ccltrainsIf my memory is correct I think the fed have rules that speeds of 80 and higher require complete isolation from highways etc.
You are right on the principle but wrong on the speed: note that the ex-Alton 110mph project is rife with grade crossings. I believe the number requiring full separation is 125mph and that we have discussed this in some of the HSR threads.
If my memory is correct I think the fed have rules that speeds of 80 and higher require complete isolation from highways etc. if this is the case posting a max speed of 79 would be CYA.
On standing too close to a train you might be caught in a vortex and sucked into the side of the train. That would ruin your day.
Today I heard a train report that the conductor's windshield had been shattered by a loose chain on a passing train. The chain was able to swing up and hit the windshield.
I once had a passing train throw some object up and break the glass in the number board of our engine. This was an engine that had the number board above the cab instead of on the nose.
Jeff
Thanks gents!
One thing's for certain. I'll bet those raifans shooting video now know exactly how those newsreel cameramen back in 1937 who caught the Hindenburg disaster felt!
I mean, that wasn't supposed to happen either!
tree68 Flintlock76 I'm also surprised there was no way to lock it in place, but what do I know? There is, and it appeared to me that he did make sure the lock/latch was in place. It also appeared that he verified the position of the points. The bounce in the lever is not unusual. Odds are one of the cars picked the switch - perhaps a case of too sharp a profile on the flanges.
Flintlock76 I'm also surprised there was no way to lock it in place, but what do I know?
There is, and it appeared to me that he did make sure the lock/latch was in place. It also appeared that he verified the position of the points. The bounce in the lever is not unusual.
Odds are one of the cars picked the switch - perhaps a case of too sharp a profile on the flanges.
Sharp flange or a worn switch point. There are keepers on 'switch ties' either side of the switch machine to secure the switch 'ball' and its activation bar.
Brakeman steps on the treadle on the left to release the switch ball and rod and observes that the rod and ball are secured on the other side when completing throwing the switch. In the 2nd video it appears that both these things were done properly as well as the brakeman observing that the points did actually throw and mate against the stock rail.
Never too old to have a happy childhood!
Larry Resident Microferroequinologist (at least at my house) Everyone goes home; Safety begins with you My Opinion. Standard Disclaimers Apply. No Expiration Date Come ride the rails with me! There's one thing about humility - the moment you think you've got it, you've lost it...
Oh brother!
Video One. I'm no expert on railroad operations, far from it and wouldn't claim to be, but something didn't seem right with that switch when the crewman threw the lever. It seemed awful "bouncy," for lack of a better term, like something was preventing it from seating all the way. I'm also surprised there was no way to lock it in place, but what do I know?
Video Two. Man, who could see that coming?
Thank God no-one was hurt in either incident!
Watch both to the end.
https://www.youtube.com/watch?v=03Nq632eV6I
https://www.youtube.com/watch?v=1zzmEROlTnc
...
HarrisonNext time I'm in Utica, I will stand a few more feet back... Too bad I can't call dispatch...
Just program the CSX emergency number in your phone.
We have some folks who know people, if you will.
tree68 We were boarding one of our Polar Express trains some years ago when an eastbound freight came through Utica on track two. Fortunately, our platform is on the north side of track one - a nice safety margin. About ten cars from the end of the train we spotted a large chain dangling off a flat car, bouncing off the ballast. As they say, "that would have left a mark." We contacted the dispatcher, who presumably contacted the train.
We were boarding one of our Polar Express trains some years ago when an eastbound freight came through Utica on track two. Fortunately, our platform is on the north side of track one - a nice safety margin.
About ten cars from the end of the train we spotted a large chain dangling off a flat car, bouncing off the ballast.
As they say, "that would have left a mark."
We contacted the dispatcher, who presumably contacted the train.
Next time I'm in Utica, I will stand a few more feet back... Too bad I can't call dispatch...
Harrison
Homeschooler living In upstate NY a.k.a Northern NY.
Modeling the D&H in 1978.
Route of the famous "Montreal Limited"
My YouTube
oltmannd Sometimes you have to watch for flying ice! https://www.railpictures.net/photo/357034/ https://www.railpictures.net/photo/8998/ ...from the tops of the ties. The cool thing here was seeing a Metroliner unescorted by a GG1 in the snow.
Sometimes you have to watch for flying ice!
https://www.railpictures.net/photo/357034/
https://www.railpictures.net/photo/8998/
...from the tops of the ties.
The cool thing here was seeing a Metroliner unescorted by a GG1 in the snow.
Sometimes it ain't just ice from the ties...
https://www.youtube.com/watch?v=V-Cb9x70gYQ
Even better...
https://www.youtube.com/watch?v=Npm4ElvJWJg
"We're singin' a song, as we go along, walkin' in a Winter Wonderland!"
So the moral of the story is kids, when you're trackside keep your eyes and ears open, stay alert, atay engaged, be aware of your surroundings, and what's going on in those surroundings!
"Cause you never know, do you?
Overmod Lithonia Operator How does lowering speed limits by only 1 mph have any meaningful effect at all? It keeps you from violating Federal law. All the speed restriction stuff regarding ATS/ATC refers back to the Esch Act of 1920, which prohibits passenger trains from going 80mph, or ultimately freight trains from going 60mph, without functioning automatic train control. The "79mph" is nothing more than the highest speed that doesn't violate that rule. The ICC Order of 1947 just re-imposed strict adherence to the earlier limits, since they were already in law. I had to chuckle a bit at that NYC story about the engineer on NYC electrics making up time. William Wilgus effectively lost his job when a couple of NYC engineers got a bit too excited in the first days of the electrification and piled up what were designed as 2-D-2s; the 'fix' was -- without telling the designer -- to shoehorn a pin-guided four-wheel truck under each end.
Lithonia Operator How does lowering speed limits by only 1 mph have any meaningful effect at all?
It keeps you from violating Federal law.
All the speed restriction stuff regarding ATS/ATC refers back to the Esch Act of 1920, which prohibits passenger trains from going 80mph, or ultimately freight trains from going 60mph, without functioning automatic train control. The "79mph" is nothing more than the highest speed that doesn't violate that rule.
The ICC Order of 1947 just re-imposed strict adherence to the earlier limits, since they were already in law.
I had to chuckle a bit at that NYC story about the engineer on NYC electrics making up time. William Wilgus effectively lost his job when a couple of NYC engineers got a bit too excited in the first days of the electrification and piled up what were designed as 2-D-2s; the 'fix' was -- without telling the designer -- to shoehorn a pin-guided four-wheel truck under each end.
Employee titmetables do state the maximum speeds allowed on the roads.
Johnny
CSSHEGEWISCHYou're conflating the Whyte system and the AAR system.
No, it's fat fingers on a phone late at night.
Wilgus designed them with a Bissel at each end, to maximize the weight available on drivers (and with reasonably good knowledge that Bissels as leading trucks on high-speed locomotives could be made to work -- see LS&MS.)
After the two wrecks, NYC brass (I don't know exactly who) went over Wilgus' head entirely to bring the motors into Harmon on a crash priority and install those four-wheel engine trucks. (I'm still astounded they could get them to fit in there!) Wilgus, miffed, tendered his resignation as a tactic ... and it was accepted. For that reason he gets only a shred of the credit he deserves for making the whole Grand Central Station plant work.
Does anyone here remember if the timeline for 'converting' the LS&MS Prairies to inferior Pacifics postdates the "issues" with the electrics?
You're conflating the Whyte system and the AAR system. NYC's S-motors were built as 1-D-1 (2-8-2) and rebuilt to 2-D-2 (4-8-4) to improve tracking as speed. At any rate, they were virtually indestructible and a handful wound up on the Conrail roster.
Lithonia OperatorHow does lowering speed limits by only 1 mph have any meaningful effect at all?
I had to chuckle a bit at that NYC story about the engineer on NYC electrics making up time. William Wilgus effectively lost his job when a couple of NYC engineers got a bit too excited in the first days of the electrification and piled up what were designed as 2-D-2s 1-D-1s; (see following post); the 'fix' was -- without telling the designer -- to shoehorn a pin-guided four-wheel truck under each end.
Deggesty the pickup coil on a freight engine came loose and cleaned a switch stand. The vibrations as the train passed moved the switch and the following cars were derailed. The end result was that the Southern petitioned to discontinue all its ATS system--and the petition was granted.
DeggestyIt does not; at that time, many engineers did run as fast as they thought was proper, considering the road and anything else that could have an effect on their speed.
Dating back to steam days - NYC, of course, ran electrics out of NYC, then changed to steam engines for the rest of the trip to Albany and points beyond.
I read of one steam engineer who got his orders (and others probably got the same orders) - "Do not arrive in Albany before..." Ie, just don't get there early. Otherwise, we don't care how fast you run...
How does lowering speed limits by only 1 mph have any meaningful effect at all?
DeggestyRemoving ABS systemwide did reduce some of the operating expense.
Which they're paying for now, tenfold.
It's been fun. But it isn't much fun anymore. Signing off for now.
The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any
zugmann I just like how they used the excuse of a derailment to get rid of ATS. Makes me wonder if it was even the cause. Any wonder why PTC got shoved down their throats?
I just like how they used the excuse of a derailment to get rid of ATS. Makes me wonder if it was even the cause.
Any wonder why PTC got shoved down their throats?
-Don (Random stuff, mostly about trains - what else? http://blerfblog.blogspot.com/)
Jeff, there may have been an ICC order later than the one in 1948 which restricted freights to 59 mph in ABS territory, but that is the only one that I know of. It limited dark territory speeds to 49 mph for freights and 59 mph for passengers.
With ACS or ATC there was no ICC ordered limit.
Regardless of the ICC limits, we know that many engineers, knowing their territory, would run much faster. I recall, riding in the center seat of the engine on the City of New Orleans between Memphis and Grenada, seeing the speedometer needle hover around 90 mph most of the way. Once, when riding #4 from Bookhaven to Jackson, I timed a mile above Crystal Springs in 35 seconds--two engines, RPO, baggage, and three coaches.--all with ABS. (single track from just below Memphis to North Jackson and crossing Pass Manchac.
On that run from Memphis, I handled the horn until it became too dark for me to distinguish mile posts from whistle posts; going through some towns, it was impossible to blow a proper signal for all of the crossings--by the time we reached one crossing the first blast for the next crossing should have been blown--the engineer did not correct me for my style in that situation (last blast for one was the first blast for the next).
Exactly.
When Amtrak made the new ruling that passengers in private cars were not allowed on open platforms or open windows, I thought it was silly.
I guess it wasn't as silly as I thought.
York1 John
You'll have to ask the lawyers.
Deggesty As to damage to switch stands, for many years the Southern Railway had ATS on many lines. Back in the seventies (it may have been the late sixties), the pickup coil on a freight engine came loose and cleaned a switch stand. The vibrations as the train passed moved the switch and the following cars were derailed. The end result was that the Southern petitioned to discontinue all its ATS system--and the petition was granted. In all of the ETT's that I had seen, the maximum allowed for passenger trains was 80 mph, which was then reduced to 79 mph, and the highest freight speed allowed was reduced from 60 mph to 59 mph in all ABS territory. The damage took place on the AGS above Birmingham.
As to damage to switch stands, for many years the Southern Railway had ATS on many lines. Back in the seventies (it may have been the late sixties), the pickup coil on a freight engine came loose and cleaned a switch stand. The vibrations as the train passed moved the switch and the following cars were derailed. The end result was that the Southern petitioned to discontinue all its ATS system--and the petition was granted. In all of the ETT's that I had seen, the maximum allowed for passenger trains was 80 mph, which was then reduced to 79 mph, and the highest freight speed allowed was reduced from 60 mph to 59 mph in all ABS territory.
The damage took place on the AGS above Birmingham.
I can understand the changing of the passenger trains by 1 mph, but not the freight. I don't think that freight train speeds in signalled territory were restricted, other than the 79 MPH, without cab signals, ATC, or ATC, etc. I've seen ETTs of other railroads that had 60 MPH, and even 70 MPH, speeds allowed for freight trains in territory that only had ABS and no other additional safety appurtenances.
I was stopped on the ex NYC Shortline at Parma Oh. to line the switches to the ex B&O Cleveland subdivision with the Q641. This train carried blocks of construction debris, some of which were covered with large tarps, some of which were not securely fastened. An overtaking train passed by with a tarp wrapped completely around the cab.
At McKees Rocks on the ex P&LE work was being done on the overhead highway bridge. As I passed underneath with permission of the flagman at the site the workers lowered a safety net far enough that my locomotive caught it and pulled it from the bridge.
Back to the original topic, CSX had a dragging chain rip out a facing point switch stand causing a derailment.
A friend of mine had his ear almost cut off by a steel band while waiting for a train to clear a siding switch.
Mark Vinski
Our community is FREE to join. To participate you must either login or register for an account.