Trains.com

UP running 18000 foot intermodal train on Sunset Route Dallas west to Long Beach

21972 views
57 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2005
  • From: MP 175.1 CN Neenah Sub
  • 4,917 posts
Posted by CNW 6000 on Monday, January 11, 2010 12:03 AM

Chris30

One benefit that the train crew has when running such a long train is that they know they won't be making a lot of planned stops / meets, etc. Once heard a dispatcher tell the crew of a 12,000 foot intermodal train that they weren't going to stop anywhere because he didn't have anywhere to stop them.

CC

So how will that affect crewing/districts?  As the case showed, (seemingly) no problems for the monster.  Did it stop to change crews?  Would it take 12 hours at "track speed" over the taken route to get from one end of a crew district to the other?  What happens to any hours "left over" when you hit the border of the district: are they simply lost if there isn't another train for you to hop on?

Dan

  • Member since
    February 2005
  • From: Burbank Junction
  • 195 posts
Posted by karldotcom on Monday, January 11, 2010 12:09 AM

http://www.youtube.com/watch?v=jdIzRFOaTCY&feature=sub

Snuffy posted a video of this thing passing through Southern California this afternoon....

My train videos - http://www.youtube.com/user/karldotcom

  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Monday, January 11, 2010 8:31 AM
CNW 6000

So how will that affect crewing/districts?  As the case showed, (seemingly) no problems for the monster.  Did it stop to change crews?  Would it take 12 hours at "track speed" over the taken route to get from one end of a crew district to the other?  What happens to any hours "left over" when you hit the border of the district: are they simply lost if there isn't another train for you to hop on?

Dan, the train changed crews in the usual places--it appears that seven crews handled the train from Dallas to Long Beach. Some took the full twelve hours, some got their run done in five. I'm not a road guy, so I can't tell you all of the ins and outs of how they get paid. But the guys who worked all twelve hours did pretty well--and the guys who worked only five hours still got a day's pay, at least. Conceivably, the crew that made their run in five hours could be called right away and catch another run back to their home terminal within the twelve-hour limit. That would be another day's pay.

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    December 2001
  • From: Northern New York
  • 25,022 posts
Posted by tree68 on Monday, January 11, 2010 2:05 PM

OK, so I counted three sets of DPU's. 

Can they all be controlled from one unmodified head end equipped locomotive, or did this one have to have extra equipment installed?

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    February 2005
  • From: Burbank Junction
  • 195 posts
Posted by karldotcom on Monday, January 11, 2010 2:20 PM

I believe it had new GE software on board...that was part of the test.

My train videos - http://www.youtube.com/user/karldotcom

  • Member since
    September 2003
  • From: Omaha, NE
  • 10,621 posts
Posted by dehusman on Monday, January 11, 2010 2:43 PM

tree68

Can they all be controlled from one unmodified head end equipped locomotive,

Yes. 

or did this one have to have extra equipment installed?

No.  But it did have new software.

Dave H. Painted side goes up. My website : wnbranch.com

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Monday, January 11, 2010 5:13 PM

CShaveRR
CNW 6000

So how will that affect crewing/districts?  As the case showed, (seemingly) no problems for the monster.  Did it stop to change crews?  Would it take 12 hours at "track speed" over the taken route to get from one end of a crew district to the other?  What happens to any hours "left over" when you hit the border of the district: are they simply lost if there isn't another train for you to hop on?

Dan, the train changed crews in the usual places--it appears that seven crews handled the train from Dallas to Long Beach. Some took the full twelve hours, some got their run done in five. I'm not a road guy, so I can't tell you all of the ins and outs of how they get paid. But the guys who worked all twelve hours did pretty well--and the guys who worked only five hours still got a day's pay, at least. Conceivably, the crew that made their run in five hours could be called right away and catch another run back to their home terminal within the twelve-hour limit. That would be another day's pay.

The revised Hours of Service regulations that were implemented in July 2009 have revised how the respite provisions are implemented.  If there is a train ready to return to the crews origin on their arrival at the away from home terminal they can step off the outward move and get on the homeward move with no problems.  If however, the homeward train is not waiting on the outward move...the crew can be instructed to take as specified number of hours of rest (greater than or equal to 4 hours) and show back up at a specified time to catch the homeward train.  The hours used in the outward trip count against their 12 hours of service.  If the outward trip took 5 hours....the crew has 7 hours of sevice remaing to work.

The revised HOS regulations require crews to get 10 hours undisturbed rest before being called on duty with a full 12 hours to work.  Since the normal 'call' is 2 hours, this is in effect 12 hours rest between off duty and going back on duty.

One carrier limits it's callers from calling ANY crew member until the 10 hour undisturbed clock has run...ie. the callers cannot call crew members that have been instructed to return to duty at a specified time under the respite provisions of the regulations.

Never too old to have a happy childhood!

              

  • Member since
    July 2001
  • From: Central Iowa
  • 18 posts
Posted by trainmanj on Monday, January 11, 2010 6:03 PM
I've seen the BNSF run long stack trains, but nothing like this. If it pans out well, I think we'll see an increase in grade crossings that are made to go over or under the rail.
  • Member since
    August 2006
  • From: Fullerton, CA
  • 28 posts
Posted by mphill66 on Monday, January 11, 2010 9:01 PM

 Here is a video just outside of LA on the UP LA Subdivision, running very fast

http://www.youtube.com/watch?v=zm4c0vIre9M  this one is coming right at you....

mp

  • Member since
    December 2005
  • From: MP 175.1 CN Neenah Sub
  • 4,917 posts
Posted by CNW 6000 on Tuesday, January 12, 2010 11:41 AM

tree68

OK, so I counted three sets of DPU's. 

Can they all be controlled from one unmodified head end equipped locomotive, or did this one have to have extra equipment installed?

All GEVOs...nice train!

Dan

  • Member since
    June 2007
  • 8 posts
Posted by hyrail on Tuesday, January 12, 2010 11:54 AM

nothing is ever acomplished by standing still. no new idea has never been instigated without its naysayers. if new idea were never brought forth and put to test, where would this world be today???

  • Member since
    August 2004
  • From: St. Paul, Minnesota
  • 2,116 posts
Posted by Boyd on Tuesday, January 12, 2010 6:10 PM

 People would be screaming as to how dangerous the wheel is. We all know who they would be as the "sky is falling crowd" can't think of anything productive to do.

Modeling the "Fargo Area Rapid Transit" in O scale 3 rail.

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Wednesday, January 13, 2010 10:38 AM

From Carl's data in a couple of the previous posts, it seems that this train weighed 16,000 tons over its 18,061 ft. length, for an average weight of 0.886 tons per ft. 

Similar to what I noted in the other thread about California's 'sky is falling' reaction - that's roughly equivalent to about a Cooper's E-18 loading, down far enough in the bridges structures that are longer than a couple car lengths and ignoring the locomotives, etc., etc. - I know, lots of qualifications needed here - but still. 

By another measure, the TPOB = Tons Per Operable Brake ratio would be in the range of 16,000 tons/ 295 wells = 54 TPOB - not bad or unsafe at all, considering that anything up to 100 TPOB is usually often permitted to operate unrestricted.

What I don't know - because I'm not conversant with it's route - is the magnitude of the individual grades that this train would have encountered.  The ruling grade effect, too, for this train might have been a little different from the calculated or posted standard - because it was so long, it might have draped over beyond the ends of a steep segment onto the flatter sections on either side, thus reducing the overall weighted average grade that it was exposed to at any one 'worst case' - or not.

- Paul North.

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Wednesday, January 13, 2010 2:53 PM

Paul_D_North_Jr

By another measure, the TPOB = Tons Per Operable Brake ratio would be in the range of 16,000 tons/ 295 wells = 54 TPOB - not bad or unsafe at all, considering that anything up to 100 TPOB is usually often permitted to operate unrestricted.

 

TPOB is going to depend on the equipment used.  A 5-platform articulated well car is figured at 3 brakes.  A 3-platform articulated car is 2 brakes.  There are solid drawbar connected multi platform cars as well as single well cars.  It could be as low as 54 TPOB or it could be higher. 

The number of cars/platforms also figures in for all intermodal trains.  That alone would restrict this big one to Maximum Subdivision Speed minus 10mph, no slower than 50mph.  (System instructions, there could be specific subdivision instructions that are more restrictive.)

Jeff     

 

  • Member since
    June 2001
  • From: Lombard (west of Chicago), Illinois
  • 13,681 posts
Posted by CShaveRR on Wednesday, January 13, 2010 5:28 PM
I should have gotten the TPOB when the train was running--they compute the number of brakes on these cars, so that's available. For some reason, the number 82 is sticking in my head. There are no TPOB restrictions on intermodal trains when the tonnage is that low.

I also mentioned the speed reduction in my earlier posts, saying that the train, being longer than 120 wells, would be limited to 60 m.p.h. This was making the rash assumption (not so rash, really) that timetable speed on the Sunset and T&P lines was 70. Looking at the train's progress in some places, I'd say that it hit 60 quite a bit (in the Newswire, Fred Frailey suggests that it could have gone 70. 'Fraid not).

Carl

Railroader Emeritus (practiced railroading for 46 years--and in 2010 I finally got it right!)

CAACSCOCOM--I don't want to behave improperly, so I just won't behave at all. (SM)

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, January 14, 2010 11:38 AM

jeffhergert

Paul_D_North_Jr
  By another measure, the TPOB = Tons Per Operable Brake ratio would be in the range of 16,000 tons/ 295 wells = 54 TPOB - not bad or unsafe at all, considering that anything up to 100 TPOB is usually often permitted to operate unrestricted. 

TPOB is going to depend on the equipment used.  A 5-platform articulated well car is figured at 3 brakes.  A 3-platform articulated car is 2 brakes.  There are solid drawbar connected multi platform cars as well as single well cars.  It could be as low as 54 TPOB or it could be higher. 

[snip]

Jeff  

Thanks, Jeff, for straightening me out on that one.  Thumbs Up  When I wrote the above I actually was wondering about how well cars are handled/ computed for this purpose, with the shared 4-wheel truck between the middle ends.  The best I could recall was that in the NTSB report on the CSX runaway on 17 Mile / Sandpatch a few years ago, in a footnote it defined 'brake' as a 'brake valve', which didn't seem too helpful or accurate either way for this context or application.

From a recent post by Carl over on the 'Lounge' thread:

'' . . . This train shows as having 295 cars, but it's a stack train--a lot of these cars are articulated, which translates to no slack at all between units. There were a total of 86 distinct cars on the train, which means 209 slack-free connections, 86 minimal slack connections just the slack in the couplers--not much in the draft gear) and the nine locomotives. . . .''

Since 295 wells / 86 cars = 3.43 wells or platforms per 'car' on average, it's likely that most of them were the 3-platform types.  (Mathematically, one solution would be around 67.5 3-platform cars, and 18.5 5-platform cars - please ignore the '1/2 car' issue and just choose the nearest integer numbers that you prefer.)  So, adjusting my previous TPOB ratio of 54 per Jeff's info above x 3 cars before/ 2 'brakes' now = 81 TPOB - practically the same as Carl's recalled figure of 82, and again still not a restriction on the train.

It's interesting how a statistic or metric like this enables us to quickly get a rudimentary understanding of the nature and some of the handling characteristics of a train like this.

Note that Jeff's 'equivalent brakes' information makes perfect and logical sense when you think it through.  A 3-platform car has 4 of the 4-wheel trucks - 1 at each of the 2 outer ends, and 1 at each of the 2 inner ends or connections.  Hence, those 4 trucks are pretty much the equivalent of 2 regular cars, as Jeff says.  Likewise, for the 5-platform car, just add 2 more interior trucks, for the equivalent of 3 regular cars.  That makes it simple to remember to figure out for the future - basically, just count the number of trucks in the entire train and divide by 2, or the number of axles - such as from a Hot Box Detector - and divide by 4, etc.

Thanks again for the supplementary info.

- Paul North.

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    November 2007
  • 2,989 posts
Posted by Railway Man on Thursday, January 14, 2010 1:20 PM

Paul_D_North_Jr

What I don't know - because I'm not conversant with it's route - is the magnitude of the individual grades that this train would have encountered.  The ruling grade effect, too, for this train might have been a little different from the calculated or posted standard - because it was so long, it might have draped over beyond the ends of a steep segment onto the flatter sections on either side, thus reducing the overall weighted average grade that it was exposed to at any one 'worst case' - or not.

- Paul North.

Figure 2.0% ascending, 1.8% descending, as the ruling grades en route.  Both are long enough and with sufficient speed limits to eliminate any "long train" or momentum effects.

RWM

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, January 14, 2010 1:25 PM

blownout cylinder
  What is the average grade on that route anyways? 

cacole
 In Arizona between Dragoon and Mescal there are many curves and grades of one to two percent, with the Benson, Arizona crossing of the San Pedro River being the low spot.  Dragoon is the highest point between New Mexico and Tucson, Arizona, the San Pedro River is the lowest point, and Mescal is the second-highest point.

I would not want to be the guinnea-pig engineer having to maneuver a train of this length and weight through SE Arizona. 

The best source I could find quickly on this is the profile of the Rock Island - Southern Pacific as one of the Southwestern Transcontinentals on page 42 of the April 2004 issue of Trains on Mountain Railroads.  Although that profile therefore does not include the former SP / T&P east of El Paso, Texas, here are the significant/ ruling grades as shown therein for the rest of this train's route, as I understand it (mileages below are scaled/ estimated and hence very approximate only):

El Paso, TX to Continental Divide, NM - long (100 miles) of +1.0 %

Lordsburg, NM to somewhere, AZ  - 50 miles of -1.0 %

Somewhere, AZ  to Dragoon, AZ - 50 miles of +1.0 %

Dragoon, AZ to west - 25 miles of -1.4 %

(between Dragoon and Gila appears to be around -0.8 to -1.0 % typically, with 2  short/ 10 miles upgrades in the range of +1.0 %)

Approaching Gila, AZ - 20 miles of -1.0 %

From Indio, CA to Beaumont Hill/ San Gorgonio Pass, CA - 40 miles of +2.0 %

Between Beaumont Hill/ San Gorgonio Pass, CA and Los Angeles, CA - 30 miles of -1.9 %

- Paul North.

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Thursday, January 14, 2010 1:50 PM

Undulating grades can present a significant operating problem, especially for a train this long.

I can visualize, as an example, 6000 feet ascending, the next 6000 feet decending and the last 6000 feet ascending; (or vice versa) and each segment on different percent grades. Now throw in programed speed restrictions; or much worse, a necessary application of brakes because something happens such as a eighteen wheeler high centered at a road croswsing.

 I suggest undulation is as significant, perhaps more so, than ruling grade.

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Thursday, January 14, 2010 3:18 PM

Like this:

- PDN.

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Thursday, January 14, 2010 3:34 PM

Paul_D_North_Jr

Like this:

- PDN.

  Paul, thanks for the wonderful illustration. Now picture the 18000 foot train at this location and you are the engineer!!!!
  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, January 14, 2010 4:29 PM

Paul_D_North_Jr

Like this:

- PDN.

A true test of the Engineers ability to control the slack within his train....If he doesn't keep the slack controlled he will get knuckles glaore in such territory.

Never too old to have a happy childhood!

              

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Monday, January 18, 2010 8:14 AM

diningcar
  Paul, thanks for the wonderful illustration. [snip] 

You're quite welcome - but the real credit belongs to Steve Schmollinger, who recognized it for what it was and could be, and took the photo accordingly - appparently he's been working on photos of those for a while.  The link to it on RP.net is - http://www.railpictures.net/viewphoto.php?id=202127 - where it engendered many similar comments.  This location - on the BNSF's Fort Worth Subdivision, between Bowie and Bellevue, Texas, per his caption - has to be one of the best illustrations that I've ever seen, which is why I merely 'bookmarked' it for future reference - and it came to mind immediately when I read your comment.  It would be worthwhile for someone to rent a 'cherrypicker' or 'bucket truck' and make some arrangements to park it in this vicinity - maybe on that stone driveway or road leaving the right border of the picture ? - to get a higher viewpoint to get rid of the 'viewblock' of the 2 little hills, and maybe shoot a video of a long train 'snaking' its way down this 'staircase'.  One thing about the double-stacks - with a pretty much uniform 'roofline' as with this one, it's a lot easier to see the effects and nuances of this kind of grade, as opposed to the randomly varying tops of the cars with a general freight train of mixed car types. 

See also the other significant thread on this train - "State of California investigating Evil Monster UP Intermodal Train" - at - http://cs.trains.com/trccs/forums/t/166962.aspx?PageIndex=1 , which is presently up to 5 pages.

- Paul North.

http://cs.trains.com/trccs/forums/t/166962.aspx?PageIndex=1

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    January 2008
  • 1,243 posts
Posted by Sunnyland on Monday, January 18, 2010 4:14 PM

That is unbelievable.  If they can get it to work, it will be OK, but they would definitely need extra engines throughout the train with a crewman in case of problems.  That would be a nightmare if it would break down somewhere. 

  • Member since
    December 2001
  • From: Sunny (mostly) San Diego
  • 1,920 posts
Posted by ChuckCobleigh on Monday, January 18, 2010 6:33 PM
Paul_D_North_Jr

Like this:

- PDN.

An interesting engineering challenge illustrated as well, in terms of the trade between spending the money gouging more earth out to reduce the "whoopdedoos" in the alignment as opposed to the operational risk of delays from break apart events. Even though the perspective is definitely compressed in the shot, that is still an amazing local profile. A few years ago, there was a piece in Trains about the SF/BNSF main between maybe Cadiz or Ludlow and Daggett east of Barstow having some interesting profiles that required some careful train handling as well.

Of course, what is even more interesting is the train handling of the 3.6 mile train with DP in several places, which really represents an unusual problem in the cab when traversing profiles like the one in the picture.

  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Monday, January 18, 2010 8:23 PM

When the RR's originally built what are now prominent corridors the plan was to build from A to B as quickly as possible and as inexpensively as possible. This did not then then and for many subsequent years substantially effect operations. It took many years and a more receptive management for this to change.

In 1960 when Santa Fe constructed the 44 mile Williams to Crookton line change through the Arizona mountains on its TRANSCON it was apparent that new engineering concepts would benefit operation, and those with the purse strings agreed to spend what was necessary. From Williams Jct., MP 374.6, elevation 6946, to Eagle Nest, MP 406.4, elevation 5436, a continuous one percent descending gradient (compensated for curviture) was used and then a 10,000 foot verticle curve intersected an ascending gradient of 0.88 percent. This and subsequently many other modern engineering concepts along the route are why the BNSF TRANSCON is such an efficient and trouble free operation fifty years later.

  • Member since
    October 2006
  • From: Allentown, PA
  • 9,810 posts
Posted by Paul_D_North_Jr on Tuesday, January 19, 2010 8:36 AM

ChuckCobleigh
  [snip] A few years ago, there was a piece in Trains about the SF/BNSF main between maybe Cadiz or Ludlow and Daggett east of Barstow having some interesting profiles that required some careful train handling as well.  [snip] 

This one ?

Mojave Crossing
Trains, August 1977 page 30
Santa Fe between Barstow and Needles
( ATSF, CALIFORNIA, DESERT, DIVISION, "STEINHEIMER, RICHARD", TRN )

It has a profile from Needles to Barstow on the top 1/3 pf page 38, and comments about the grades in a couple of places - typ. 1-1/2 % for 17 miles and 31 miles WB, as I recall from last night.

- Paul North.

"This Fascinating Railroad Business" (title of 1943 book by Robert Selph Henry of the AAR)
  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Tuesday, January 19, 2010 10:53 AM

The BNSF Transcon between Needles and Barstow is 168 miles of Mojave mountainess desert. This line was originally constructed by the Southern Pacific and acquired by BNSF's predecessor Santa Fe early in 1902 as part of a trade agreement.

Westward from Needles, elev. 470, to Goffs, elev. 2580, there is a 31 mile ruling ascending grade of 1.40 percent compensated. Continuing west the ruling grade (for eastward trains) decending into the desert is 1.00 percent compensated for a distance of 51 miles to the low point, elev. 604. Continuing west 82 miles to a high point of 1944 feet there is a ruling grade of 1.40 percent compensated. Then descending toward Barstow there is a 1.40 percent ruling grade (for eastwrd trains) for six miles to an elevation of 1869 feet. Barstow with an elevation of 2100 feet is then 34 miles west with no ruling grades encountered. 

The ruling grades describded above do not apply for the entire diatance between high and low elevation points but are the most extreme gradients encountered for a length sufficient to be called RULING.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy