Posted by henry6 on Friday, April 2, 2010 9:08 AM

A concept in search of a market is nothing new in our world....gasoline was a volitile product gleaned by refining crude oil that had not place to go until the gasoline engine was invented to propel automobiles...how many other things can be added to the list.  Anyway, that's no excuse for not accepting it...in fact I think I gave a couple of good examples of how and where it might be adapted.  Moving less than trainload lots of coal from small mines; inter and intra plant movement of materials and parts even as part of an assemblyline; a manufacurer than produces a set number of units of product in a given day or week that all goes to one other location...there are so many opportunities to adapt this product to...it just takes ingenuity, creativity, dedication to the job, or just a light bulb being turned on in someones' mind at the right time at the right place with the right thing.  Inginuity, rescoursfulness, creativity are things not automatic or as finely defined and produced as a computer sourced solution.

As for stepping on a rail...electricution had nothing to do with the rule...it is simply that it in much easier to turn and ankle or lose balance or somehow injure oneself;   Common sense says step over not on.

RIDEWITHMEHENRY is the name for our almost monthly day of riding trains and transit in either the NYCity or Philadelphia areas including all commuter lines, Amtrak, subways, light rail and trolleys, bus and ferries when warranted. No fees, just let us know you want to join the ride and pay your fares. Ask to be on our email list or find us on FB as RIDEWITHMEHENRY (all caps) to get descriptions of each outing.

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Friday, April 2, 2010 6:53 AM

In response to an earlier posting, Reading was plagued with lots of short hauls and was losing business to trucks as a consequence.  After much negotiation with the operating brotherhoods, it came up with Bee Line Service in around 1965 as an attempt to make money on short hauls and short consists.  The brotherhoods agreed to relax rules regarding crew requirements and seniority districts (among other things) for this service.  Reading found that it was able to actually make money on short hauls as a result.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Thursday, April 1, 2010 11:55 PM

blownout cylinder

zugmann
  ...

I'll mention what I saw here------Trucks.  We do not need to reinvent the wheel. We do not need to do everything the same way Europe does.

 

 

True.  But the answer didn't quite fit the question so I took it out. 

 But yeah, there has to be a point where it is just not economical to run a train.  If someone needs to move something small a short distance, they can hire a truck. 

 

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

Moderator
  • Member since
    November 2008
  • From: London ON
  • 10,392 posts
Posted by blownout cylinder on Thursday, April 1, 2010 11:53 PM

zugmann
  ...

I'll mention what I saw here------Trucks.  We do not need to reinvent the wheel. We do not need to do everything the same way Europe does.

Any argument carried far enough will end up in Semantics--Hartz's law of rhetoric Emerald. Leemer and Southern The route of the Sceptre Express Barry

I just started my blog site...more stuff to come...

http://modeltrainswithmusic.blogspot.ca/

  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Thursday, April 1, 2010 11:41 PM
  ...

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

  • Member since
    February 2009
  • 402 posts
Posted by BT CPSO 266 on Thursday, April 1, 2010 11:31 PM

 

Paul_D_North_Jr

greyhounds
Start with a job that needs to be done and come up with a tool to do the job.

  That's vintage John Kneiling - esp. the part I quoted.  Thanks for bringing us back to reality.  Thumbs Up

- Paul North. 

The need is; attracting businesses with smaller shipments looking for more flexible shipping options by rail on shorter hauls.

  • Member since
    December 2001
  • From: NW Wisconsin
  • 3,857 posts
Posted by beaulieu on Thursday, April 1, 2010 10:07 PM

BaltACD

The US rail system has many points of capacity restraints when dealing with major market areas...areas where the volume necessary for a single CargoSprinter would most likely be either originated or terminated.  A 90 meter train, in such territory would be a waste of valuable track capacity, track capacity that is predicated upon the 'normal' 9000 foot train. 

When in motion, all trains occupy a signal occupancy block...those blocks in most modern installations are being lengthened to approximately 3 miles between signals.  To obtain a Clear signal indication, at least 2 blocks ahead of the train must be clear of trains, some signal systems are configured to have the requirement of having 3 blocks clear of trains to obtain a Clear signal.  The signal system doesn't know if the train occupying the block is 100 feet long or 10000 feet long...it knows the block is occupied by a train that the system must provide protection for.

Wabash states that he runs on 'Approach' indications and 'Restricting' indications, which is the normal course of railroading and a routine occurrence....When running on other than Clear signal indications the train is not being operated at track speed.  When operating under an Approach indication the train is being operated so as to be able to STOP at the next signal and taking actions to reduce the trains speed to nominally 1/2 the track speed for the territory upon passing the Approach indication.  When operating on a Restricting signal, the train is being operated at Restricted Speed - a speed no greater than 15 or 20 MPH (depends on the carriers rules) that will permit stopping the train within 1/2 the range of vision, short of train or other track obstruction.  PTC when implemented, may bring some changes to these operations.

I would not want to be on a CargoSprinter if it had an impact with current US rail equipment.

 

 

The situation  is similar in much Europe, the track capacity is too valuable to waste on such a small train. Under the German track access pricing scheme, that Cargo Sprinter would be charged the same price as a 600 meter long Intermodal train. Running over a Category F3 track both trains would be charged € 2.68 per km. There are some additional fees, path allocation, Express priority, etc, that also work against a short train.

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Thursday, April 1, 2010 7:08 PM

It seems like everyone is always trying to reinvent the wheel.  I think that many of the problems this and other systems are trying to solve is less technological and more institutional.  The level of profit to be made, even when costs are cut to the bone, may not be sufficient to attract the interest of the railroads for some business.

To be successful on a wide spread basis you would almost need a totally dedicated infrastructure that can handle high volumes on short headways with open access.  Light Freight Rail anyone?  Maybe it could be something that could be integrated with the HST passenger corridors proposed around the country.  Freight moving within a region could use this, then go to Heavy Haul rail for transport between regions.

That something designed for a specific area (Europe) hasn't caught on there yet kind of says it all.   

Jeff

PS.  I think it's been quite a while since most truck drivers were Teamsters.  I heard some time ago that the percentage of drivers who were Teamsters was around 25%.  I think it's dropped since then.    

Moderator
  • Member since
    November 2008
  • From: London ON
  • 10,392 posts
Posted by blownout cylinder on Thursday, April 1, 2010 5:55 PM

zugmann

TH&B
 

 As far as I understand in Europe the rule is one must step on the rail when crossing tracks. (oppasite of US "rules").  [Europeans trip on the rail, Americans slip apparently]  so who are the goofs? But it's the rules .

  

 

 

I heard the reason for "not stepping on the rail" had nothing to do with tripping hazards, but had everything to do with electrification and broken bond wires/joints.  

I wonder if it could be both and a few other things as well. That bond wire/joint thing is a real issue on some tracks. One crossing I got through has a rail section that drops about 6" or so everytime a train goes over it. Wonder what'll occur with that much movement over time--Whistling

 

Any argument carried far enough will end up in Semantics--Hartz's law of rhetoric Emerald. Leemer and Southern The route of the Sceptre Express Barry

I just started my blog site...more stuff to come...

http://modeltrainswithmusic.blogspot.ca/

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, April 1, 2010 5:48 PM

BNSFwatcher

Engineer vs. Truck Driver?  What's the difference?  They are, mostly all, members of the "Teamsters Union".  I will reserve judgement until they find Jimmy Hoffa and see what he has to say.  Go for it!  Dig up all of the New Jersey landfills, the "Piney Woods" and the seashores!  Stay away from Staten Island's 'Fresh Kill'!  (Hint!!!).

Hays

Giant's Stadium is being torn down as we post....Will Jimmy be found there?

Never too old to have a happy childhood!

              

  • Member since
    May 2009
  • 798 posts
Posted by BNSFwatcher on Thursday, April 1, 2010 5:41 PM

Engineer vs. Truck Driver?  What's the difference?  They are, mostly all, members of the "Teamsters Union".  I will reserve judgement until they find Jimmy Hoffa and see what he has to say.  Go for it!  Dig up all of the New Jersey landfills, the "Piney Woods" and the seashores!  Stay away from Staten Island's 'Fresh Kill'!  (Hint!!!).

Hays

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, April 1, 2010 5:08 PM

The US rail system has many points of capacity restraints when dealing with major market areas...areas where the volume necessary for a single CargoSprinter would most likely be either originated or terminated.  A 90 meter train, in such territory would be a waste of valuable track capacity, track capacity that is predicated upon the 'normal' 9000 foot train. 

When in motion, all trains occupy a signal occupancy block...those blocks in most modern installations are being lengthened to approximately 3 miles between signals.  To obtain a Clear signal indication, at least 2 blocks ahead of the train must be clear of trains, some signal systems are configured to have the requirement of having 3 blocks clear of trains to obtain a Clear signal.  The signal system doesn't know if the train occupying the block is 100 feet long or 10000 feet long...it knows the block is occupied by a train that the system must provide protection for.

Wabash states that he runs on 'Approach' indications and 'Restricting' indications, which is the normal course of railroading and a routine occurrence....When running on other than Clear signal indications the train is not being operated at track speed.  When operating under an Approach indication the train is being operated so as to be able to STOP at the next signal and taking actions to reduce the trains speed to nominally 1/2 the track speed for the territory upon passing the Approach indication.  When operating on a Restricting signal, the train is being operated at Restricted Speed - a speed no greater than 15 or 20 MPH (depends on the carriers rules) that will permit stopping the train within 1/2 the range of vision, short of train or other track obstruction.  PTC when implemented, may bring some changes to these operations.

I would not want to be on a CargoSprinter if it had an impact with current US rail equipment.

Never too old to have a happy childhood!

              

  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Thursday, April 1, 2010 4:47 PM

TH&B
 

 As far as I understand in Europe the rule is one must step on the rail when crossing tracks. (oppasite of US "rules").  [Europeans trip on the rail, Americans slip apparently]  so who are the goofs? But it's the rules .

  

 

 

I heard the reason for "not stepping on the rail" had nothing to do with tripping hazards, but had everything to do with electrification and broken bond wires/joints.  

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

  • Member since
    July 2003
  • 964 posts
Posted by TH&B on Thursday, April 1, 2010 4:04 PM

greyhounds

This is a concept in search of a market.  That's backwards

Yes.  Keeping in mind that this "European" concept is not even successfull in Europe.

 But, could it also be a problem with the law ?   In theory the unit train should be equaly at home short or long haul.  But the US laws favour long haul over short haul.   

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, April 1, 2010 3:54 PM

carnej1
  One of my quirky interests is the history of the "Integral Train" concept which has been kicking around the international industry since the 60's. The Cargosprinter is certainly an embodiment of that idea.

 However, I note that there have been attempts to introduce Cargosprimnter operations in Germany, the UK, and Australia, and so far, none of the experiments has proved to be viable economically. So it id difficult to see how it would succeed in the U.S.

A similiar system was the CSX/CP Iron Highway which got as far as prototype stage (though the trainsets never had their self propulsion systems installed and were pulled by locomotives). This was further developed by CP into the "Expressway" RO/RO trailer carrying trainsets, so the idea had some merit.

The original "Iron Highway" proposal:

http://www.google.com/patents/about?id=sj48AAAAEBAJ

The Integral Train seems to be one of those ideas whose time is "forever yet to come".. 

 

Thanks for that link !  Thumbs Up  We seem to share a lot of the same interests and views on this - not that everybody has to agree with my views, but it's nice to know there's someone else that at least understands the discussion, even if we might disagree what it means and whether or not it'll work in a real-world 2010 railroad application, as contrasted with the industry 50 years ago.  Now there might be . . . oh, what, maybe 5 or 6 of us, altogether Whistling 

- Paul North. 

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, April 1, 2010 3:47 PM

TH&B
  [snip]  Anyways, it's the concept that counts.  Adapt the idea to North America. Put a Genset in front of one or more spine cars and you effectively have a legal equivalant of a s"Sprinter".  One or two operaters, safety, small capacity for unit train like short hauls. Keep it single decker for easy fast load/unload unless facilitys  exist for double stack.

  That's pretty much what I was trying to say early yesterday morning (03-31) over on the Couplers thread [don't ask how I wound up doing that, though - it's a long and convoluted thought process  Whistling  ]. 

I believe a 700 HP genset weighs about 7,500 lbs on a skid, though it might be a little wide to fit crosswise.  But I saw a 1500 KW version inside what looked like a 20 ft. long intermodal container at about 25,000 lbs., so it would fit right in - and take the place of a regular container there, complete with fuel tanks and radiators, etc. - not sure about dynamic braking capability, though.  What that would amount to is a 'mini-loco' - and then I wonder about what FRA 92-day inspections, etc. would be required for it.  But if it's in a box, just lift it off for inspection and servicing, and replace it with another module, connect the cables, and off it goes.  Remind me to post the links to those, or at least better description.  To be continued . . .

- Paul North. 

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, April 1, 2010 3:40 PM

greyhounds
Start with a job that needs to be done and come up with a tool to do the job.

  That's vintage John Kneiling - esp. the part I quoted.  Thanks for bringing us back to reality.  Thumbs Up

- Paul North. 

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    August 2003
  • From: Antioch, IL
  • 4,371 posts
Posted by greyhounds on Thursday, April 1, 2010 3:26 PM

This is a concept in search of a market.  That's backwards.

To be successful you start with market potential and develop a concept to meet the market need.

Most posters are looking for a place to use this tool.  That won't work.  Start with a job that needs to be done and come up with a tool to do the job.

 

"By many measures, the U.S. freight rail system is the safest, most efficient and cost effective in the world." - Federal Railroad Administration, October, 2009. I'm just your average, everyday, uncivilized howling "anti-government" critic of mass government expenditures for "High Speed Rail" in the US. And I'm gosh darn proud of that.
  • Member since
    July 2003
  • 964 posts
Posted by TH&B on Thursday, April 1, 2010 2:54 PM

henry6

First note in clip that the "driver" steps on rails to access the train....safety no, no!

 As far as I understand in Europe the rule is one must step on the rail when crossing tracks. (oppasite of US "rules").  [Europeans trip on the rail, Americans slip apparently]  so who are the goofs? But it's the rules .

 Anyways, it's the concept that counts.  Adapt the idea to North America. Put a Genset in front of one or more spine cars and you effectively have a legal equivalant of a s"Sprinter".  One or two operaters, safety, small capacity for unit train like short hauls. Keep it single decker for easy fast load/unload unless facilitys  exist for double stack.

 

 

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, April 1, 2010 2:47 PM

The PRR's center-cab location was the result of a grade crossing accident in NJ involving an early box-cab P5 that killed one or both members of the crew, not a railroad-only accident*.  Grade crossings are still a concern, but the degree of risk and exposure to damage and injury/death would depend mostly on the speed of the train.  Also, Amtrak's P40 and Genesis units don't have a lot of front-end protection, but they seem to do OK, as well as any number of cab-car leading push-pull commuter operations.

*As to that kind of accident, the response I've seen or heard most often from a supervisory official type is to the effect of ''Mister, you do your job right and that will never happen to you.''

- Paul North.

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    September 2002
  • 7,486 posts
Posted by ndbprr on Thursday, April 1, 2010 2:40 PM

Would you want to be in that cab when it meets something else?  That is why the PRR went to the GG1 and streamlined P5a cab location after a couple of wrecks involving deaths in the 1930's.

  • Member since
    January 2002
  • From: Canterlot
  • 9,575 posts
Posted by zugmann on Thursday, April 1, 2010 1:30 PM

 That thing looks like a toy.  Sure it looks good, but can it handle the rigors of daily service?  And how many of these toys are you going to couple together before you just fire up the GP38 and run some real freight?  MOW has been slowly using some Brandt trucks, but I heard of at least one division/line that banished them due to their slow speeds. 

It's been fun.  But it isn't much fun anymore.   Signing off for now. 


  

The opinions expressed here represent my own and not those of my employer, any other railroad, company, or person.t fun any

  • Member since
    December 2001
  • 8,156 posts
Posted by henry6 on Thursday, April 1, 2010 11:33 AM

carnej1

BT CPSO 266

It was brought up in a thread about how this German cargo sprinter http://www.youtube.com/watch?v=yv4tIuIJzls can offer more flexible shipping options for smaller, direct to "shipping dock" loads.

It has not caught on in Europe, but here in the U.S. I am curious of what is keeping this from being successful or even recognized, besides possibly lobbyists.

Anyone think these could possibly work out in the eastern half of the country? I am not saying these are going to replace conventional Intermodal trains, but grab more customers that are looking for flexibility with larger shipments. 


 

One of my quirky interests is the history of the "Integral Train" concept which has been kicking around the international industry since the 60's. The Cargosprinter is certainly an embodiment of that idea.

 However, I note that there have been attempts to introduce Cargosprimnter operations in Germany, the UK, and Australia, and so far, none of the experiments has proved to be viable economically. So it id difficult to see how it would succeed in the U.S.

A similiar system was the CSX/CP Iron Highway which got as far as prototype stage (though the trainsets never had their self propulsion systems installed and were pulled by locomotives). This was further developed by CP into the "Expressway" RO/RO trailer carrying trainsets, so the idea had some merit.

The original "Iron Highway" proposal:

http://www.google.com/patents/about?id=sj48AAAAEBAJ

The Integral Train seems to be one of those ideas whose time is "forever yet to come"..

Yes, John (Knieling).

RIDEWITHMEHENRY is the name for our almost monthly day of riding trains and transit in either the NYCity or Philadelphia areas including all commuter lines, Amtrak, subways, light rail and trolleys, bus and ferries when warranted. No fees, just let us know you want to join the ride and pay your fares. Ask to be on our email list or find us on FB as RIDEWITHMEHENRY (all caps) to get descriptions of each outing.

  • Member since
    November 2003
  • From: Rhode Island
  • 2,289 posts
Posted by carnej1 on Thursday, April 1, 2010 11:24 AM

BT CPSO 266

It was brought up in a thread about how this German cargo sprinter http://www.youtube.com/watch?v=yv4tIuIJzls can offer more flexible shipping options for smaller, direct to "shipping dock" loads.

It has not caught on in Europe, but here in the U.S. I am curious of what is keeping this from being successful or even recognized, besides possibly lobbyists.

Anyone think these could possibly work out in the eastern half of the country? I am not saying these are going to replace conventional Intermodal trains, but grab more customers that are looking for flexibility with larger shipments. 


 

One of my quirky interests is the history of the "Integral Train" concept which has been kicking around the international industry since the 60's. The Cargosprinter is certainly an embodiment of that idea.

 However, I note that there have been attempts to introduce Cargosprimnter operations in Germany, the UK, and Australia, and so far, none of the experiments has proved to be viable economically. So it id difficult to see how it would succeed in the U.S.

A similiar system was the CSX/CP Iron Highway which got as far as prototype stage (though the trainsets never had their self propulsion systems installed and were pulled by locomotives). This was further developed by CP into the "Expressway" RO/RO trailer carrying trainsets, so the idea had some merit.

The original "Iron Highway" proposal:

http://www.google.com/patents/about?id=sj48AAAAEBAJ

The Integral Train seems to be one of those ideas whose time is "forever yet to come"..

"I Often Dream of Trains"-From the Album of the Same Name by Robyn Hitchcock

  • Member since
    February 2009
  • 402 posts
Posted by BT CPSO 266 on Thursday, April 1, 2010 11:10 AM

It is true that there is the issue of loading/unloading the container from the train.

I see it as building smaller intermodal facilities to be built in smaller cities and industrial zones, to encourage that option on using this vehicle.  They don't have to be these massive intermodal terminals like we are familiar with.

OR

Having the companies have their warehouses located right by the tracks with a crane to be used to lift the container right on the dock. I think they could also modify the sprinter with a flexi-van concept of turning the table the container is resting on and push the container onto the warehouse dock.

 

Brought up earlier is how these will intermingle with conventional trains. I brought it up before in the past, and I bring it up again; We need to build up the main routes for these smaller, faster sprinters to pass up the larger, slower freights. Mulit-track routes (kind of like highways) faster trains passing slower ones on a parallel track and not affecting the other trains cruising speed. Not brief locations where one train waits so the other can pass.

I think this could really work if there would be enough committed shippers to try this out with the railroads and if it works, the concept will spread. Course this is all based on shippers and receivers, willing to locate closer to the tracks, and have this massive shift. This would have to be massive undertaking over time. 

 

  • Member since
    April 2001
  • From: US
  • 2,849 posts
Posted by wabash1 on Thursday, April 1, 2010 10:42 AM

paul why does a train need a few miles both directions of clear track? we run in each others block all the time. and the only rule i know of now is a passenger train must have 2 blocks ahead and behind him cleared at all time

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, April 1, 2010 10:39 AM

Until PTC is installed, I don't see the FRA allowing this to co-mingle with full-size trains. BUT, a similar system might be worked out with small road-switchers (MP15s, GP40-2s, etc) plus a couple of the many stored spine cars. It would take some work to make it profitable and adapt it to the US rail network, but it's more viable at the moment than a beefed-up truck running with full-size trains.

  • Member since
    January 2009
  • From: Poulsbo, WA
  • 429 posts
Posted by creepycrank on Thursday, April 1, 2010 10:33 AM
I think the key phrase is... In Germany over 300 businesses have little used railroad connections. So they probably shipping from little used siding to little used siding. In this country the sidings disappeared ages ago, hence our reaction is that extra handling is required to get the shipment to the tracks and again delivered on the other end. Anyway don't we have a trailer with railroad wheels system in place anyway.
Revision 1: Adds this new piece Revision 2: Improves it Revision 3: Makes it just right Revision 4: Removes it.
  • Member since
    December 2001
  • 8,156 posts
Posted by henry6 on Thursday, April 1, 2010 10:29 AM

aricat

I see three big issues; would the operator be an engineer or a truck driver? Any unionized railroad this will be an issue.There will also be a question of jurisdiction. Could states claim jurisdiction that they are motor vehicles and not trains I could see the state police wanting to enforce speed laws and motor vehicle laws on them. However, I see the big issue is shipper acceptance. The traditional shipping dock gives shippers a lot of advantages that they would lose using this.One of the biggest is that the shippers employees both load and unload the trailer. The trucker simply backs into the dock. Here, how would the shipper be benefited? You would have to build something else, and that is something most shippers simply won't do.

Aricat, you are picking fights which probably won't develop whe you discuss unions and personnel.  As long as it is on rails only the railroad and its governing agencies have juristiction; you've invented a problem where none exist. As for the shipper and his proposed problems, this is a new technology and tool which if adapted is adapted without worry of what is happening now or happened before.

RIDEWITHMEHENRY is the name for our almost monthly day of riding trains and transit in either the NYCity or Philadelphia areas including all commuter lines, Amtrak, subways, light rail and trolleys, bus and ferries when warranted. No fees, just let us know you want to join the ride and pay your fares. Ask to be on our email list or find us on FB as RIDEWITHMEHENRY (all caps) to get descriptions of each outing.

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, April 1, 2010 10:26 AM

Thanks for that Original Post and the link to the video - about 8 mins. long.  I collect info on ideas like this, and that's a new one for me.

Two major problems, at least, not mentioned above:

1.  As a intermodal unit, it needs to be loaded and unloaded.  Presently that only happens at a handful of large, mechanized terminals.  While that adds a few dollars in costs and a couple of hours to the transit time, even more troublesome is the cost of the 'dray' from the shipper to the starting terminal, and from the ending terminal to the receiver.  That is essentially an Over-The-Road truck operation, and has the same costs and speeds.  So unless the shipper/ receiver are really close to one of those terminals, or it's a long-haul move or a specialized niche market, it's hard to see how the portion on the rails can save enough time and money to compensate for those delays and added costs.

2.  Track capacity constraints, especially on the portion of the trip that's on a busy main line.  Each train requires a couple miles of unoccupied track in front and in back of it for safety separation.  Putting more than just a few of these on a busy main line may soak up all of the available 'slots' in the schedule, for not much revenue compared to alternative trains and loads - say, 280 or more containers on a double-stack train.  If it's a branch line that sees only a few trains a day, this would not be a problem - but identifying a move that is exclusively on such lines and never goes near a high-volume main line is going to be a challenge.  This might be mitigated by scheduling a fleet of them to MU-together and run as a single train, but then that coordination problem is added in. 

I can see possibilities, but it will require detailed knowledge of the market and routes, careful and comprehensive analysis, and a 'critical mass' of terminals and trains to make it run well enough with enough volume to be profitable.

- Paul North. 

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy