henry6 If it hadn't been built (dug?) the Boston and Maine would never have been able to compete in the east-west traffic. It was decidedly built because there was no cheaper or more economical solution in the long or short run. Again, ROI is a contemporary investment term seeking a reason to drop dime and so it splits into a million pieces that pop back up into your hand within seconds! Before 1980 investment would be a thought process of determining if there would a profit could be gained within a time period of years instead of days. And there was no guarentee. Of course there was ROI, but it was expected over a longer period of time, not predicated on a computer model or simulation; and guarenteed to be guarenteed..
If it hadn't been built (dug?) the Boston and Maine would never have been able to compete in the east-west traffic. It was decidedly built because there was no cheaper or more economical solution in the long or short run. Again, ROI is a contemporary investment term seeking a reason to drop dime and so it splits into a million pieces that pop back up into your hand within seconds! Before 1980 investment would be a thought process of determining if there would a profit could be gained within a time period of years instead of days. And there was no guarentee. Of course there was ROI, but it was expected over a longer period of time, not predicated on a computer model or simulation; and guarenteed to be guarenteed..
Well, that's an interesting revision of history and economics.
Murphy Siding Back on track......Wouldn't the Hoosack(sp?) Tunnel be a good example of engineering marvel masking the economics of a situation? It cost $21,000,000 nearly 150 years ago. Do you think that has paid for itself?
Back on track......Wouldn't the Hoosack(sp?) Tunnel be a good example of engineering marvel masking the economics of a situation? It cost $21,000,000 nearly 150 years ago. Do you think that has paid for itself?
RIDEWITHMEHENRY is the name for our almost monthly day of riding trains and transit in either the NYCity or Philadelphia areas including all commuter lines, Amtrak, subways, light rail and trolleys, bus and ferries when warranted. No fees, just let us know you want to join the ride and pay your fares. Ask to be on our email list or find us on FB as RIDEWITHMEHENRY (all caps) to get descriptions of each outing.
Murphy - I was responding to Crandell / selector's comments about human nature, which was engendered by other comments about political involvement in the railroad business, and the virtues (or lack thereof) of democracy as reflected in said involvements, which I believe was the subject of one of RWM's early posts (somewhat disgusted, I think is a fair characterization) on this thread. More recently, Railway Man and diningcar were having an interesting dialogue about the validity of economic forecasts for proposed railroads and the like, and I thought the quote was relevant as a caution to not get too carried away with believing your own predictions in the face of a whole lot of uncertainties.
Appreciate the correciton on the quote source. I can picture the scene in my mind, but obviously I was making the wrong connection there.
Hoosac Tunnel - yes, I think it has paid for itself, even though it took 25 years or so to finish, as you probably also know. Until the NYC's Boston & Albany got over Washington Hill at the NY-Mass State Line, it was the only useful rail route west from Boston - otherwise, you had to go via NYC or Montreal. It opened up the Bay State and surrounding areas of New England to connect with the whole westward expansion, and allowed coal and farm goods to go east to there and for export, etc. It was so heavily used that it had to be electrified to deal with the coal smoke from the steam engines. That it's still in use - and Norfolk Southern recently (within the last year or so) cut a deal with Guilford/ Pan Am Rwys to upgrade it as some kind of joint venture and use it as a priority route in operation - "the "Patriot Route" is what I think they're calling it - speaks well for its continued viability and usefulness. I think it's been under-utilized as an intermodal route, but that's another topic for sure.
- Paul North.
Paul_D_North_Jr Time to trot out this quote: "Fighting a war is not an exercise in mathematics. We deal with people, not numbers. Numbers have their own special kind of perfection. People remain people no matter what we try to do with them." - Russian Gen. Col. Pavel Leonidovich Alekseyev in Tom Clancy's Red Storm Rising. [emphasis added - PDN] - Paul North.
Time to trot out this quote:
"Fighting a war is not an exercise in mathematics. We deal with people, not numbers. Numbers have their own special kind of perfection. People remain people no matter what we try to do with them." - Russian Gen. Col. Pavel Leonidovich Alekseyev in Tom Clancy's Red Storm Rising. [emphasis added - PDN]
Your other quote, that you attributed to Butch & Sundance, based on "Badges-we don't need no stinkin' badges!" (More or less), is from Treasure of the Sierra Madre. The more applicable quote from Butch and Sundance would be "Who are those people?"
Thanks to Chris / CopCarSS for my avatar.
Bucyrus henry6The problem is not democracy but human behavior. What's wrong with human behavior?
henry6The problem is not democracy but human behavior.
What's wrong with human behavior?
The answer is that humans are notoriously, even pathologically, unpredictable. Even though there is a lot of wisdom in the aphorism, "The best predictor of future behaviour is past behaviour" in the world of Industrial/Organizational Psychology, a large part of my own background, the fact is that behaviour is most affected by context, and context is heavily influenced by concurrent and immediate problems, or what are perceived to be problems.
Translated, what a person says they will do (future), and what they actually end up doing, are far too often linked only by the wilful duplicity inherent in lying. The lie will sometimes be done with full intention to lie at the time of promising, or it will become the lie when the person elects to do what they had promised not to do when the times comes to fulfill the promise. Think politicians. Some of them actually do intend to do what they say they will do, but a confluence of events and pressures at the time of fulfillment makes them take a more 'pragmatic' approach...and do the opposite.
A case in point: Liberal government in British Columbia, with its hefty majority and popularity, shoved near-sighted legislation through a couple of years back forbidding the Government from having defecit budgets....ever again. Our Premier is about to recall the Legislature to suspend that law. Go figure!
-Crandell
In looking back at rail expansion projects which, from the perspective of 2009, seem to have been poorly considered, one has to distingush between projects where the promoters should have known better, and projects which seemed justifiable based on what the promoters knew or could reasonably anticipate at the time, but ultimately proved otherwise. Certainly, some of the investments in new rail facilities in the late 19th and early 20th century had all of the trappings of speculative "bubbles" which, as bubbles are wont to do, ultimately burst. And it wasn't only the steam railroads. Much of the investment in interuruban electric railroads would also fall into this category.
However, even the most conservative railroad investor around the turn of the last century could not have reasonably foreseen the explosive development in highway transportation which was to come and completely alter the face of railroading. An investor at that time could have reasonably assumed that railroads would continue indefinitely to be the country's primary transportation infrastructure, and that both rail freight and passenger traffic would continue to grow by leaps and bounds as the nation grew. Seen in this light, many (but not all) of the investments in additional main lines that now seem foolish may have seemed reasonable and prudent. Investments in branch lines would also have seemed reasonable in a pre-highway era when branch line networks were important sources of traffic.
Numbers are great but, as someone else said, numbers are only as good as the assumptions behind them. If the underlying assumptions prove wrong, the numbers aren't worth the paper they're written on. Unfortunately, it's hard to predict the future, particularly over the life of a long-lived investment like a railroad. And it's not only railroads. Look, for example, at the major newspapers like the Chicago Tribune (now bankrupt) that made big investments in new printing plants just as the internet era was about to burst upon them.
Railway Mandiningcar Numbers - Numbers! It is nice to have methods and formulas which provide satisfaction that we are about to do the right thing. But the source of and reliability of the basic assumption numbers which are applied to the methods and formulas is where the great potential for erronious results lie. This is especially true when applied to line changes or major yard construction projects after the RR has established itself as a viable enterprise. It was not so apparent in the 19th century when RR's were built into yet undeveloped locales. With the initial RR construction to locations where no RR existed the potential was perhaps more speculation than science. Thus encentives such as Land Grants were offered as an ingrediant to ROI. And the abandonment of entire RR's or branch lines constructed in the 19th century is indicative of assumptions or speculations which proved erronious. ROI could be computed in the 19th century but assumption numbers were very speculative. IRR (internal rate of return) was measured with alternatives in another business or the stock and bond market, if indeed IRR was even considered by other than the very astute investors. Todays RR's must use IRR to compare projects which compete for investment funds and the "savings" or "additional revenue" numbers must be checked by a "post audit" to ascertain how the results compare to the assumptions. A prime example of a failed investment (and in fairness not a bad assumption which could be foreseen) was the Santa Fe's investments in the 1970's at Oklahoma City which enabled it to exclusively serve a new General Motors assembly plant that is closed and will not reopen. Savings which justify expenditure are a principal source of error (or manipulation by those wanting their project approved). Post audits are necessary to find that, for example, the reduction of two swich engine assignments, or any other saving actually occurred. Also, IRR evaluates the "time value" of the assumption numbers. Thus a saving of $100,000.00 per year today is, if continuous, worth perhaps $5000.00 per year in 15 years dependant upon the interest rate assumed. It is a complicated scene competing for investment dollars and it appears to me that today's major RR's are very astute with their choices. I couldn't more agree with your analysis, insights, and conclusion. I would add only - and curious to see how you respond -- that as the business model of railroading became better developed it is not unreasonable to increase one's expectations of due diligence by the promoters. It's one thing to poorly locate a line in 1860 when little is known about the traffic potential and the political stability of the nation is sketchy, and another to poorly locate a line in 1903 when the industry has a half-century of experience under its belt and the nation over a century of rule-of-law. Excusing an illbegotten extension in 1870 is one thing, extending the same excuse to a George Gould in 1903 makes my eyebrows go up. I like very much your sentence about IRR being considered only by the most astute investors, if even them. That's a measure that eludes most people even today, a reason why I couldn't fathom investing one cent in real estate during the last ten years -- I couldn't predict where the top was and I didn't want to buy just before it. I'm a long-term kind of guy whose satisfied with very modest returns. I had several discussions about strategy at work yesterday where I tried to get them to consider IRR on several alternative investments of our resources. No luck on getting through, alas.
diningcar Numbers - Numbers! It is nice to have methods and formulas which provide satisfaction that we are about to do the right thing. But the source of and reliability of the basic assumption numbers which are applied to the methods and formulas is where the great potential for erronious results lie. This is especially true when applied to line changes or major yard construction projects after the RR has established itself as a viable enterprise. It was not so apparent in the 19th century when RR's were built into yet undeveloped locales. With the initial RR construction to locations where no RR existed the potential was perhaps more speculation than science. Thus encentives such as Land Grants were offered as an ingrediant to ROI. And the abandonment of entire RR's or branch lines constructed in the 19th century is indicative of assumptions or speculations which proved erronious. ROI could be computed in the 19th century but assumption numbers were very speculative. IRR (internal rate of return) was measured with alternatives in another business or the stock and bond market, if indeed IRR was even considered by other than the very astute investors. Todays RR's must use IRR to compare projects which compete for investment funds and the "savings" or "additional revenue" numbers must be checked by a "post audit" to ascertain how the results compare to the assumptions. A prime example of a failed investment (and in fairness not a bad assumption which could be foreseen) was the Santa Fe's investments in the 1970's at Oklahoma City which enabled it to exclusively serve a new General Motors assembly plant that is closed and will not reopen. Savings which justify expenditure are a principal source of error (or manipulation by those wanting their project approved). Post audits are necessary to find that, for example, the reduction of two swich engine assignments, or any other saving actually occurred. Also, IRR evaluates the "time value" of the assumption numbers. Thus a saving of $100,000.00 per year today is, if continuous, worth perhaps $5000.00 per year in 15 years dependant upon the interest rate assumed. It is a complicated scene competing for investment dollars and it appears to me that today's major RR's are very astute with their choices.
Numbers - Numbers! It is nice to have methods and formulas which provide satisfaction that we are about to do the right thing. But the source of and reliability of the basic assumption numbers which are applied to the methods and formulas is where the great potential for erronious results lie. This is especially true when applied to line changes or major yard construction projects after the RR has established itself as a viable enterprise. It was not so apparent in the 19th century when RR's were built into yet undeveloped locales.
With the initial RR construction to locations where no RR existed the potential was perhaps more speculation than science. Thus encentives such as Land Grants were offered as an ingrediant to ROI. And the abandonment of entire RR's or branch lines constructed in the 19th century is indicative of assumptions or speculations which proved erronious. ROI could be computed in the 19th century but assumption numbers were very speculative. IRR (internal rate of return) was measured with alternatives in another business or the stock and bond market, if indeed IRR was even considered by other than the very astute investors.
Todays RR's must use IRR to compare projects which compete for investment funds and the "savings" or "additional revenue" numbers must be checked by a "post audit" to ascertain how the results compare to the assumptions. A prime example of a failed investment (and in fairness not a bad assumption which could be foreseen) was the Santa Fe's investments in the 1970's at Oklahoma City which enabled it to exclusively serve a new General Motors assembly plant that is closed and will not reopen. Savings which justify expenditure are a principal source of error (or manipulation by those wanting their project approved). Post audits are necessary to find that, for example, the reduction of two swich engine assignments, or any other saving actually occurred.
Also, IRR evaluates the "time value" of the assumption numbers. Thus a saving of $100,000.00 per year today is, if continuous, worth perhaps $5000.00 per year in 15 years dependant upon the interest rate assumed. It is a complicated scene competing for investment dollars and it appears to me that today's major RR's are very astute with their choices.
I couldn't more agree with your analysis, insights, and conclusion. I would add only - and curious to see how you respond -- that as the business model of railroading became better developed it is not unreasonable to increase one's expectations of due diligence by the promoters. It's one thing to poorly locate a line in 1860 when little is known about the traffic potential and the political stability of the nation is sketchy, and another to poorly locate a line in 1903 when the industry has a half-century of experience under its belt and the nation over a century of rule-of-law. Excusing an illbegotten extension in 1870 is one thing, extending the same excuse to a George Gould in 1903 makes my eyebrows go up.
I like very much your sentence about IRR being considered only by the most astute investors, if even them. That's a measure that eludes most people even today, a reason why I couldn't fathom investing one cent in real estate during the last ten years -- I couldn't predict where the top was and I didn't want to buy just before it. I'm a long-term kind of guy whose satisfied with very modest returns.
I had several discussions about strategy at work yesterday where I tried to get them to consider IRR on several alternative investments of our resources. No luck on getting through, alas.
RWM, To follow-on with a response about decisions made after a RR was an established entity:
My incomplete analysis is two-fold;
1.Many, perhaps most, RR executives in the 20th century (up to the late 80's) were not that astute. Many having risen through the ranks were not inclined to hire those with an understaning of investment principals because "we are successful and have always done it that way". And to be fair, investment bankers and Wall Street analyists did not recognize this weakness and pressure them to "become modern". Also, ICC regulation provided a crutch upon which to lean, which is another story to complex to address here.. The Staggers Act made them compete in the marketplace and by the late 1980's they began to become serious about marketing their business and making better investment decisions.
2. Many good investment decisions were made in the 20th century. Some were lucky as their value became apparent with the changing of our complex economy, ie., Santa Fe's decision to construct, in 1937, 235 miles of new track between Amarillo, TX and Las Animas Jct. This line had little business until coal became a major transportation commodity. It is now the major BNSF route for loaded coal trains to Texas because of its favorable grades and shorter distance.
A wise and apparently well analized project which does not fit into the "luck" catagory was Santa Fe's decision made shortly after 1900 to build the Belen Cutoff which is now the center of BNSF's Transcon. Santa Fe had as their access to California's development their line from Chicago through Kansas City, La Junta and Albuquerque which had both Raton and Glotieta Passes on it. Santa Fe had built south into Oklahoma and Texas from Kansas and were obviously unable to compete with the SP for California traffic and so President Ripley started this 275 mile new rail line, which because of financing difficulties took ten years to complete. It immediately began to function as intended.
As I initially said, very incomplete, but perhaps some perspective.
Paul_D_North_JrRWM, diningcar, & others - Something else we ought to keep in mind is that railroad lines do not necessarily have to survive forever in order to be commercially successful, much as we might wish for them to do so (as most of us also do for ourselves personally). It is entirely reasonable and practical to build a line for a known and anticipated limited useful life, with the expectation that all operating expenses will be paid, and that the capital so invested will be completely recovered, together with a commensurate Return On Investment (ROI). [Note that "profit" is 1 component of that, but a purely economic return or "rental" of the money is another, together with a risk reward, and a few other components that I can't recall just now - and which are beyond the scope of this discussion anyway.] One example that I think we can all accept are logging railroads and branch lines - we don't view them all as failures just because they were pulled up a few years after being laid, when they'd outlived their economic usefulness. Another example was a railroad that was built by David Moffat to serve Leadville, Colorado, I believe, just a few months before another competing RR with a much better route got there and essentially put Moffat's line out of business by being able to charge less. During its brief existence, Moffat's line was able to make enough money to recover its costs. [I'm writing this from memory - my source is Harold A. Boner's The Moffat Road, and it's at home, not here. RWM, I recall from prior posts that you're familiar with mining and that area, so you may have a different view of this - I have no knowledge independent of Boner's recounting of it, so I'll understand if you disagree. But I'll try to provide the specifics in a later post.] Accordingly, not every line that we're discussing here may be a failure. As RWM has requested for the Lackawanna Cut-Offs, we ought to look at the figures - if available - for each such line, before judging its promoters and engineers too harshly. On the other hand, yeah, some of them deserve it - "We don't need no stinkin' numbers*" to confirm that ! - Paul North. * - Adapted from the movie Butch Cassidy and The Sundance Kid, if I recall correctly.
RWM, diningcar, & others -
Something else we ought to keep in mind is that railroad lines do not necessarily have to survive forever in order to be commercially successful, much as we might wish for them to do so (as most of us also do for ourselves personally). It is entirely reasonable and practical to build a line for a known and anticipated limited useful life, with the expectation that all operating expenses will be paid, and that the capital so invested will be completely recovered, together with a commensurate Return On Investment (ROI). [Note that "profit" is 1 component of that, but a purely economic return or "rental" of the money is another, together with a risk reward, and a few other components that I can't recall just now - and which are beyond the scope of this discussion anyway.]
One example that I think we can all accept are logging railroads and branch lines - we don't view them all as failures just because they were pulled up a few years after being laid, when they'd outlived their economic usefulness.
Another example was a railroad that was built by David Moffat to serve Leadville, Colorado, I believe, just a few months before another competing RR with a much better route got there and essentially put Moffat's line out of business by being able to charge less. During its brief existence, Moffat's line was able to make enough money to recover its costs. [I'm writing this from memory - my source is Harold A. Boner's The Moffat Road, and it's at home, not here. RWM, I recall from prior posts that you're familiar with mining and that area, so you may have a different view of this - I have no knowledge independent of Boner's recounting of it, so I'll understand if you disagree. But I'll try to provide the specifics in a later post.]
Accordingly, not every line that we're discussing here may be a failure. As RWM has requested for the Lackawanna Cut-Offs, we ought to look at the figures - if available - for each such line, before judging its promoters and engineers too harshly. On the other hand, yeah, some of them deserve it - "We don't need no stinkin' numbers*" to confirm that !
* - Adapted from the movie Butch Cassidy and The Sundance Kid, if I recall correctly.
Paul -- My earlier example of a logging railway is precisely what you're talking about for a temporary railway facility. All Wellington was arguing for is, "please, this is about money, not about curve geometry and big bridges, and by applying those lessons assiduously we perform a greater social good than just enriching ourselves at the expense of others."
The example of David Moffat is Cripple Creek, Colorado, but while Boner was correct in that there is a business case for a low-cost-of-construction, short-term, high-profit railroad to a cost-no-object traffic source, he misapplied it to Cripple Creek and apparently had only a dim idea of Moffat's business methods. David Moffat was a shrewd investor of regional significance who made a great deal of money trafficking in the greed and ignorance of others, and was not ethically challenged by things such as jury tampering. See the book "A Mine to Make a Mine, Financing the Colorado Mining Industry, 1859-1902" by Joseph E. Smith.
RWM
diningcar Numbers - Numbers! It is nice to have methods and formulas which provide satisfaction that we are about to do the right thing. But the source of and reliability of the basic assumption numbers which are applied to the methods and formulas is where the great potential for erronious results lie. This is especially true when applied to line changes or major yard construction projects after the RR has established itself as a viable enterprise. It was not so apparent in the 19th century when RR's were built into yet undeveloped locales........ ......... A prime example of a failed investment (and in fairness not a bad assumption which could be foreseen) was the Santa Fe's investments in the 1970's at Oklahoma City which enabled it to exclusively serve a new General Motors assembly plant that is closed and will not reopen.
Numbers - Numbers! It is nice to have methods and formulas which provide satisfaction that we are about to do the right thing. But the source of and reliability of the basic assumption numbers which are applied to the methods and formulas is where the great potential for erronious results lie. This is especially true when applied to line changes or major yard construction projects after the RR has established itself as a viable enterprise. It was not so apparent in the 19th century when RR's were built into yet undeveloped locales........
......... A prime example of a failed investment (and in fairness not a bad assumption which could be foreseen) was the Santa Fe's investments in the 1970's at Oklahoma City which enabled it to exclusively serve a new General Motors assembly plant that is closed and will not reopen.
diningcarNumbers - Numbers! It is nice to have methods and formulas which provide satisfaction that we are about to do the right thing. But the source of and reliability of the basic assumption numbers which are applied to the methods and formulas is where the great potential for erronious results lie. This is especially true when applied to line changes or major yard construction projects after the RR has established itself as a viable enterprise. It was not so apparent in the 19th century when RR's were built into yet undeveloped locales. With the initial RR construction to locations where no RR existed the potential was perhaps more speculation than science. Thus encentives such as Land Grants were offered as an ingrediant to ROI. And the abandonment of entire RR's or branch lines constructed in the 19th century is indicative of assumptions or speculations which proved erronious. ROI could be computed in the 19th century but assumption numbers were very speculative. IRR (internal rate of return) was measured with alternatives in another business or the stock and bond market, if indeed IRR was even considered by other than the very astute investors. Todays RR's must use IRR to compare projects which compete for investment funds and the "savings" or "additional revenue" numbers must be checked by a "post audit" to ascertain how the results compare to the assumptions. A prime example of a failed investment (and in fairness not a bad assumption which could be foreseen) was the Santa Fe's investments in the 1970's at Oklahoma City which enabled it to exclusively serve a new General Motors assembly plant that is closed and will not reopen. Savings which justify expenditure are a principal source of error (or manipulation by those wanting their project approved). Post audits are necessary to find that, for example, the reduction of two swich engine assignments, or any other saving actually occurred. Also, IRR evaluates the "time value" of the assumption numbers. Thus a saving of $100,000.00 per year today is, if continuous, worth perhaps $5000.00 per year in 15 years dependant upon the interest rate assumed. It is a complicated scene competing for investment dollars and it appears to me that today's major RR's are very astute with their choices.
Railway Manbut it didn't have a single branch,
I might comment the WM did have trackage rights from Rockwood north thru Somerset and on over the Boswell Branch of {then B&O}, to Gray, Pa., to pull coal out of that mining facility. This was back some decades ago. The R of W up into Gray can still be found if one has knowledge where to look. I have seen WM engines up in there pulling out loads of coal to take back to Rockwood and to the main line.
Edit: Above quote came up as "RWM", but believe it was Paul's....
Quentin
Paul_D_North_JrRWM - To add to your list of early 20th-century first-order errors (above), I'll suggest the Western Maryland RR's Connellsville Extension (or whatever they called it), along the Potomac & other rivers from Cumberland, MD towards (but not quite to) Pittsburgh, PA. It was magnificently engineered with several wonderfully long and huge truss bridges and trestle / viaducts, and even bypassed the B&O's (now CSX) Sand Patch grades with a shorter route, but it didn't have a single branch, and basically paralleled the B&O the whole way. Even after acquiring the WM, CSX's predecessor still chose to keep the old alignment. It's been abandoned and torn up about 20 - 25 years now, and is now a great rail-trail. Much the same could be said about the rest of the abandoned WM, from Hagerstown to Cumberland, but at least at Cumberland there was a major branch to the southwest that justified the existence that portion. I still want to respond to and clarify some other points of our above discussion yesterday of location vs. alignment in economic terms, streams, traffic sources, etc., but time constraints preclude that right at the moment - maybe later on this evening. - Paul North.
RWM -
To add to your list of early 20th-century first-order errors (above), I'll suggest the Western Maryland RR's Connellsville Extension (or whatever they called it), along the Potomac & other rivers from Cumberland, MD towards (but not quite to) Pittsburgh, PA. It was magnificently engineered with several wonderfully long and huge truss bridges and trestle / viaducts, and even bypassed the B&O's (now CSX) Sand Patch grades with a shorter route, but it didn't have a single branch, and basically paralleled the B&O the whole way. Even after acquiring the WM, CSX's predecessor still chose to keep the old alignment. It's been abandoned and torn up about 20 - 25 years now, and is now a great rail-trail.
Much the same could be said about the rest of the abandoned WM, from Hagerstown to Cumberland, but at least at Cumberland there was a major branch to the southwest that justified the existence that portion.
I still want to respond to and clarify some other points of our above discussion yesterday of location vs. alignment in economic terms, streams, traffic sources, etc., but time constraints preclude that right at the moment - maybe later on this evening.
Excellent example. The location was poor. There was no traffic source to pay for all that construction.
diningcar Numbers - Numbers! It is nice to have methods and formulas which provide satisfaction that we are about to do the right thing. But the source of and reliability of the basic assumption numbers which are applied to the methods and formulas is where the great potential for erronious results lie. This is especially true when applied to line changes or major yard construction projects after the RR has established itself as a viable enterprise. It was not so apparent in the 19th century when RR's were built into yet undeveloped locales. With the initial RR construction to locations where no RR existed the potential was perhaps more speculation than science. Thus encentives such as Land Grants were offered as an ingrediant to ROI. And the abandonment of entire RR's or branch lines constructed in the 19th century is indicative of assumptions or speculations which proved erronious. ROI could be computed in the 19th century but assumption numbers were very speculative. IRR (internal rate of return) was measured with alternatives in another business or the stock and bond market, if indeed IRR was even considered by other than the very astute investors. [snipped]
With the initial RR construction to locations where no RR existed the potential was perhaps more speculation than science. Thus encentives such as Land Grants were offered as an ingrediant to ROI. And the abandonment of entire RR's or branch lines constructed in the 19th century is indicative of assumptions or speculations which proved erronious. ROI could be computed in the 19th century but assumption numbers were very speculative. IRR (internal rate of return) was measured with alternatives in another business or the stock and bond market, if indeed IRR was even considered by other than the very astute investors. [snipped]
We should keep in mind that much of the railroad construction in the late 1800's and early 1900's was essentially the "venture capital" segment or the equivalent of today's Silicon Valley businesses of the era - as BaltACD said, the "rocket science" and "brain surgery" of the day. So we should not be too surprised that the failure rate and "cannibalization" following was fairly high - railroading was by no means a mature science or a settled business.
Railway Man [much snipped] Examples of what I would list as first-order errors include new construction and heavy line changes: Milwaukee Road Puget Sound Extension Colorado Midland Western Pacific Lackawanna Cut-Off (possibly, but I'm not sufficently familiar with the traffic potential of this very densely packed and complicated area to be sure) The Missouri Pacific-funded heavy reconstruction of the D&RGW Royal Gorge Route alignment between 1923 and 1929. C&O Chicago Extension (possibly). [more snips] RWM
Examples of what I would list as first-order errors include new construction and heavy line changes:
[more snips]
As I review the ROI question and my responses, I also come up with the question: ROI aside, what would have happened to railroads in the 20th Century, especially eastern railroads, if they had not re-engineered their plants in the early 1900's?
Deggesty Murphy, I don’t know that the Lucin Cutoff could have been better located; its location is certainly superior to that of the original line in that it eliminated much mountain running with curves and grades and distance (48 miles shorter). Since the route is across open water, it is subject to wave damage as well as wind damage, and is not cheap to maintain. After the causeway was constructed, replacing much of the original trestle, with two culverts to carry water between the north and south arms of the lake, it was discovered that the culverts did not allow sufficient waterflow to prevent a much higher salt buildup in the south arm (more freshwater comes into the northern arm), so the causeway was breached about twenty-six years ago to increase the waterflow. The WP’s route, around the south end of the lake, also called for some high maintenance twenty-six years ago when there was an early snowmelt on the west side of the Wasatch; the waves were lapping at the track. Johnny
Murphy, I don’t know that the Lucin Cutoff could have been better located; its location is certainly superior to that of the original line in that it eliminated much mountain running with curves and grades and distance (48 miles shorter). Since the route is across open water, it is subject to wave damage as well as wind damage, and is not cheap to maintain. After the causeway was constructed, replacing much of the original trestle, with two culverts to carry water between the north and south arms of the lake, it was discovered that the culverts did not allow sufficient waterflow to prevent a much higher salt buildup in the south arm (more freshwater comes into the northern arm), so the causeway was breached about twenty-six years ago to increase the waterflow.
The WP’s route, around the south end of the lake, also called for some high maintenance twenty-six years ago when there was an early snowmelt on the west side of the Wasatch; the waves were lapping at the track.
Johnny
tree68 Paul - Funny you should mention the river thing. One of our regular local runs follows a river fairly closely for most of its route, crossing said river three times in the process.
One other very important and practical reason for the early railroads to follow the streams, which I forgot to mention yesterday:
Those steam locomotives needed a ready source of a lot of water to operate properly (since we never adopted the use of exhaust-steam condensing locomotives on any wide-scale basis).
DeggestyMurphy Siding I've picked up bits and pieces in this thread, suggesting that some monumental engineering projects could have been less costly, if perhaps the lines were laid out differently. What were some of those? Off the top of my head, I'm thinking of things like the Starrucca Viaduct, or Moffet Tunnel, or Lucien Cut-off(?) I'm giving the engineers the benefit of the doubt, assuming that they made the best decisions, most of the time. (But then, I sometimes work with architects, who are good examples of puttingego before common sense.) Murphy, I don’t know that the Lucin Cutoff could have been better located; its location is certainly superior to that of the original line in that it eliminated much mountain running with curves and grades and distance (48 miles shorter). Since the route is across open water, it is subject to wave damage as well as wind damage, and is not cheap to maintain. After the causeway was constructed, replacing much of the original trestle, with two culverts to carry water between the north and south arms of the lake, it was discovered that the culverts did not allow sufficient waterflow to prevent a much higher salt buildup in the south arm (more freshwater comes into the northern arm), so the causeway was breached about twenty-six years ago to increase the waterflow. The WP’s route, around the south end of the lake, also called for some high maintenance twenty-six years ago when there was an early snowmelt on the west side of the Wasatch; the waves were lapping at the track. Johnny
Murphy Siding I've picked up bits and pieces in this thread, suggesting that some monumental engineering projects could have been less costly, if perhaps the lines were laid out differently. What were some of those? Off the top of my head, I'm thinking of things like the Starrucca Viaduct, or Moffet Tunnel, or Lucien Cut-off(?) I'm giving the engineers the benefit of the doubt, assuming that they made the best decisions, most of the time. (But then, I sometimes work with architects, who are good examples of puttingego before common sense.)
I've picked up bits and pieces in this thread, suggesting that some monumental engineering projects could have been less costly, if perhaps the lines were laid out differently. What were some of those? Off the top of my head, I'm thinking of things like the Starrucca Viaduct, or Moffet Tunnel, or Lucien Cut-off(?) I'm giving the engineers the benefit of the doubt, assuming that they made the best decisions, most of the time. (But then, I sometimes work with architects, who are good examples of puttingego before common sense.)
All good observations.
I hope this doesn't come across as picky, but terminology is important and the Lucin Cut-off is properly described as a "line change" not a "relocation." A line change improves or revises the line but there is no fundamental change in the function, traffic equation, or economic equation of the railway facility. A relocation, in contrast, is a reassessment of the original business model. An example of a relocation is the D&RGW relegating its original narrow-gauge main line via Marshall Pass to branch-line status and constructing a new standard-gauge main line via Tennessee Pass, in order to begin participating in transcontinental traffic flows, and emerging from a purely local/regional business model into a national business model.
There are some of us who think that the Lucin Cut-off wasn't a great idea. The major problem is that the fill is continuously sinking into the lake bottom because it is denser than the mud bottom of the lake. As a result the lake bottom has actually been displaced and pushed up to the point where it breaks through the water surface on either side of the fill! What is now known is that the original M-K constructed fill of the D.J. Russell era was very marginal from a geotechnical point of view, barely in equilibrium with the weight-bearing capacity of the lake bottom. Subsequent additions of rock to the fill to get its height above the 1983 lake rise increased its weight to the point where the lake bottom has transistioned from stable to plastic, and gone into motion that once started doesn't want to stop. The mud is several thousand feet thick, and in effect the battle to add rock to the fill is an effort to fill the entire basin with rock. If the lake level rises abruptly again as it did in 1983, it may become physically impossible to add rock faster than the water rises and the fill sinks, and we may be seeing a recapture of the original alignment via Promontory Pass, or a permanent diversion to the former WP.
henry6 Would not the prosperity of the railroads mentioned be indicative of the value of the investment?
Would not the prosperity of the railroads mentioned be indicative of the value of the investment?
Would not the prosperity of the railroads mentioned be indicative of the value of the investment? The roads were able to operate heavier locomotives, longer trains, at faster point to point speeds than they were able to on the twisted, up and down, longer routes they replaced. A Mountain or Northern or Wyoming or Berkshire would never have been able to deliver the larger sized loads in the same performed if it were not for the improvements like the lack of or enlargment of tunnels, the relief of grades, the elimination of circles and circles of curves, and the strenghtening of or replacement of bridges. Look at the tables presented in the Tabers' work. It is obvious that the cost of the improvements paid off. If they hadn't, those lines would never have reached the 20's much less weatherd the 30's and handled the 40s ans survived into the 50s. The PRR and NYC roads and thier own investments would have killed off any competition which hadn't likewise improved. We work in a world today in which bits and bytes intrpret and predict...if the computer doesn't say so, it ain't so. So many buisnesses which operate only off computer read outs die and quick death. Those who have a gut or feel or talent or bent or whatever you want to call it for thier business will succeed because they; look beyond the bits and bytes for the answers. I have seen many small businesses close within a year of inception because the ownersunderstood only the computer numbers but neither the business itself nor the customers they sought to serve.
henry6 Checked another book: The Lackawanna Railroad in Northwest New Jersey by Larry Lowenthal and William T. Greenberg, Jr. and they also expouse the virtues and resulting abilities and yields of modernizing the plant rather than checking in with ROI figures. What I am beginning to feel is that today's engineers, like so many of today's investors, are so consumed by short term ROI as the guidepost by which all is done, that overall improvement and long term investment have not entered into contemporary business decsions at all.
Checked another book: The Lackawanna Railroad in Northwest New Jersey by Larry Lowenthal and William T. Greenberg, Jr. and they also expouse the virtues and resulting abilities and yields of modernizing the plant rather than checking in with ROI figures. What I am beginning to feel is that today's engineers, like so many of today's investors, are so consumed by short term ROI as the guidepost by which all is done, that overall improvement and long term investment have not entered into contemporary business decsions at all.
Checked another book: The Lackawanna Railroad in Northwest New Jersey by Larry Lowenthal and William T. Greenberg, Jr. and they also expouse the virtues and resulting abilities and yields of modernizing the plant rather than checking in with ROI figures. What I am beginning to feel is that today's engineers, like so many of today's investors, are so consumed by short term ROI as the guidepost by which all is done, that overall improvement and long term investment have not entered into contemporary business decsions at all. None of that has to do with the quality of 19th Century engineering and design toward longevity but reveals that today's short term goals and design either lead to poor quality or reflects the short sightedness on the part of our Salons of Commerce! But again, Don Phillips latest column states that railroad companies have moved toward the 1900 era of thought investingin modernizing and improvments to be prepared in the long term for what is to come. Ironically it comes in the same decade of the 21st Century!
I would like to comment on one part of "1880's railroad engineering", and that is of the steel structures (bridges). By 1880 or soon thereafter these structures were not designed "by the seat of the pants". They were designed for certain conditions and loadings (L3, L4, etc) depending on the railroad input regarding equipment to travel on the road. Most were through truss and/or plate girder designs. Structural Engineers would use this input to analyze the forces on the members and size them accordingly. Truss analysis is very accurate in that the forces are "determinatable", therefore most long spans were truss type. Plate girders were most often used on approach spans and short span conditions. They are more complicated to design in that there are secondary forces (moments) that are "indeterminate", but there were accurate design methods for these back then, also. The accepted design standard was (and is) to load steel members to approx 2/3 of the expected yield of the steel. This is a large safety factor and many 1900 bridges are still in use today. True, some have been reinforced but many are as they were built. I just wanted say that steel structure design methods were quite advanced in the period dicussed in this thread. There is an 1895 three span swing truss bridge across the Coosa River in Gadsden, AL, where I live, that carries grain trains with 3 to 4 SD-45's for power. It is easy to see all of the bridge very close and there is no sign of additions or modification. It could use a paint job but CSXT said they had better places to spend their money and assured the City of Gadsden that is was structually sound and that they inspected it regularly.
Northtowne
Paul_D_North_JrThanks for asking, and the opprtunity to think this through a little bit - I hope this is responsive to your inquiry
Paul....an excellent response. Enjoyed every bit of it. The South Penn has been an interest of mine since a very young fellow.....If you do get the chance to travel thru on the Turnpike in daylight you might keep a lookout for old alignments from the South Penn, as they are still visible in the area {in general}, between Allegheny tunnel and Donegal area at locations where the Turnpike is not positioned right on the old alignment.
And lots of mileage is not....The South Penn was attacking the Allegheny and Laurel Hill ranges with a max of 2% and the Turnpike softened that to 3% max....So the old alignment is more circuitous that allowed the two alignments to enter the same tunnel locations that were started back in the 1885 event.
One thing for sure.....They did not follow any creeks or streams thru this general area.....Somerset County is a Plateau of roughly 2,000' elevation and the mountain ridges at the east and west ends....
And yes, Mule Shoe entered into this area {of the Pennsy alignment}, and was used up to a decade or so ago....prehaps 2 decades now.....
Railway Man You've seen the ROIs? What were they, out of curiosity? I threw the DL&W onto the list as a possible example not because I know of its ROI, but because I'm curious. It was an expensive project. I'm aware the new line was an engineering improvement but I'm not aware if it was an economic improvement, nor has the railfan press ever bothered to answer that question that I know of. I'd like to see numbers that satisfy the question -- then we'd know if it was a monument to clear thinking or a monument to clients' ego and consultants' fees. RWM
You've seen the ROIs? What were they, out of curiosity? I threw the DL&W onto the list as a possible example not because I know of its ROI, but because I'm curious. It was an expensive project. I'm aware the new line was an engineering improvement but I'm not aware if it was an economic improvement, nor has the railfan press ever bothered to answer that question that I know of. I'd like to see numbers that satisfy the question -- then we'd know if it was a monument to clear thinking or a monument to clients' ego and consultants' fees.
Checking through both Taber and Taber and Young, neither books go into ROI statistics but explain the Cut Offs in larger terms of modernizing the railroad allowing for bigger and heavier locomotives, longer and heavier trains, and faster speeds for both passenger and frieght all as part of the benefits of the projects. Taber and Taber offer tables on revenue and profitablity of the Erie, CNJ, LV, and DL&W as a result of their modernization programs from 1900 to 1914 to 1926 on Page 53 of DL&W in the 20th Century, Vol. 1 in a general discussion of the benefits of the programs on the same pages. The whole chapter is devoted to all the modernization programs including both Cut Offs, other concrete bridges, fills, and additional tracks which were added. Young in his Tunkhannock, The Great White Bridge revised and reprinted in 2005 also extols the effeciencies achieved and allowed rather than an ROI figure.
But, using that information, backed by how railroads were "rationalized" in the early and mid 1800's, replaces the need for an ROI. Railroads in the East were built on routes that went to the natural rescources which were needed in the larger, coastal cities. And they were often built through cities and towns where financing was offered rather than because the cities and towns were in the path between two distant points. Plus railroad fever of the time demanded a railroad in everytown no matter what. That was the East from 1840 to 1890, So engineering was done to meet the need of then and there. When all was laid out, by 1895-1900, new engineering was able to step in and undo the bad in places, and look at the emerging prospect of moving freight and passengers to and from the coast and mid and far west rather than just from the mountains to the Atlantic, and be a 20th Century railroad.. Yes, the Erie Canal, and by concept the Erie Railroad, were midwest to coast links. But the Erie, its components, and virtually all other rail lines, were built to local needs of the time first. The new Century needed a total revamping of the railroad system before the Century began. It is almost like Phillip's latest TRAINS column is a report on a 21st Century repeat of railroad improvement projects.
samfp1943 To pose another position; the early railroad construction IMHO was built in a race for expediency. To construct a railline; to go from point A to B, first, to prove it could be done, and secondly garner the rewards of more and better funding., To capturing the travelers, and freight between those two points. With labor back then as cheap, and somewhat available as it apparently was; with the loadings fairly light. The requirements of the types of cars and locomotives, being fairly forgiving of the 'fast and dirty' laid track. The first idea was to make the mosr money and then improve the structure as traffic demanded, serviceability and not longevity was the apparent goal. Only after a line could prove its ability to earn for its company did the strengthening and overbuilding take place.
The requirements of the types of cars and locomotives, being fairly forgiving of the 'fast and dirty' laid track. The first idea was to make the mosr money and then improve the structure as traffic demanded, serviceability and not longevity was the apparent goal. Only after a line could prove its ability to earn for its company did the strengthening and overbuilding take place.
As Confederate Cavalry General Nathan Bedford Forrest once supposedly said, military victory most often goes to "...whoever gets there firstest with the mostest..." [from an Army Logistics Command webpage, appropriately enough - see: http://www.almc.army.mil/alog/issues/MarApr97/systems.htm ; emphasis added - PDN] Also: "A good track today is better than a perfect track tomorrow", to paraphrase Gen. George S. Patton, Jr.
In this context, it's worth remembering that - which was not always known or done back in the day - especially with regard to the logistics problem. Until the railroad was actually built and in place, it was very difficult to get all those supplies, materials, and equipment for the construction far enough out in advance to avoid delaying that operation. Once the railroad was up and running, though, it was much easier and cheaper do anything, esp. to get the big, heavy, and long things - like steel bridge pieces - out to where they were needed. Then dhe rebuilding or relocation could hopefully be done more deliberately and purposefully for the circumstances, esp. once the revenue stream had started coming in. But until the system was connected and operating, it just wasn't practical to get that or such things as tunnels done far enough or long enough in advance. In effect, the railroad was its own lifeline. Once built, it could always be improved. But a railroad that stopped even a few mile short of its goal didn't accomplish and wasn't worth much.
Our community is FREE to join. To participate you must either login or register for an account.