Trains.com

Bending turnout points for closure

3160 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    August 2003
  • 6,434 posts
Bending turnout points for closure
Posted by FJ and G on Wednesday, June 30, 2004 11:30 AM
I've observed older points that are separate from closure rails but on some of the high speed turnouts, it appears to be one solid piece and to make the turnout operate, the steel rails of the points seem to bend instead of pivot.

Am I seeing things or is this true?

I always thought that if you bend a piece of metal so many times, it will snap.

Also, I'm impressed at how thin the points are, yet they partially hold the weight of the train along with the stock rails.

Dave Vergun
  • Member since
    September 2003
  • From: Southern Region now, UK
  • 820 posts
Posted by Hugh Jampton on Wednesday, June 30, 2004 11:37 AM
No, you are not seeing things,, this is what happens.

You're describing failure by metal fatige. Steel has what is called a fatigue limit. If the stress in the metal due to the bending is less than the fatigue limit then it will not fail. The distance the switch blade has to move, coupled with its thin profile ensures that the stress in the switch blade is less than the fatigue limit.

The key worh here is partially. The weight transfer from the stock rail to the switch blade is designed so that the switch blade does not carry more load than it is capable of holding.
Generally a lurker by nature

Be Alert
The world needs more lerts.

It's the 3rd rail that makes the difference.
  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Wednesday, June 30, 2004 12:48 PM
The bent stockrail on the turnout side is the only thing here that gets permanently "bent" by a hydraulic jack. A 22 or 39 foot switch point is resting on switch plates and is not fastened to the ground ahead of the heel of switch. You can easilly generate enough moment arm to move 15-16 feet of machined rail over 5-6 inches laterally and structural metal fatigue will not be an issue for the life of the points. Those undermaintained wheels on a locomotive or railcar will do most of the wear and tear.

An old roadmaster correctly taught me to be worried more about the stockrail than the worn points.
Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    August 2003
  • 6,434 posts
Posted by FJ and G on Wednesday, June 30, 2004 1:58 PM
I'm not on this forum too much but when I am, my questions always get answered in great detail. That's what I love about this place. Thanks!

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy