned to resemble the concrete posts, and now just a reflective plate on a fencepost.  

Historically, I'd love to see concrete mileposts back in place, but I doubt the molds used to cast them are still around, so one would have to create them.  Moveable numbers and all.

The mileposts on the old Adirondack Division still use an "H" prefix - for Herkimer, the starting point of the original Mohawk and Malone.  The line between Herkimer and Remsen came up years ago...  The Mohawk, Adirondack & Northern's line out of Utica has a "U" prefix which is also used in the Carthage area, completely disconnected from the lower portion.

One wrinkle between the two is that the spot where the Adirondack Division splits off from the MWHA line (Snow Junction) is ~ MPU22 on the MWHA, but ~MPH29 on the Adirondack.  So if you want to know how far from Utica you are on the Adirondack, you have to subtract about 7 miles from the "H" milepost...

 

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, August 10, 2023 10:39 PM

jeffhergert
Not to Hi-Jack Balt's thread, but I am.  (Pilot, take this forum to Cuba!)

Which term do you prefer, "Mile Posts'' or "Mile Pole?"  Either term is allowable on the railroad.  Almost universally around me, co-workers including dispatchers, use mile pole.  I use mile posts myself.

My theory for which term used is it depends on the railroad, and possibly specific regions on that railroad.  New people will use the term used by the old heads, handed down from one generation to the next.  In my territory, both UP and CNW had mile marker plates on the communication poles along the right of way.  It was late in the game when they again started placing mile markers on track side steel posts.  Hence the term mile pole had become the standard.

I use mile post because my early years, pre-railroad employment was spent along the Rock Island.  They had cement mile posts, at least on the main line, and mile post was the term used.  So I learned to use the term mile post.

Ok. the hi-jack is over. The forum may continue to it's ultimate destination.

Jeff   

In my career in different locations both have been used.  In the computerized portion of my career 'milepost' has been what has been used, however, when I broke in on the B&O's St. Louis Division slow orders were normally put out in the form - "Do not exceed 10 MPH between Mile 53 Pole 4 and Mile 53 Pole 6"

Never too old to have a happy childhood!

              

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Thursday, August 10, 2023 9:25 PM

Not to Hi-Jack Balt's thread, but I am.  (Pilot, take this forum to Cuba!)

Which term do you prefer, "Mile Posts'' or "Mile Pole?"  Either term is allowable on the railroad.  Almost universally around me, co-workers including dispatchers, use mile pole.  I use mile posts myself.

My theory for which term used is it depends on the railroad, and possibly specific regions on that railroad.  New people will use the term used by the old heads, handed down from one generation to the next.  In my territory, both UP and CNW had mile marker plates on the communication poles along the right of way.  It was late in the game when they again started placing mile markers on track side steel posts.  Hence the term mile pole had become the standard.

I use mile post because my early years, pre-railroad employment was spent along the Rock Island.  They had cement mile posts, at least on the main line, and mile post was the term used.  So I learned to use the term mile post.

Ok. the hi-jack is over. The forum may continue to it's ultimate destination.

Jeff   

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, August 10, 2023 3:30 PM

caldreamer
If the symbol and milepost were combined (eg: HA68) into one field them there would be no confilct. When I was a programmer I hated to be awakened in the middle of the night to have to come in to fix a SOC7 error.

One field is what the CSX milepost data element is, with no preceeding spaces allowed.

Milepost for Birmingham is '000389' - the zeros are required.
Milepost for Richmond is 'A    0' - A fours spaces and zero
Milepost for Bayview Yard Baltimore is 'BAK 88'
Milepost for Cumberland is 'BA 178'
Milepost for Station Square Pittsburg is both 'PLE  0' and 'PLY  0', as existed on the P&LE when it was a independent railroad
Milepost for Waycross is 'ANB587'

Blending 'together' mileposts that for the most part have existed since 'day one' on a myriad of rail lines is significant undertaking.

 

Never too old to have a happy childhood!

              

  • Member since
    September 2013
  • 2,505 posts
Posted by caldreamer on Thursday, August 10, 2023 12:01 PM

If the symbol and milepost were combined (eg: HA68) into one field them there would be no confilct. When I was a programmer I hated to be awakened in the middle of the night to have to come in to fix a SOC7 error.

   

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, August 10, 2023 9:26 AM

tree68
I pulled up the listing for Broome County, NY, mainly because I know there are several railroads running there.

NS has several prefixes in use (HA, VT, SR) while NYSW has only S.  CNYK has no prefixes - just the MP number.

This leads me to believe that it would take two fields matching (railroad and MP) for there to be a conflict.

On the CSX St. Lawrence Sub, many of the physical mileposts still show S (Syracuse) but for EC1's the mileposts are given as QM now.  The Water Level Route is QC.  Both are former NYC/PC/Conrail routes.

CSX assigned a Q prefix for former CR terrirories when they became a part of CSX.

Never too old to have a happy childhood!

              

  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Thursday, August 10, 2023 7:44 AM

I pulled up the listing for Broome County, NY, mainly because I know there are several railroads running there.

NS has several prefixes in use (HA, VT, SR) while NYSW has only S.  CNYK has no prefixes - just the MP number.

This leads me to believe that it would take two fields matching (railroad and MP) for there to be a conflict.

On the CSX St. Lawrence Sub, many of the physical mileposts still show S (Syracuse) but for EC1's the mileposts are given as QM now.  The Water Level Route is QC.  Both are former NYC/PC/Conrail routes.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, August 10, 2023 7:34 AM

When I was working - CSX's milepost field was a 6 character field.  Nominally it was three columns of prefix and three colums of numerics.  That being said, some of the prefixes were also numeric - (Prior L&N track segments had variations on 0 [zero] as their prefix).  Some mileposts exceeded three digits - Homestead Sub, were SX and four numerics.

Each carrier has designed systems that made sense to 'THEM'.  The FRA has to make a system that incorporates ALL carriers.

Never too old to have a happy childhood!

              

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy