Boy are you ever out of the loop. (bad Chicago pun intended)
(1) As we speak, NS and CSX are reworking the connections in Chicago to accomodate a bypass at the Gary Airport to extend the airport runways. Major activity at Tolleston, Clarke Junction/CP-501 and Gary/Millers*. (CSX/NYC Porter Sub to NS/WAB Gary Sub)- they've been at this for 3+ years
IHB/G&W Dune Park Branch is dead and gone - Abandoned officially after IHB gave up on it. (Still technically owned by PC Estate)....CSX just removed the IHB (G&W) bridge at Tolleston in December. Indiana DOT and Gary have made a mess of things for the railroads. InDOT should have been shot for killing off the PRR Ft Wayne main in the 1970's (they even botched the ICC abandonment - typical clueless highway administrators, complete with a collapsing bridge)
I've missed what's going on at Millers (or Miller or Miller Beach, depending). Help?
Carl
Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)
CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)
A couple of thing. 1st the NS has trackage rights over CSX from Porter to the IHB connectoin at Ivanhoe, and uses them. It still crosses the CSX at grade at Willow Creek. 2nd, the IHB does not own the railroad from Blue Island to McCook. It is owned and maintained by the B&OCT. It is a very congested piece of railroad between Blue Island Jct and 71st. It is one of CSX's UPS routes into and out of Chicago. CSX is not going to permit additional connections to be built that would in turn impact its UPS traffic.
An "expensive model collector"
The actual point where ownership changes is known in the timetables as Superior, which is in the village of McCook, but is not the McCook crossing, as some might assume. This explains why a friend of mine, then a Chessie employee inspecting track on the B&OCT, was chased away from Pielet Brothers by guard dogs 'way back when.What's even more intriguing is that B&OCT was involved in a plan to extend the IHB beyond Franklin Park northeastward toward Mayfair, to interchange with the northern lines of CNW and MILW. I can't remember whether the line was actually built or not, but it was shown on some maps, and grading was at least partially completed (a diagonal street known as Forest Preserve Drive covers about three miles of the intended route). This was B&OCT...I can find nothing connecting IHB to the venture.
IHB was part owned by MILW if that qualifies as a connection (never a a major owner, but).....was supposed to be part of Il-fated Chicago Milwaukee & Gary loop. (some survived as MILW's Joliet Branch)
Millers on WAB falls between Aetna and Gary, just 200 yards west of where the G&W's Dune Park Br. crossed over Wabash....not the same as CSS-Miller or B&O Miller which are about 1-2 miles east.
Half of the B&OCT R/W was owned and used by PRR predecessor SC&S (nominally the south main track) to get to various refineries. Through a confusing series of exchanges w/ B&OCT starting in 1913, B&O took control of the R/W. However, PRR still had rights on the B&OCT from Pine to Clark and on to the west. What is confusing (to me) is why and how PC/CR quit using the line. There is no docket to cover at the federal level (just like the issue with the PRR main from Clark to Whiting condemned by InDOT in 1978)
Carl: Gary to Millers connection all happens in a box confined between Massachusetts to Virginia, 9th[WAB] to 11th[NYC] ...NS bulldozed the foundation of the old Millers depot just north of the sugar packaging plant (Indiana Sugars) at 9th & Virginia and blew a giant hole in the IHB/Gary & Western Dune Park Branch elevated fill. (only time I walked a main track with a machete and bank blade and still couldn't walk between the rails in places - fortunately we never found a dead body in the thicket/jungle of abandoned G&W or PRR R/W.)
Hoping the OP understands that CN gobbled up most of IHB as its personal Chicago shortcut or he's got a lot of learning to do. The Google Earth & Bing Imagery has yet to catch up with the changes in the SE quadrant of Gary.(and has CN ever been busy building railroad in this same area for their Chicago bypass)
mudchicken Hoping the OP understands that CN gobbled up most of IHB as its personal Chicago shortcut or he's got a lot of learning to do. The Google Earth & Bing Imagery has yet to catch up with the changes in the SE quadrant of Gary.(and has CN ever been busy building railroad in this same area for their Chicago bypass)
I think that you mean CP has gobbled up most of the IHB capacity, Mudchicken.
Late to the discussion here and most of it is pretty accurate.
NS has several access routes to Gibson:
1. NS - Porter Branch (CSX trackage rights) from Porter west. Currently there is a connection in place at Tolleston which allows trains off of the Porter Branch to access Kirk Yard. This was put into service the past few months and is NOT shown on the map in Trains. It is a critical omission to the map. Currently NS is running 2- 3 trains daily into Kirk via this connection. Also, NS is running their 31M auto racker to Gibson via this routing frequently. Westbound 31k is a Kankakee route BNSF train which uses this routing.
2. NS can continue west on their mainline to CP 502 and make a left hand turn onto the IHB and access Gibson. They do this frequently with the 31M and 31k, based on what is occuring on the CSX.
3. NS can access the Gibson Yard from the NKP line, turning right at Osborn and then moving up to IHB Gibson. This is done by their auto racker 13J from Ft. Wayne daily. For awhile earlier this year 13J was moving on the old CFE (ex PRR) from Ft. Wayne. This was a daily move until they figured out the CFE line needed a lot of work. Chatter earlier this year indicated NS was going to run 6-8 trains daily on the CFE. NOPE....cannot occur in the present conditions.
4. NS can access Gibson from the Kankakee line, although I dont think there is anything moving that way.
Meanwhile the Kankakee line is an interesting route. Currently 10R, 31k, and 36J run this route as scheduled manifests. There are coal trains which move to Wheatfield, In from UP (Momence) and off the NS from somewhere out east. Usually there are 2 loaded coal trains per day to feed that hungry NIPSCO power plant. There are some grain trains which move via this line.
Interestingly, CP trains could access IHB (whom they have ownership in) as a route to Bensenville, but they choose not to, instead running to CP509 (Rock Island Jct) and using BRC to Bensenville. However, CP does run its intermodal train on CSX out of Bensenville and this runs via IHB. CP runs about 6 scheduled trains on NS plus the tank trains (usually 1-2 loaded oil/ethanol per day).
It is interesting to see how NS, CP, CSX, IHB, and AMT trains navigate from Porter to Chicago. Remember that CSX has trackage rights from their Michigan line at Porter to CP509. There are 3 scheduled manifests and usually 2 loaded coal trains daily plus the Amtrakers. IHB has trackage rights and runs IHB 115 to and from Burns Harbor Yard.
CFE can help, but not in the present condition. Kankakee line can help, but that involves routing oil trains to Galesburg then to Streator and over to CP 502 or Porter. For awhile they were going to route these via CFE but bad track axed that plan.
Sorry if some of this is duplicated...had several calls and emails to address.
ed
Many thanks for all these responses. My understanding of what is going on was clearly imperfect, and these responses bring some clarity, but the situation as described is complex, probably only truly intelligible to those who have to operate through it!
I should first of all say that the last time I was around Gibson yard, I shot NW2 8829 next to the coaling tower, an SD45 leading an EL TOFC train across the main street in Hammond and a Baldwin DR 6-6-2000 at Kirk Yard. Nixon was president, so yes, Mudchicken, definitely out of the loop.
Also, my downloaded N American RR Map, whilst invaluable in many respects is not always reliable, and certainly now out of date. This shows NS trackage rights on the Porter branch ending (very oddly) at Willow Creek. Now n0121944 says these extend to Ivanhoe, so my starting premise that NS can't directly access the IHB from the NYC at Porter falls flat.
What I didn’t get from the Frailey article was why CP sends its Michigan traffic via Craigin and the BRC (see also MP173, point 4); I would have thought the IHB would have made more sense, and assumed, wrongly, the BRC routing was because of limited connections eastward off the IHB. It was said that one of the reasons CP was after CSX was to get control of the IHB, and I assumed (unnecessarily) they would have then fixed the eastern connection.
The bit I missed was BOCT ownership from Blue Island to McCook (n0129144 and CShaveRR) and its importance to CSX traffic. I thought CP had part ownership of all the IHB, and could use it at will- perhaps not? Implicit in my original post was that it might be possible to debottleneck the IHB if the will was there- it seems to vary between two and three mains, and there is maybe space to add more some third main in some places? If CSX’s priority is to keep other folk off their patch, this is a non-starter. I assumed that the PRR rights on the BOCT section would have been maintained, so the answer to mudchicken’s question (June 6th) as to why and how they were allowed lapse is of interest.
There is still confusion in my mind over Mudchicken’s comments about the CN and IHB (June 6th) and beaulieu’s follow up comment about CP and IHB capacity. I had thought that CN’s acquisition of the EJ&E would have made the IHB less relevant to them, and the comment about CP and IHB capacity does not seems to tally with MP173 and Frailey’s comments about CP routing.
I had also thought that the realignment around Gary airport had been linked to CN efforts to make life easier for itself. Need to try and get my mind round what CSX and NS are up to at the locations mentioned. At least it answers one of my other implicit questions, namely are NS and CSX willing to work together if mutual benefit can be found, and the answer is affirmative.
Much as the romantic in me would like to see the PRR main alive again, I was never clear why NS would want to spend money refurbishing someone else’s railroad, having a 2 track NYC main and single track NKP main heading east already. Wouldn’t a better long term bet be to upgrade one or both of these? The NYC ROW is 4 track, I believe.
Thanks again to all.
Dreyfusshudson I was never clear why NS would want to spend money refurbishing someone else’s railroad, having a 2 track NYC main and single track NKP main heading east already. Wouldn’t a better long term bet be to upgrade one or both of these?
Speculating, of course, but I believe that the main purpose of all this was to get congestion on the former NYC line out of Chicago under control, so the extent of any improvements to the NYC line that would deliver what was wanted, would have been enormous (extra main all the way to Elkhart?)
I also don't believe that the former NKP line would have worked very well, since the west end between Fort Wayne and Chicago sees a good bit of use as part of NS's Atlanta-Chicago corridor. So again, what extent would they have to go to with improvements to make the new use work in a way that doesn't impact the existing?
Bottom line, I suspect that NS envisions this need as being temporary, and doing what they have done to bolster an underused property was likely cheaper than the other two alternatives.
Plus, no "enviro" delays, no Nimby concerns, just dress up what already exists, and run 'em.
Thanks- your conclusion sounds plausible to me.
Yes, but....
While short "ramp up" time and lower up-front costs are likely factors, one additional possibility came to me later after first posting the above.
Someone might know better, but it could possibly be that by perfoming the improvements on a line that is not owned, the related costs could be "expensed" and recovered more quickly than if they were capitalized on their own property, and amortized over several years?
IIRC, CFE is leased from CSX but NS has trackage rights on the former Pennsy raceway from the Conrail split deal. So NS upgrading CFE would be similar in a way to what CSX is doing with the L & I line between Louisville, KY and Indianapolis, IN.
NS set up a separate "fueling facility" on the ex PRR in downtown Fort Wayne so that traffic on the CF&E can run-through without having to go up and down the busy ex-Wabash line in town to get to the fuel pad at East Wayne Yard. So there is evidence NS hasn't given up on the idea of running run-through trains on the ex PRR. NS still dispatches the line, too.
Details on the improvements to the former PRR line, if any one is interested:
http://www.journalgazette.net/blog/the-scoop/Chicago--Fort-Wayne--Eastern-railroad-announces-track-improvement-project
I had thought some source had mentioned that the "6 train per day" limit for NS was being expanded as part consideration of the improvements they were funding. But I can find no hard evidence of that anywhere. So it must have been just hear-say?
I live in Valparaiso, In (NKP and CFE lines run thru town) and have been somewhat puzzled by the lack of NS trains on the CFE...until last Saturday.
CFE sent an eastbound freight with 2 units and 100 cars. Most of the cars were loaded boxcars, loaded grain hoppers, and loaded gons (scrap). The final 20 cars were BNSF empty rail carrying flats going back to Columbia City no doubt for more welded rail. Nice healthy train.
The train was moving at perhaps 10mph. I jumped ahead of it about 10 miles and waited and it was still moving 10mph.
The track looks good, but obviously there are issues. There was probably 11,000 tons with 2 big motors, and the engines were not working hard, so it wasnt a matter of an underpowered train. NS doesnt seem to be moving freight between Ft. Wayne and Hobart on the CFE and it seems to be an issue of slow orders.
How this plays out in the future is something I cannot speculate on, but for now the grand plans of using the CFE as a relief valve for 6 trains daily doesnt seem to be reality.
Ed
Ed,
I would not be so quick to jump to the conclusion that the six eastward trains per day plan is dead.
The article announcing it came out in January. It says 50 miles of surfacing, 10,000 ties, and some rail relay. That is a summer's worth of work for a shortline even if contracted. First do rail changeout assuming it also requires new tie plates. No sense to spike kill new ties. Then change out ties. Have to purchase them, get them and unload them before can even start to change them. A good shortline tie crew can do 500 ties per day if they get full day of track time. That is 20 work days, say a month. Surfacing will probably be at rate of about 1 mile per day, so there is another two months, although surfacing could start about a week after the tie project. Look for ballast trains after tie change but before surfacing. Do not know how much signal work would be required to get reliable predictors in the bungalos. Since this is former high speed line I would assume track circuits are already long enough.
Just because the train you saw was doing 10 MPH does not mean this work is not underway.
Mac McCulloch
MP173NS doesnt seem to be moving freight between Ft. Wayne and Hobart on the CFE and it seems to be an issue of slow orders.
The funny thing about that, here in Ft Wayne we are getting multiple eastbound unit tanker trains, DAILY coming in on that line from the west. I haven't bothered to stop for an entire day just to monitor this line but I pass it several times per day and see new trains on it frequently. Invariably with consists made up of NS units combined with one of the two big western roads, followed by a buffer car, and then a long stream of tank cars. The varying make up of the consists along with the different buffer cars confirm that these are multiple trains per day and not just the same train sitting there all day. Just the other day I observed two fuel trucks sevicing a stopped train at the fueling stop.
Wonder where they are coming from if they are not going through Valpo?
edit: Are you getting multiple east bound tank unit trains per day on the NKP?
I suppose that it is possible that they are traveling Chicago-Ft Wayne on the NKP and then switching over to CFE at a local west side junction, to fuel and then continue east on the CFE.
Do NS and CSX have the big rail and/or tie replacment machines like UP & BNSF use? Similar to this?
https://www.youtube.com/watch?v=_MKcTbYDP7w
Multiple machines were in the video - Each carrier has machines to deal with it's own track characteristics. Ballast spreading, Ballast Cleaning, Tamping, rail replacement and tie replacement are common to all railroads. The functions can be done individually or in concert with each other as the carrier may desire.
The 1st machine pictured was changing the right of way from wood ties to concrete ties - in most cases the machine is leased for the specific job the carrier desires as concrete ties have yet to become the universal replacment for wood ties. In most cases the installation of concrete ties covers a 'test territory' where the performance of the ties will be closely watched over time. While the theory is that concrete ties provide more consistent and longer lasting rail support than wood ties, the demonstrated performance has fallen short of the theory and the make of concrete ties is constantly evolving to remedy the shortcomings found in the test installations.
Mudchicken is the expert on this forum in the track work area.
Never too old to have a happy childhood!
There are tank trains on the NKP thru Valpo. Perhaps NS is sending some thru on the CFE, but the track speed and condition of the rails is not good.
How is the track east of Ft Wayne on CFE?Ed
MP173How is the track east of Ft Wayne on CFE?
I guess that depends upon who you ask. Having not been out that way personally, I can only speculate based upon what others have said. I guess that a lot of the work contemplated for this line has been completed East of Ft Wayne. But again not having seen it with my own eyes....
If you haven't already seen the following, it's worth a read:
http://railroadfan.com/phpbb/viewtopic.php?f=26&t=27344&hilit=Wayne+Mansfield&start=520#p324220
Reading down a ways the guy states that most of the line between Ft Wayne and Lima has been approved for 40 mph.
So perhaps that is what they are doing, using the NKP between Ft Wayne and Chicago temporarily (for this new traffic) until the line improvements on the CF&E west of Ft Wayne are complete?
What Mudchicken stated earlier about connections being reworked in conjuction with the Gary airport expansion are likely key to what's going on with the west end of the CF&E.
It's a shame that the old Wabash 4th district is all gone.
Is the CFE considered as dark or did they retain any signals besides interlockings?
Convicted One It's a shame that the old Wabash 4th district is all gone.
The line had some pretty ugly subgrade problems when it was whole which made it unattractive to NS/N&W in its final years.
Great book on that subject
The 4th District was always a "head scratcher" for me, even in context with the officially cited reasons for it's construction. But, if you contemplate the 4th district as a segment in conjunction with the W&LE and Gould's Wabash Pittsbugh Terminal extension....it starts to make sense.
MP173 track speed and condition of the rails is not good
Word of mouth has it that a substantial number of ties are being replaced on the CF&E right now, in the Larwill-Warsaw area.
There are bundles of ties along the right of way here in NW Indiana. It seems as if NS has quit running on the CFE between the Fort and East Hobart except for the Spriggsboro - East Hobart section....which is pretty well maintained.
From NS's 2nd Quarter Earnings report:
"Net income for the quarter was $433 million, 23 percent lower compared with the $562 million record results from the same period of 2014. Diluted earnings per share were $1.41 compared with $1.79 per diluted share earned in the second quarter last year."
The Op Ratio has climbed to 70. Share price has fallen to $83.76 from about $114 last fall. Will be interesting to see where they start retrenching.
Perhaps traffic is lower and they are trying to reduce expeditures such as charges paid to to run on the CFE.
Maybe Harrison sought CSX so he could have his own railroad all the way thru Chicago - like he did when with CN.
Jack Fuller
Our community is FREE to join. To participate you must either login or register for an account.