Trains.com

How to double capacity of U.S. railroads (without even building a single mile of new track)

3874 views
66 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2002
  • 910 posts
Posted by arbfbe on Thursday, December 9, 2004 12:30 AM
There are several reasons MRRT chose Sandpoint. Primarily, BN was not as excusion friendly as they are now. BN had to support AMTK sponsored excursions but then AMTK had no agreements with MRL. MRRT would have had to share revenues with yet another 'partner' if AMTK came aboard for the BN segment. MRRT also had no history at that time as they do now. Land and trackage for the equipment storage, maintenance and switching were readily available on the MRL where there would be far less vandalism than Spokane. There would be no payments to BN other than deadheading of equipment between Portland and Sandpoint. Using Sandpoint as a base would avoid the Spokane - Yardley - Sandpoint massive cluster that could add hours to the trip at the beginning end or the trailing end.

MRRT still has a contract to operate trains on the MRL through 2006. While it is not likely they will operate any trains in 2005 account the lateness to advertise and organize any trips before the summer season there are still plans to operate a full travel season in 2006 in celebration of the final year of the Lewis & Clark Bicentennial. Let's hope that can still happen. It would be a reason for you to come back and ride, eh, Mark?

Alan
  • Member since
    September 2003
  • From: NotIn, TX
  • 617 posts
Posted by VerMontanan on Wednesday, December 8, 2004 10:44 PM
Futuremodal stated:
"1. Why would rerouting Amtrak from Stevens Pass to Stampede Pass require "another set of equipment it doesn't have." You are using the same equipment. You can also separate the Portland leg at Pasco rather than Spokane. Wouldn't the latter free up equipment?"

As I explained earlier, rerouting the Empire Builder from Stevens Pass to Stampede Pass would require another set of equipment on the Seattle leg because of the increased running time. Even if the track was upgraded to passenger train speeds and a continuous ABS system (which it does not now currently have) installed, the Stampede Pass route would require 2 hours additional running time in each direction. So, the westbound train would arrive Seattle about 2 hours later and have to leave 2 hours earlier. Since turnaround time is only a bit over 6 hours currently, this would reduce turnaround time to just a bit over 2 hours, which is not feasible. Of course, the train's schedule could be changed, but that would eliminate connections at Chicago and Portland. The Empire Builder, as currently scheduled, is delicately timed to make all eastern connections in Chicago, the Coast Starlight in Portland, and provide a same-day turnaround in Seattle and Portland. Something would have to give if the train was operated over Stampede Pass. If all the connections were maintained, an additional set of equipment would be required on the Seattle section, very simple. As for separating the train at Pasco instead of Spokane freeing up equipment: It would run Spokane to Portland on the same route in the same amount of time with splitting the train in Pasco taking the identical amount of time than it would in Spokane. How in the world could this free up equipment?

Futuremodal continued"
"2. You also state, "Also, the problems the UP is having in Portland have nothing to do with capacity along the "I-5"." It is 134 miles from Vancouver to Tacoma. If it is taking 6.5 hours for this run, that's about 20 miles an hour over water level trackage. Clearly, that slow of a transit time suggests congestion on that line. However, you will note that the real congestion for UP is in the Gorge, and the gist of my point is that the Stampede Pass reroute would free up some capacity on this line for Puget Sound bound/origin UP trains. You do give a reluctant aknowledgement of that point. Perhaps a better example is the one pointed out regarding Cajon Pass, where BNSF is exploring adding trackage while the parallel UP line has extra capacity. "

Sorry, but mentioning the terminal time in Portland was only to point out that this is a problem on the UP. Therefore, you supposition that UP trains could be on duty at Tacoma or Seattle and then make the run to Hinkle or someplace east via Stampede Pass with one crew is flawed because logic would dictate that how the trains operate would have nothing to do with terminal issues, especially at Tacoma and Seattle. The Portland scenario was just an example of UP's lengthly ITD problems (and similar problems are the norm at Seattle and Tacoma now).

Futuremodal continues:
"3. You also state, "The Empire Builder, as an example, is a small part of the 45 or so trains a day that move on the Hi-Line across Montana, so one would have to wonder whether it's that big of a deal to get rid of it to BNSF (which, as I said earlier, benefits BNSF by providing crew transportation in all weather where there is no parallel public transportation)." Doesn't the Hi-Line parallel U.S. highway 2? If having Amtrak to provide crew transportation is that much of an asset to BNSF, wouldn't BNSF want Amtrak on it's half dozen or so other lines through Montana, Wyoming, the Dakotas? You are mistaking PR for bottom line results. What is really interesting is your opposition to moving the Empire Builder to the I-90 corridor through Montana, which hits most of the population centers in Montana. Wouldn't that increase online ridership?"

Well, this certainly displays your ignorance about the unique characteristics of the Empire Builder and its route. The Empire Builder serves the least on line population of any long distance train that Amtrak operates, yet in FY2004, the Empire Builder finished as Amtrak's single most ridden train. Now, if population was the deciding factor in determining ridership as you suggest, then why isn't the Empire Builder the least-ridden train in America? Well, because of lack of transportation alternatives. That's why more people (in 2003) boarded the Amtrak in Whitefi***han they did Albuquerque or Salt Lake City and why more people boarded Amtrak in Minot than they did in Omaha, and why more people boarded Amtrak in Shelby (population 3,000) than in the state capital cities of Lincoln, Nebraska and Topeka, Kansas COMBINED! So, I guess I would need proof that a rerouted Empire Builder would carry more passengers on another route than it does on its current route that exceeds all others. And, there is a bit of history behind this, too. One can go all the way back to 1947 when the streamlined version of the Empire Builder was launched and see that rail passenger service on along the ex-GN route (mostly used by today's Empire Builder, too) was superior to that of the NP. That equated to increased ridership throughout the 1950s and 1960s that was one of the reasons that in 1971, the ex-GN route was chosen as the sole remaining route for a Chicago-to-Seattle passenger train at the time of the creation of Amtrak. And as for your point about parallel highway 2: Oh...what is your point? No intercity bus service along its route (except between Cut Bank and Shelby ) all the way from Wenatchee, Washington to Minot, North Dakota. And because of no other transportation (buses are often used for crew deadheading), yes, BNSF does rely on Amtrak for crew movements on this line proportionally more than anywhere else on the system. And, as a native of that area, I can testify to the fact that two-lane US 2 is closed over Marias Pass much more often than is I-90 to the south (and of course, there is more emphasis placed on keeping interstate highways open, as opposed to two-lane roads, such as US 2).

Futuremodal continues:
"4. ....you state lastly, "And, let's not forget the original topic of your post: "How to double capacity of U.S. railroads without even building a single mile of new track". Well, if one of the ways was to eliminate some of the trains (Amtrak) so that others can operate, I for one, hardly consider that as exceptionally creative. Unlike you evidently, I believe we need passenger trains." On that last point, you are correct in my stance. I and most people in this nation do not believe we need passenger trains. If Amtrak were to be discontinued tommorrow, it would not register even a blip on the economy or social well being of the nation outside the NEC. Rather, my position is to take the Amtrak funding and instead of the government running passenger trains, offer that money as a subsidy for private rail passenger ventures for maybe 10 years as seed money, with the Amtrak agency responsible for allowing passenger ventures to take over Amtrak's former access rights. That is the only way to see if there is the possiblity of a private rail passenger service being self sustaining over time. "

Actually, you are incorrect (again) here. Polls routinely state that between 70 and 80 percent of Americans favor a nationwide rail passenger service. Privatizing passenger rail service sounds good to the uninformed, and it's interesting that no other intercity rail passenger service in the world performs without subsidy. Also, expecting it to be self-sustaining ignores that passenger rail has not benefited from the fantastic subsidies received by airlines and highways over the years. As for Amtrak disappearing and not being noticed outside the Northeast Corridor, this is only partially true because America has invested in airways and highways at the expense of railroads for the past 50 years. Just because we chose to ignore this mode of transportation and it is for that reason that it now handles a relatively small portion of intercity travel doesn't mean that it's right that we scrap it all together. Maybe we should right the wrong instead! And, for the record, California and Washington are also heavily dependent on passenger trains, and are hundreds of other communities nationwide facing declining air and bus service...and, perhaps the biggest outcry if intercity trains would be eliminated would be from along the Empire Builder route, where the train is so needed and used. It's no wonder that, on June 11, 2004, when the Empire Builder celebrated its 75th anniversary (the second-longest continuously operated passenger train in America), thousands of people (including Senators, Governors, other elected officials, and the president of Amtrak) turned out at scores of celebrations all along the route to show appreciation for this, the most successful and needed train in America.

Futuremodal continues:
"As for the original topic of this post, my intent was not to be confrontational, but to parlay ideas and see what others could offer regarding capacity improvements sans new trackage. I notice you have not offered any such suggestions."

No, I haven't, nor have I given it any specific thought. But I think it's also important to challenge suggestions like yours that are without merit, such as eliminating Amtrak, or sending it a route that would make the service completely useless. That some freight trains could be rerouted or whatever is always open to speculation. But your numerous posts about the Empire Builder prove that you are completely ignorant about any of the characteristics of the train, and your flippant comments about Amtrak trains running 8-10 hours late "being the norm," and that "so what if it adds 6 to 8 hours to the schedule" really erodes your credibility. I just think that if you're going to propose eliminating a service, you should first know something about it, and you should have stated your desire to eliminate Amtrak right from the start (that would have been the honest thing to do) rather than propose a bunch of bizarre routing changes that would have no benefit.

Futuremodal continues:
"BTW, regarding your Montana Rail Tours conundrum, one of the stated reasons they have cancelled the 2005 season is that they do not have direct access to air passengers, presumably in Spokane. As you know, the company had to terninate their trains in Sandpoint on the west end of MRL tracks. If they could directly access the Spokane terminal, would they have had a better chance of making it? If so, then wouldn't the concept of open access be of benefit to them? Also, should they be entitled to a portion of Amtrak funds?"

This is the first I have heard that the Montana Rail Tours trains were canceled due to lack of access to Spokane and its airport. Such has not been mentioned in their press releases, but only that they seek a larger population base for their service and that costs such as insurance are rising too quickly. In their past season of operation, many of their tours originated in Spokane anyway, with a bus bridge to the train at Sandpoint. If you look at the tours they offer, most of the include large sections of bus operations. For instance, access to Yellowstone and Grand Teton is via bus from Livingston, and of course Glacier National Park (which was also on one or more of their tours) is even further away from the MRL line. Based on this, it just seems unlikely that originating from or terminating in Spokane would be a make-or-break situation for them, since they employ buses freely at other points. And, I don't know if the concept of open access is relevant here. I would have to know the reason that they terminate the trains at Sandpoint. I can't imagine that BNSF would have any particular reason for NOT allowing them to run from Sandpoint to Spokane...if they paid for doing so (after all, MRL crews run Missoula to Spokane now). Perhaps it is the cost of the station facilities in Spokane (their facility in Sandpoint/Kootenai is minimal). I don't know, but would welcome anyone that knows for sure why the service terminated at Sandpoint. As for BNSF, they seem more than happy to run American Orient Express trains (which are run by Amtrak crews) over to the MRL as well as MRL officer specials between Spokane and Sandpoint. And, when the SP&S 700 and SP 4449 ventured to Montana in over the past couple of years to pull special MRT tour trains on the MRL, they ran on BNSF, and I saw nothing to indicate that their was any specific problem with BNSF handling these locomotives. As for Montana Rockies Rail Tours receiving Amtrak funds: No problem, after all, it's not etched in stone that Amtrak has to be the sole provider of intercity passenger service in this country. But if they received money to do so, then they would have to provide true intercity service which they do not do now.

Mark Meyer

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Saturday, December 4, 2004 1:02 PM
QUOTE: Originally posted by PNWRMNM

Dave,

The Ports will support your proposal as a reflex action because they think it is in their interest. Their support tells you nothing of terminal issues. The Ports are not running the terminals.

Somebody in the Port of Tacoma would know the capacity situation in Tacoma since it is their facility on the Muni. BNSF operates SIG in Seattle. Going to Tacoma you have to use the Muni to get to the IM terminal(s). I am not familiar with operational details there but I really doubt that the muni will work for free.

Your answer is long on generalities and short on fact which confirms my point that you do not have the information, data, or facts to support your conclusion that open access is the solution to your problem. You have not convinced me you know what the problem really was.

If you are familiar with railroad's general statements they admit that short haul intermodal does not work for moves of less that 500-800 miles. I believe the reason for that is that it takes that much of the rail's linehaul advantage to overcome the costs of terminals and drays, which are major cost components that the trucker does not have.

The BNSF is not stupid. They would not turn down profitable business, so I can only conclude your move was not profitable regardless of what your third party told you. BNSF is disciplined enough not to do dumb stuff like take business that does not pay.

Mac


Mac, could you contact me via email please? Thanks.
  • Member since
    May 2003
  • From: US
  • 2,593 posts
Posted by PNWRMNM on Saturday, December 4, 2004 12:57 AM
Dave,

The Ports will support your proposal as a reflex action because they think it is in their interest. Their support tells you nothing of terminal issues. The Ports are not running the terminals.

Somebody in the Port of Tacoma would know the capacity situation in Tacoma since it is their facility on the Muni. BNSF operates SIG in Seattle. Going to Tacoma you have to use the Muni to get to the IM terminal(s). I am not familiar with operational details there but I really doubt that the muni will work for free.

Your answer is long on generalities and short on fact which confirms my point that you do not have the information, data, or facts to support your conclusion that open access is the solution to your problem. You have not convinced me you know what the problem really was.

If you are familiar with railroad's general statements they admit that short haul intermodal does not work for moves of less that 500-800 miles. I believe the reason for that is that it takes that much of the rail's linehaul advantage to overcome the costs of terminals and drays, which are major cost components that the trucker does not have.

The BNSF is not stupid. They would not turn down profitable business, so I can only conclude your move was not profitable regardless of what your third party told you. BNSF is disciplined enough not to do dumb stuff like take business that does not pay.

Mac
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, December 3, 2004 1:49 PM
QUOTE: Originally posted by dehusman

Other than possibly Amtrak, I would say that 300+ mile crew districts are certainly no the norm. A closer figure would be 200-250 miles for and interdivisional run.
Dave H.


Dave,

For the record, it is 248 miles by rail from Tacoma to Pasco. If 200-250 is the norm for crew districts, then BNSF's record of needing two crew districts over the Stampede line would suggest underperformance. I will acknowledge that Stampede has 2.2% grades and more curvature than other PNW lines.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, December 3, 2004 1:43 PM
VerM,

1. Why would rerouting Amtrak from Stevens Pass to Stampede Pass require "another set of equipment it doesn't have." You are using the same equipment. You can also separate the Portland leg at Pasco rather than Spokane. Wouldn't the latter free up equipment?

2. You also state, "Also, the problems the UP is having in Portland have nothing to do with capacity along the "I-5"." It is 134 miles from Vancouver to Tacoma. If it is taking 6.5 hours for this run, that's about 20 miles an hour over water level trackage. Clearly, that slow of a transit time suggests congestion on that line. However, you will note that the real congestion for UP is in the Gorge, and the gist of my point is that the Stampede Pass reroute would free up some capacity on this line for Puget Sound bound/origin UP trains. You do give a reluctant aknowledgement of that point. Perhaps a better example is the one pointed out regarding Cajon Pass, where BNSF is exploring adding trackage while the parallel UP line has extra capacity.

3. You also state, "The Empire Builder, as an example, is a small part of the 45 or so trains a day that move on the Hi-Line across Montana, so one would have to wonder whether it's that big of a deal to get rid of it to BNSF (which, as I said earlier, benefits BNSF by providing crew transportation in all weather where there is no parallel public transportation)." Doesn't the Hi-Line parallel U.S. highway 2? If having Amtrak to provide crew transportation is that much of an asset to BNSF, wouldn't BNSF want Amtrak on it's half dozen or so other lines through Montana, Wyoming, the Dakotas? You are mistaking PR for bottom line results. What is really interesting is your opposition to moving the Empire Builder to the I-90 corridor through Montana, which hits most of the population centers in Montana. Wouldn't that increase online ridership? And speaking of Amtrak.....

4. ....you state lastly, "And, let's not forget the original topic of your post: "How to double capacity of U.S. railroads without even building a single mile of new track". Well, if one of the ways was to eliminate some of the trains (Amtrak) so that others can operate, I for one, hardly consider that as exceptionally creative. Unlike you evidently, I believe we need passenger trains." On that last point, you are correct in my stance. I and most people in this nation do not believe we need passenger trains. If Amtrak were to be discontinued tommorrow, it would not register even a blip on the economy or social well being of the nation outside the NEC. Rather, my position is to take the Amtrak funding and instead of the government running passenger trains, offer that money as a subsidy for private rail passenger ventures for maybe 10 years as seed money, with the Amtrak agency responsible for allowing passenger ventures to take over Amtrak's former access rights. That is the only way to see if there is the possiblity of a private rail passenger service being self sustaining over time.

As for the original topic of this post, my intent was not to be confrontational, but to parlay ideas and see what others could offer regarding capacity improvements sans new trackage. I notice you have not offered any such suggestions.

BTW, regarding your Montana Rail Tours conundrum, one of the stated reasons they have cancelled the 2005 season is that they do not have direct access to air passengers, presumably in Spokane. As you know, the company had to terninate their trains in Sandpoint on the west end of MRL tracks. If they could directly access the Spokane terminal, would they have had a better chance of making it? If so, then wouldn't the concept of open access be of benefit to them? Also, should they be entitled to a portion of Amtrak funds?
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Friday, December 3, 2004 12:55 PM
QUOTE: Originally posted by PNWRMNM

Dave,

Clearly the BNSF did not think the traffic was "good money" for them. Your third party logistic outfit probably used some sort of standard cost estimation program. I suspect it grossly underestimated terminal costs, which as I tried to illustrate dominate the economics of this move.

If you were running the terminals at the Port, and were anywhere near capacity, you would sure want to be paid well for your lifts. Remember you are competing for space with transcontinental traffic. Not taking low paying short haul business to keep capacity for the transcontinental traffic makes all kinds of sense to me. When you are capacity constrained, you must be very careful about what business you handle. I suspect that and the drays is what killed your deal, not the line haul costs. How much detail did your logistics outfit share and did you sit in on talks with railroad?

"Thank you" to the several others who corrected your misstatements about crew issues. I could have but wanted to concentrate on more basic issues.

Mac


Mac,

The third part company I refer to also runs other short haul lanes with BNSF. It is shortsighted to say they underestimated terminal costs since they have current experience with those issues. Also, the ports supported the plan so I don't think terminal space was an issue at the time.
  • Member since
    May 2003
  • From: US
  • 2,593 posts
Posted by PNWRMNM on Friday, December 3, 2004 12:38 PM
Dave,

Clearly the BNSF did not think the traffic was "good money" for them. Your third party logistic outfit probably used some sort of standard cost estimation program. I suspect it grossly underestimated terminal costs, which as I tried to illustrate dominate the economics of this move.

If you were running the terminals at the Port, and were anywhere near capacity, you would sure want to be paid well for your lifts. Remember you are competing for space with transcontinental traffic. Not taking low paying short haul business to keep capacity for the transcontinental traffic makes all kinds of sense to me. When you are capacity constrained, you must be very careful about what business you handle. I suspect that and the drays is what killed your deal, not the line haul costs. How much detail did your logistics outfit share and did you sit in on talks with railroad?

"Thank you" to the several others who corrected your misstatements about crew issues. I could have but wanted to concentrate on more basic issues.

Mac
  • Member since
    September 2003
  • From: Omaha, NE
  • 10,621 posts
Posted by dehusman on Friday, December 3, 2004 7:39 AM
Other than possibly Amtrak, I would say that 300+ mile crew districts are certainly no the norm. A closer figure would be 200-250 miles for and interdivisional run.

You seem to be taking the "best case scenario" and assume that is the standard. For example your drive time example. Remember that the crews will be in a commercial van or SUV and will not be "flying" low. The crews will have to come on duty, complete any outstanding paperwork from the previous trip, get paperwork for the current trip, read it, have a job briefing on it, then load their gear into the van. They will spend 45" to an hour on duty before they get in the van, let alone the transit time.

Dave H.

Dave H. Painted side goes up. My website : wnbranch.com

  • Member since
    September 2003
  • From: NotIn, TX
  • 617 posts
Posted by VerMontanan on Friday, December 3, 2004 12:33 AM
Futuremodal states:
"Actually, it is 19 miles from the I-82/395 junction to the McNary bridge, or 21 miles from the McDonalds, and I never went over 85, as I was just going with the traffic flow. And no, I wasn't running a stop watch on myself, just a quick glance at the dashboard clock. I may like to get to where I'm going in good time (one reason I'd never waste my time riding Amtrak), but I'm not reckless."
****
Well, the distances keep changing. I'm not familiar enough to know where the McDonald's is of which you speak, but you did originally stated from Umatilla to Kennewick. The bridge is not the town of Umatilla and the I-82/US-395 junction is about 5 miles out of Kennewick. Now we have the rest of the story, as Paul Harvey would say:

futuremodal continues:
"And for the record, what I said was that one can make it from Hinkle to Pasco in 20 minutes OR SO. For an Amtrak defender, you are sure an ironic stickler for time descriptions."

Well 20 minutes from Hinkle to Pasco OR SO is a lot different than 15 minutes from the McNary bridge to the US395 junction. However, my point was to show that you exaggerated the time to help bolster your claim of a single crew from Tacoma to wherever (in retrospect, since it would require another crew, I don't know what this had to do with it). As for being a stickler for time descriptions, I'll simply reference your previous statements: "So what if it adds 6 to 8 hours to the schedule, people don't ride Amtrak to make good time" and the classic, "Based on the latest news, an 8 to 10 hour delay is the norm for Amtrak" as coming from someone that really can concoct some interesting "time descriptions"!

Mark Meyer

  • Member since
    September 2003
  • From: NotIn, TX
  • 617 posts
Posted by VerMontanan on Friday, December 3, 2004 12:19 AM
Futuremodal states:
"VerM, you miss (I presume purposefully) the whole point. Exaggerations aside, the first question is how far from Tacoma an eastbound could travel before the crew goes dead, that is if the railroad really tried. As I remember from various John Kneiling columns, the old 100 mile crew district went out with the steamers, and crew districts of 300 miles are more the norm. This assumes of course that average speed in practice has also evolved along with the technology. I can see where line congestion can cause average speeds in the teens, but for a line with extra capacity such as the Stampede Pass line this is not an excuse. When BN spent the $100 million OR SO to rehab this line, they did so with the stated purpose of it handling 20 to 30 trains per day. Right now it has 5 OR SO per day. Thus the Stampede Pass line is not going to have the time constraints of the more congested I-5 corridor. It is axiomatic that the more trains you can take off these more congested corridors and reroute to the less congested lines, the more capacity you free up on the more heavily used lines for the higher paying cargos. If UP could reroute trains via Stampede Pass due to open access, then it is certainly a win win fromt the standpoint of UP operations and maximizing utilization of a currently underutilized line. You mention the I-5 time constraints as proof that better times cannot be made on the Stampede Pass line, when in contrast the lack of traffic on Stampede would not force these constraints, so in that vein it is a poor example of counterpoint."

***
Sorry, it is you that missed my point, which is that you simply were labeling something YOU didn't understand as "pathetic". I don't think that's fair. Also, the problems the UP is having in Portland have nothing to do with capacity along the "I-5". As another person stated, the problems are in terminals, and that's where the UP is burning their time, and it's before they even get on the joint track with BNSF. True, 100-mile crew districts are no longer the norm, and I'm not advocating it....just explaining why BNSF does it the way they do. As for what the UP could do, that's another issue, but I just wonder how receptive BNSF would be to allowing UP trains to run on a district where trains would require relief crews 100 percent of the time. After all, a crew change is a crew change, and as someone who as managed crews, there are advantages to crew districts where trains are not constantly up against the hours of service every trip. And since 100 percent of these trains (under your plan) would expire their hours of service prior to arriving Hinkle, I guess if I was BNSF I'd wonder if UP would have relief crews always available because they don't now most places on their system. Or, perhaps you're advocating not having fixed crew change points. It's an interesting concept, but relief crews have to based somewhere.

futuremodal continues:
"Okay, so let's take your position that UP can't run this route without establishing a new crew district somewhere along the line, even though it is only 247 miles by rail from Tacoma to Kennewick. Is the cost of this new crew district going to outweigh the benefits of opening up capacity on the Gorge and I-5 lines? We know that UP has has to turn away business to avoid a meltdown. Wouldn't it be a net gain if UP could retain this business without going into meltdown?"
**
Absolutely. I'm not saying that the UP shouldn't use the line. Just pointing out that there is more to doing so than you pointed out in some of your posts (like that BNSF crews are turning back from Ellensburg, or that they're taking 12 hours to get there).

futuremodal continues:
"As for rerouting Amtrak, as you must be aware the BNSF has tried to get Amtrak off the Stevens Pass route onto Stampede and the ex-NP line. Why would they propose this other than to free up capacity on the Stevens Pass line? Apparently, it is important."
***
This is old news, and only a rumor from 2001. I challenge you to produce any documentation that BNSF actively persued this, especially in light of the fact that it would cost millions of dollars in track improvements to implement. It would also cost Amtrak another set of equipment it doesn't have. As a matter of FACT, BNSF is working with Amtrak and the Washington DOT to establish yet another stop for the Empire Builder on the Stevens Pass line at Leavenworth, planned to start in 2005. Why are they going to allow this? As anyone from the Washington DOT can tell you, a reroute is beyond a dead issue.

futuremodal continues:
"As for rerouting the Empire Builder via MRL through Montana and the ex-Milwaukee through South Dakota (a line that only hosts a few coal trains now and then), it is a similar situation, as there are fewer trains on the ex-NP line than the High Line. So what if it adds 6 to 8 hours to the schedule, people don't ride Amtrak to make good time."
***
Well, the Milwaukee line is largely unsignalled now, so that would add a lot more than 6 to 8 hours (at 45 MPH maximum), and you still don't address the question of how Amtrak is going to come up with the equipment for these trains on severely lengthened schedules. Please tell us.

And, for the record, the Milwaukee line across South Dakota does NOT "ONLY host a few coal trains now and then." This line has been busy for over a year with grain trains, which are being moved in record numbers on BNSF, and South Dakota probably has more 110-car unit facilites than any other state served by BNSF. The ex-MILW line west from Aberdeen is the main route for westbound trains out of the state, and there is also a fair amount of east grain moved. Grain traffic on the line averages six trains daily, so your statement about ONLY coal is highly inaccurate.

futuremodal continues:
Based on the latest news, an 8 to 10 hour delay is the norm for Amtrak, the only diffence with the I-90 corridor reroute is that the delay is built into the schedule. "
***
Based on WHAT latest news? Other than the Sunset Limited, name other Amtrak trains that consistently operate this late. And the Empire Builder isn't one of them. Through 2004, it had the best on time performance of any long distance passenger train. This is definitely a flippant, unsupportable statement.

futuremodal continues:
"If that time delay is to egregious, we can go one step further and just eliminate Amtrak altogether. Don't you think the railroads would be in favor of that? If so, why? Is it not to free up the lines for the freights?
***
Well, certainly the effect of your proposals would kill Amtrak, and I'm surprised that you just didn't state that right from the beginning. The railroads might like to get rid of Amtrak, but I sense that you think that to be a fact, and that's just not true. First of all, if it was, BNSF would treat Amtrak the way CSX treats Amtrak. BNSF treats it like the customer it is and reaps several million dollars a year in incentive benefits. The Empire Builder, as an example, is a small part of the 45 or so trains a day that move on the Hi-Line across Montana, so one would have to wonder whether it's that big of a deal to get rid of it to BNSF (which, as I said earlier, benefits BNSF by providing crew transportation in all weather where there is no parallel public transportation). Also, as a matter of FACT, BNSF's official position is that they prefer to deal with Amtrak rather than various state entities that may impose rail passenger service on their lines (which they can and have done). That's why in California and Washington, for instance, BNSF has embraced expanded intercity and commuter rail service to benefit from the infrastructure improvements that actually increase capacity. In this case, having Amtrak around has been a big boost to BNSF handling more traffic in the area.

And, let's not forget the original topic of your post: "How to double capacity of U.S. railroads without even building a single mile of new track". Well, if one of the ways was to eliminate some of the trains (Amtrak) so that others can operate, I for one, hardly consider that as exceptionally creative. Unlike you evidently, I believe we need passenger trains.

Mark Meyer

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, December 2, 2004 11:01 PM
QUOTE: Originally posted by VerMontanan



futuremodal continues:
"And just for the record, I have driven from Kennewick to Umatilla in under 15 minutes."
**
Glad I wasn't along. The Rand McNally atlas shows the distance as 28 miles. And since you did it in less than 15 minutes, that's in excess of 112 MPH. Though, I don't see your point in mentioning this as your original claim was driving Hinkle to Pasco in 20 minutes, and Hinkle's another 7 or so miles beyond Umatilla.



Actually, it is 19 miles from the I-82/395 junction to the McNary bridge, or 21 miles from the McDonalds, and I never went over 85, as I was just going with the traffic flow. And no, I wasn't running a stop watch on myself, just a quick glance at the dashboard clock. I may like to get to where I'm going in good time (one reason I'd never waste my time riding Amtrak), but I'm not reckless.

And for the record, what I said was that one can make it from Hinkle to Pasco in 20 minutes OR SO. For an Amtrak defender, you are sure an ironic stickler for time descriptions.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, December 2, 2004 10:44 PM
VerM, you miss (I presume purposefully) the whole point. Exaggerations aside, the first question is how far from Tacoma an eastbound could travel before the crew goes dead, that is if the railroad really tried. As I remember from various John Kneiling columns, the old 100 mile crew district went out with the steamers, and crew districts of 300 miles are more the norm. This assumes of course that average speed in practice has also evolved along with the technology. I can see where line congestion can cause average speeds in the teens, but for a line with extra capacity such as the Stampede Pass line this is not an excuse. When BN spent the $100 million OR SO to rehab this line, they did so with the stated purpose of it handling 20 to 30 trains per day. Right now it has 5 OR SO per day. Thus the Stampede Pass line is not going to have the time constraints of the more congested I-5 corridor. It is axiomatic that the more trains you can take off these more congested corridors and reroute to the less congested lines, the more capacity you free up on the more heavily used lines for the higher paying cargos. If UP could reroute trains via Stampede Pass due to open access, then it is certainly a win win fromt the standpoint of UP operations and maximizing utilization of a currently underutilized line. You mention the I-5 time constraints as proof that better times cannot be made on the Stampede Pass line, when in contrast the lack of traffic on Stampede would not force these constraints, so in that vein it is a poor example of counterpoint.

Okay, so let's take your position that UP can't run this route without establishing a new crew district somewhere along the line, even though it is only 247 miles by rail from Tacoma to Kennewick. Is the cost of this new crew district going to outweigh the benefits of opening up capacity on the Gorge and I-5 lines? We know that UP has has to turn away business to avoid a meltdown. Wouldn't it be a net gain if UP could retain this business without going into meltdown?

As for rerouting Amtrak, as you must be aware the BNSF has tried to get Amtrak off the Stevens Pass route onto Stampede and the ex-NP line. Why would they propose this other than to free up capacity on the Stevens Pass line? Apparently, it is important. As for rerouting the Empire Builder via MRL through Montana and the ex-Milwaukee through South Dakota (a line that only hosts a few coal trains now and then), it is a similar situation, as there are fewer trains on the ex-NP line than the High Line. So what if it adds 6 to 8 hours to the schedule, people don't ride Amtrak to make good time. Based on the latest news, an 8 to 10 hour delay is the norm for Amtrak, the only diffence with the I-90 corridor reroute is that the delay is built into the schedule. If that time delay is to egregious, we can go one step further and just eliminate Amtrak altogether. Don't you think the railroads would be in favor of that? If so, why? Is it not to free up the lines for the freights?
  • Member since
    September 2003
  • From: NotIn, TX
  • 617 posts
Posted by VerMontanan on Thursday, December 2, 2004 10:02 PM
futuremodal stated:
"Thanks for the clarification. It is 121 miles by rail from Tacoma to Ellensburg, which means either trains are averaging 10 miles an hour over this route, or crews are running round trip Tacoma-Ellensburg-Tacoma (and Pasco-Ellensburg-Pasco). If it's 10 mph, that is just pathetic, especally since eastbound grain trains out of Tacoma are empties, and fewer than 5 or 6 trains a day are currently using the line. For crying out loud, I know people that commute round trip daily from Ellensburg to Seattle to work!"

**Actually what is occuring is none of the scenarios you obviously claim to know about. No, the crews aren't taking 12 hours to go the distance, but they're not running from Tacoma to Ellensburg and back again, either. First of all, most trains are on duty about 8 to 10 hours, but that's because the crew sometimes will take their train to Auburn for inspection first prior to departing, or will be delayed waiting for the train to be inspected at Tacoma, which they just started doing. In any event, the crew is on duty several hours prior to departure, so couple that with transit time, and they really don't have enough time to handle another train back to Seattle (the westbounds, both of them, go to Interbay); and, a short-time westbound train is not desirable between Easton and Kanaskat because it is totally inaccessable to a relief crew (should the need arise) in an automobile. That's the main reason they don't aggregate back. That there is more to this is much different than simply labeling it "pathetic."

futuremodal continues:
"If Pasco (or more likely Kennewick ) is too far for a Tacoma origin UP empty to travel in one crew time slot, they could always try for Kiona or Prosser and still shuttle crews from Hinkle. The point is UP could run trains eastbound over the Stampede Pass line without the cost of having to establish a new crew district, and this move would relieve some congestion on UP's Columbia Gorge line, which is the gist of this thread e.g. relieving capacity constraints sans new track construction."

**
Well, would not Kiona or Kennewick to Hinkle be another crew district anyway? What you're really proposing is that while you don't want to call it a crew district, that the crews just be sent as far as they can go from Tacoma. Not a good plan. Besides, your optimism seems to dismiss that the UP crews would undergo a similar type of initial terminal delay departing Tacoma. Right now, BNSF is requiring northbound UP trains on duty at Portland to have at least 6.5 hours to work before they will allow them on their track at North Portland Jct. for the run to Tacoma/Reservation (yes they often arrive that short on time, just miles from the intitial terminal), so their track record initial terminal delay in the Northwest has not been great.

futuremodal continues:
"And just for the record, I have driven from Kennewick to Umatilla in under 15 minutes."
**
Glad I wasn't along. The Rand McNally atlas shows the distance as 28 miles. And since you did it in less than 15 minutes, that's in excess of 112 MPH. Though, I don't see your point in mentioning this as your original claim was driving Hinkle to Pasco in 20 minutes, and Hinkle's another 7 or so miles beyond Umatilla.



Mark Meyer

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, December 2, 2004 3:41 PM
QUOTE: Originally posted by VerMontanan

Futuremodal stated:

"My understanding of BNSF operations in the PNW is that they do route empty grain shuttles back over Stampede, and (correct me if I'm wrong) I believe they do manage to run from Tacoma to Pasco in one trip. For UP to shuttle a crew between Hinkle and Pasco would only take 20 minutes or so, so there would be no need for increasing crew costs."

You are wrong. Train crews run from Seattle or Tacoma only to Ellensburg where crews are changed for the run to Pasco. As for the UP to drive a crew from Hinkle to Pasco in 20 minutes: Unlikely, since it's 35 miles one way.



Thanks for the clarification. It is 121 miles by rail from Tacoma to Ellensburg, which means either trains are averaging 10 miles an hour over this route, or crews are running round trip Tacoma-Ellensburg-Tacoma (and Pasco-Ellensburg-Pasco). If it's 10 mph, that is just pathetic, especally since eastbound grain trains out of Tacoma are empties, and fewer than 5 or 6 trains a day are currently using the line. For crying out loud, I know people that commute round trip daily from Ellensburg to Seattle to work!

If Pasco (or more likely Kennewick ) is too far for a Tacoma origin UP empty to travel in one crew time slot, they could always try for Kiona or Prosser and still shuttle crews from Hinkle. The point is UP could run trains eastbound over the Stampede Pass line without the cost of having to establish a new crew district, and this move would relieve some congestion on UP's Columbia Gorge line, which is the gist of this thread e.g. relieving capacity constraints sans new track construction.

And just for the record, I have driven from Kennewick to Umatilla in under 15 minutes.
  • Member since
    September 2003
  • From: NotIn, TX
  • 617 posts
Posted by VerMontanan on Thursday, December 2, 2004 3:31 PM
Futuremodal stated:

"5. Reroute Amtrak off high density corridors onto lower traffic lines. There are examples of routes where Amtrak runs over heavily used freight lines while parrellel lines with less traffic are available. Take Amtrak off BNSF's High Line and put it on the ex-NP (nee MRL) line through central Monana and North Dakota. Take Amrak off the ex-Santa Fe LA to Chicago line and reroute it to the ex-RI/SSW/SP line. This may increase the travel time for Amtrak passengers and deprive some towns of rail passenger service, but Harve and Minot's loss is Bozeman and Bismark's gain. It would certainly help clear up the heaviest used freight lines."

A couple of points here:

The proposal Amtrak off the ex-ATSF line to the UP (ex-CRIP/SP) line shows that the gentleman stating this is unaware of the fantastic delays that have occurred to Amtrak's Sunset Limited over the past year on the former SP line west of El Paso. Certainly, there is no capacity there to handle another Amtrak train, so his proposal is a "lose/lose" scenario.

As for rerouting the Empire Builder, there are many reasons this proposal is simplistic:
1.)The train is Amtrak's most successful train in terms of ridership, on time performance, and public utility(serving many areas without other public transportation). It should not be rerouted for alleged capacity issues.
2.)Rerouting the train via the ex-NP line would require 6 to 8 hours more running time than is currently the case. Considering the Empire Builder's turnaround time for equipment in Seattle and Portland is only about 6 hours now (the least of any long distance Amtrak train), doing this would mean having to create another entire set of equipment just for this reason. Of course, anyone that knows anything about Amtrak's equipment availability lately knows this isn't going to happen.
3.)Being very familiar with the operation of the Empire Builder along BNSF, I would like any evidence that it is hindering capacity of the route. Actually, the train is beneficial to BNSF as it is the primary method of deadheading crews on a route with little or no other public transportation to assist in crew movements.
4.)The ex-NP route east of Billings, Montana does not have any extra capacity, due to the large volume of coal on a line that has areas of inadequate siding length and very little CTC.

Mark Meyer

  • Member since
    September 2003
  • From: NotIn, TX
  • 617 posts
Posted by VerMontanan on Thursday, December 2, 2004 3:15 PM
Futuremodal stated:

"My understanding of BNSF operations in the PNW is that they do route empty grain shuttles back over Stampede, and (correct me if I'm wrong) I believe they do manage to run from Tacoma to Pasco in one trip. For UP to shuttle a crew between Hinkle and Pasco would only take 20 minutes or so, so there would be no need for increasing crew costs."

You are wrong. Train crews run from Seattle or Tacoma only to Ellensburg where crews are changed for the run to Pasco. As for the UP to drive a crew from Hinkle to Pasco in 20 minutes: Unlikely, since it's 35 miles one way.

Mark Meyer

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, December 2, 2004 1:29 PM
QUOTE: Originally posted by PNWRMNM

Dave,

Had to attend to life for a couple of days so could not respond to yours of 29th until now. As I read that post you conclude that BNSF wants an exhorbitant rate over Stampede Pass because you could not get a low enough rate to do intermodal from Yakima to the ports of Seattle and Tacoma. I do not think the facts support your conclusion, and here is why.

I assume you are looking at import-export traffic, which would be mostly export from Yakima. That is a one way load. Yakima to Seattle and Tacoma is about 150 one way highway miles, 300 round trip. I suspect truckers would do this move for $1.25 per mile or $375 per round trip. You have to offer shippers two discounts, one for slower service, and one to use you versus somebody else. I can not imagine that less than 20% would do it, so your maximum rate becomes $300 per box round trip.

You have two drays, one at the port and one in Yakima. If you got them for $75 each, round trip I would be surprised. That is $150 per box.

Terminals are not free either. If you gould get on and off for $50 per lift you have $200 in terminal costs. Considering there is no terminal in Yakima, I guess you figured to build your own and recover the operating and capital costs at $100 per box. If so, you are a braver man than I.

The problem is we are to $350 in costs before we get to linehaul issues. There are some minor complications here. First you have to use single stack equipment because double will not fit thru
Stampede. That makes your business a lot less attractive in the terminals at Seattle and Tacoma because your equipment takes twice as much track space as double stack equipment.

Another issue is that your traffic is split between the ports so you go to them on differend days or have two small blocks each day.

How you would get to the intermodal terminals is also a puzzle as the trains now being operated do not go to SIG nor the Tacoma dock yards which are on the Muni. Implies either very small, hence expensive, dedicated trains or set out blocks and a lot of switch engine hours to get from the setout points to the intermodal yards. Switching to and from the dock yards adds cost, transit time and unreliability to your system.

My point is that even if BNSF was willing to do the linehaul for free, the teminal costs and issues kill you. Open access is not the solution to your problem. BNSF was simply smart enough not do do something that does not make economic sense.

Mac


Mac,

All I can tell you is the 3PL that I was working with came up with a per box price that beat the current trucking rate, paid the equipment lease rate, and still made good money for BNSF, well over and above the cost of a crew, locomotives, etc. Don't forget, the trucking outfits are looking for ways to move their loads in a constant climate of driver shortages. Anytime someone comes up with a way to take trucks off the roads to their benefit, they are more than willing to participate. The technology we were using was a combination of spine cars and RailRunner bi-modal chassis. We also were going to use DPU's to max up the number of boxes to up to 175 per trip. The use of bimodal and spine cars allowed us to access rail on dock facilities, cutting back on demurage costs.

The point is, if a 3PL was willing to take this risk, then it is apparent that if we had open access the project would have gone forward. But because of BNSF's unwillingness to try out this project because they did not have the patience to work out the kinks, that was the turning point in my former opposition to open access. I firmly believe the current monopoly climate in the rail industry is the cause of this lack of aggresiveness and innovation, and only some action that forces competitiveness onto the rail industry will break this attitude.

Maybe it's time the feds started taxing railroads every time trucks are forced onto the highways when they don't want to be bothered with business opportunities or when they decide to abandon more trackage. I don't know. But the current railroad monopoly climate is keeping the nation from maximizing the opportunities to take trucks off the highways. If you have a better solution than open access for maximizing the use of non-highway movement of trucks, I'm all ears.
  • Member since
    May 2003
  • From: US
  • 2,593 posts
Posted by PNWRMNM on Thursday, December 2, 2004 12:57 PM
Dave,

Had to attend to life for a couple of days so could not respond to yours of 29th until now. As I read that post you conclude that BNSF wants an exhorbitant rate over Stampede Pass because you could not get a low enough rate to do intermodal from Yakima to the ports of Seattle and Tacoma. I do not think the facts support your conclusion, and here is why.

I assume you are looking at import-export traffic, which would be mostly export from Yakima. That is a one way load. Yakima to Seattle and Tacoma is about 150 one way highway miles, 300 round trip. I suspect truckers would do this move for $1.25 per mile or $375 per round trip. You have to offer shippers two discounts, one for slower service, and one to use you versus somebody else. I can not imagine that less than 20% would do it, so your maximum rate becomes $300 per box round trip.

You have two drays, one at the port and one in Yakima. If you got them for $75 each, round trip I would be surprised. That is $150 per box.

Terminals are not free either. If you gould get on and off for $50 per lift you have $200 in terminal costs. Considering there is no terminal in Yakima, I guess you figured to build your own and recover the operating and capital costs at $100 per box. If so, you are a braver man than I.

The problem is we are to $350 in costs before we get to linehaul issues. There are some minor complications here. First you have to use single stack equipment because double will not fit thru
Stampede. That makes your business a lot less attractive in the terminals at Seattle and Tacoma because your equipment takes twice as much track space as double stack equipment.

Another issue is that your traffic is split between the ports so you go to them on differend days or have two small blocks each day.

How you would get to the intermodal terminals is also a puzzle as the trains now being operated do not go to SIG nor the Tacoma dock yards which are on the Muni. Implies either very small, hence expensive, dedicated trains or set out blocks and a lot of switch engine hours to get from the setout points to the intermodal yards. Switching to and from the dock yards adds cost, transit time and unreliability to your system.

My point is that even if BNSF was willing to do the linehaul for free, the teminal costs and issues kill you. Open access is not the solution to your problem. BNSF was simply smart enough not do do something that does not make economic sense.

Mac
  • Member since
    August 2003
  • From: Near Promentory UT
  • 1,590 posts
Posted by dldance on Thursday, December 2, 2004 8:29 AM
I have lurked on this thread for sometime but feel I need to raise a point that has only been lightly mentioned. The true capacity bottlenecks in our transportation system today (rail, highway, and air) are the terminals. None of these suggestions do much to much to address that issue. If you can't get the containers out of LA/Long Beach ports, it doesn;t matter if you have 4 tracks over Cajon. If you can't get them into Chicago, double tracking Abo canyon doesn't gain much (well it does provide more places to park blocked trains - but I don't think that's the point.)

Further, the bulk of the tonnage today is in unit trains -- coal, grain, autoracks, and chemicals. These very interesting suggestions do not address these very significant components in the capacity equation.

Respectfully,

dd
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, December 2, 2004 8:14 AM
IMHO open access could lead to something similar to the airlines after deregulation. A massive Class I price war at the first business downturn, regionals and startups with less debt and better labor agreements cherry-picking business, potential United Airlines style bankruptcies(CSX???) . It would be good for shippers and ultimately competition, but getting there could be pretty painfull and expensive and I really don't see it increasing capacity on the lines that have the most problems. Another issue not mentioned in relation to subsidies is they get cut when budgets are tight. The Interstates which the public see's are in need of pretty massive infrastructure improvement as a result of defered maintenance. Rail would fare even worse.

An alternative I've been thinking about addresses a number of issues raised recently and I'm sure creates others I haven't considered, so fire away. This wouldn't double capacity by any stretch, but it would increase it significantly.

Modern locos are more fuel-efficient and reliable than ever before. I'd use the savings to increase average train speeds by ~10 mph. Aside from just running them faster, I'd look at eliminating or automating un-necessary FRA-mandated stops and inspections that don't compromise safety. If fueling is an issue, I'd use auxiliary fuel tenders(didn't BN do this on the northern transcom at one time?). Some trains may have to be shorter, others may need more power. Double track in critical locations would also cut delays and the extra expense would be partially offset by longer rail life since tonnage is split over 2 tracks instead of one.

Increasing train speeds allows the same miles in less time, so I'd put most of the train crews on a 12 hour on/12 off arrangement, leaving most of the crew change locations the same. This still isn't a regular 9-5 type work day, but it's better than what crews have now. The railraods get greater productivity and should be able to attract new hires. The railroaders don't have to take a massive pay cut.

In terminals, particularly Intermodal, I'd speed up the loading/unloading process. In some places this might be as simple as more Mijack cranes, but I'd look to automate the process in larger terminals. With standard sized containers, ship to train should be possible with laser reflective reference markings on the ship, containers, and rail cars so the crane's computer would know exactly what's where. For train to truck transfers, a car-wash like guideway could be used to accurately position the trucks. Industrial robots do all kinds of precision laser guided operations on automated manufacturing lines, automated container transfers shouldn't be that difficult.

Faster speed and efficiency should allow greater pricing power for some of the traffic and allow the railroads to go after new business they can't get now.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Wednesday, December 1, 2004 10:23 PM
Rob,

Without giving away confidential information, all I can add is that any logistical technician will look for ways to improve the supply chain. Don't forget, what works over here (moving 40' boxes 100 miles inland away from congested ports for transloading into larger boxes) can work in reverse overseas.

Also, if you will notice, the 53' boxes made by Jindo are of the same corrugated side construction as your standard 40' boxes. Indeed they are built for stacking multiple units. This is already done on container on barge service between Alaska and Puget Sound. It will work. Whether Stoughton's new boxes can handle multiple stacking heights remains to be seen. I have contacted them for an answer and have not received a reply, so possibly even they don't know. Probably their new design was only meant for nothing more than double stacking.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Wednesday, December 1, 2004 10:16 PM
QUOTE: Originally posted by arbfbe

So please explain how your idea of 'open access' differs from the current rules of interchange. How will this 'open access' increase capacity and make it better for a) the railroads and b) the shippers.

I am not sure your idea of stacking yet another loaded container over a shared truck of a stack car will not lead to overloading of the weight limits of that truck. Those 20' boxes can get really heavy. I see a problem in trying to load it on the intermediate platform if the wells on both sides are designated to have both a lower 48' box and an upper 53' box loaded.


Regarding open access, it has been deceminated quite well in this thread, but to recap: Current rules of interchange allow for certain anti-competitive auspices such as bottleneck rate gouging, paper barriers for shortlines which could in theory interchange with more than one Class I, limiting operators allowed on underutilized proprietary trackage when logic dictates that allowing other operators would maximize utilization, et al.

Regarding the Stack n' Half, it is similar to drawbar connected well cars which have 70 ton trucks on both ends, these cars have a net carrying capacity of 160,000 lbs cargo. What I did was replace the interior 70 ton trucks with 100 ton trucks to allow an additional 70,000 lbs cargo over the mini-spine. Do the math and you'll see it all fits together quite nicely.
  • Member since
    October 2004
  • 31 posts
Posted by rob_l on Wednesday, December 1, 2004 1:24 PM
Futuremodal said:

"My understanding is that the 53's are not ISO certified for international transport, that is the main roadblock to trying this idea. Yes, many Asian ports lack warehousing space, but there are some which do have that kind of space and thus ideal for a real world tryout of transporting 53's should ISO certification come into fruition."

I submit that there are no Asian ports which have that kind of space. And I submit that it is pointless to work on ISO certification of 53s when there are so few places overseas that you can take them. If they were useful in that regard, certification would have happened a long time ago.

Futuremodal continued:

"Even with the one to two weeks time delay from Asia to the U.S., you are still in better position to respond to inventory changes if you are transporting in 53's vs 40's on the ocean leg. There would be a significant time savings using 53's vs 40's on the transload from ship to railcar, and if it became apparent that some cargo redistribution became necessary due to inventory changes it is easier to transload from a 53' to another 53'."

Each transload event is $100+ per box plus dray charges, say, $200 US port-to-warehouse-to-rail terminal or Asian port-to-warehouse-to-Asian port.

It pays to re-load in 53s given you operate a distribution warehouse near the US port. (It even pays to move your warehouse from an inland US point to a point near the US port, if most of your goods come from Asia and if they come from various suppliers in different containers.) It doesn't pay to transload to a bigger box if the entire box contents are going to one place inland in the US. And it certainly doesn't pay to transload to a 53 near an Asian port given the box is only going as far as a warehouse near the US port.

Best regards,

Rob L.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Wednesday, December 1, 2004 12:13 PM
QUOTE: Originally posted by GMS-AU


The other point of reducing axle weights yet putting more axles on the rail via 6 and eight axle wagons. Its all weight the loco's have to pull and that cost's money.


G M Simpson


GM,

What adding more axles under a railcar (or a truck trailer for that matter) does is to increase the overall load factor while still minimizing wear and tear on the tracks (or the road). Adding more axles allows higher net cargo weights to be hauled per car, thus your ratio of cargo weight to tare weight is improved, and the resultant savings usually shows up on the bottom line.

As for what is the optimal max weight per axle, some studies have suggested that a max weight of 71,500 lbs per axle (e.g. 286,000 lbs per four axle car) gives the best results. Simply allowing more weight per axle such as the proposed 78,750 lb per axle/315,000 lbs per four axle car standard may result in the law of diminishing returns kicking in, e.g. the increase in wear and tear on the trackage would result in a greater cost than the savings of the increased load factor. I would suggest that a fail safe per axle weight should be more in the 65,000 lb per axle range, since most studies on axle weights don't take into account the frequency of flat spots on wheels and/or deferred maintenance, and other such intangibles.
  • Member since
    February 2002
  • 910 posts
Posted by arbfbe on Wednesday, December 1, 2004 12:06 PM
So please explain how your idea of 'open access' differs from the current rules of interchange. How will this 'open access' increase capacity and make it better for a) the railroads and b) the shippers.

I am not sure your idea of stacking yet another loaded container over a shared truck of a stack car will not lead to overloading of the weight limits of that truck. Those 20' boxes can get really heavy. I see a problem in trying to load it on the intermediate platform if the wells on both sides are designated to have both a lower 48' box and an upper 53' box loaded.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Wednesday, December 1, 2004 12:03 PM
Rob,

My understanding is that the 53's are not ISO certified for international transport, that is the main roadblock to trying this idea. Yes, many Asian ports lack warehousing space, but there are some which do have that kind of space and thus ideal for a real world tryout of transporting 53's should ISO certification come into fruition.

Even with the one to two weeks time delay from Asia to the U.S., you are still in better position to respond to inventory changes if you are transporting in 53's vs 40's on the ocean leg. There would be a significant time savings using 53's vs 40's on the transload from ship to railcar, and if it became apparent that some cargo redistribution became necessary due to inventory changes it is easier to transload from a 53' to another 53'.
  • Member since
    October 2004
  • 31 posts
Posted by rob_l on Wednesday, December 1, 2004 11:31 AM
QUOTE: Originally posted by M.W. Hemphill

No trouble is gone to, G.M. Have you seen what U.S. wages consist of? Think of the repack center as a hump yard for toys, clothes, and consumer electronic goods. The major reason containers are repacked stateside is to take solid containerloads of one commodity and distribute those contents among dozens of containerloads of mixed commodities. Those containers can then move straight to the retail store dock or to a local distribution center, rather than to a regional distribution center inland that would do the exact same thing! (Moreover, it greatly increases the rail share of the haul.) It's a very intelligent relocation of the distribution center as far upstream as possible, to eliminate duplicate mileage as you move the goods to a distribution center inland, sort to the final destination, then move back over some of the same route to final destination. Since there is no land west of Los Angeles, only ocean, that's the logical place to put the repack center. You'd still have the repack centers even if the 53' container didn't exist. But since they do, why repack into a smaller container than necessary?



That is the reason it is done in So Cal rather than inland USA. The reason it is done in So Cal rather than in Asia is because Asia is another 1-2 weeks away from the retail stores in the USA. Which means the accuracy of forecasting sales is much worse. In order to sustain the same retail sales, I calculate a Wal-Mart would require a 20% increase in the inventories in its US retail stores if they moved their distribution centers from the vicinity of US Ports to Asia. Even if labor in Asia were totally free, it would be a disastrous move for them. Moving their distribution centers from inland US locations to locations near the US ports saved them a lot of money, but moving them to Asia would lose them a lot of money.

The other issue: There is no space at ports for large-scale transloading operations. Not at US ports, and especially not an Asian ports. All the new distribution centers are built 50-100 miles away from the ports, that is the closest place you can find the space to do it. So even for traffic where no distribution/sorting en route is involved (a rare thing anyway), transloading to North American-sized boxes just ain't gonna' happen in Asia.

So futuremodal, don't get your hopes up, transloading to 53s and related distribution operations to re-pack containers for US store destinations ain't gonna' move to Asia. Like I said, the interchange between international containers and domestic transportation vehicles near our ports is something we have to learn to live with and something we have to learn to make efficient. The economics are just too compelling to do otherwise.

Best regards,

Rob L.
  • Member since
    May 2004
  • From: Australia
  • 56 posts
Posted by GMS-AU on Wednesday, December 1, 2004 8:30 AM
A quick note, some of those 53' and 45' make it to Australia. Trucks have been modified to accommodate this. One thing not mentioned here is if you have bigger and bigger containers what about weight. Ok if you are handling plastic toys or the like but when the cargo gets heavier like power tools and other metals or even kilnware then you will find the box is only half full but max on weight. Or the other problem is in foreign ports weight is not considered and the container is overloaded and when reaching a new port it has to be unloaded anyway. I find it amazing that you would go to the trouble of unpacking a 20' or 40 ' to load into a 53'. Well cars can take two 20's on the bottom and what ever on the top. Are standard containers that frowned upon in the US?

The other point of reducing axle weights yet putting more axles on the rail via 6 and eight axle wagons. Its all weight the loco's have to pull and that cost's money.

Finally, on open access, is it possible for a third party to build or own a track and charge others to use it. Say an infrastructure company decided to build another route out of LA and connected with BNSF and UP, then either could use it when it wants to or anybody else for that matter. Has this ever been looked at? A cheaper option would be buying and abandoned line although most Roads wouldn't abandon it unless it was really redundant. Or is it more like " I don't need it but I'm sure as hell not let anybody else have it! "

G M Simpson
There is no replacement for displacement!

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy