Sunset Route Two-Tracking Updates

1725599 views
8397 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Friday, June 7, 2013 10:03 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “K” (of H-N, Overall A-S)

Finally, workers start moving around again.


A water truck (left) starts watering that buffer type structuring by the freeway.


Yet another train comes by (westbound).


A yellow number patched SP unit normally on coal trains is now on an Intermodal freight.


Above, note the two rails that were laid reach almost all the way to Rancho Ave.

Continued in Part L

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Friday, June 7, 2013 9:56 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “J” (of H-N, Overall A-S)

Things seem to stop … and remain stopped.  Nothing moves … everyone must be on lunch break.


Because of the unexpected, extended stoppage, K.P. got starved.  He goes to a nearby fast food location and chows down.

Upon returning and hiking up onto he overpass a third time, lunch time for the workers seems to be continuing.



Continued in Part K

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Friday, June 7, 2013 9:52 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “I” (of H-N, Overall A-S)

That shuttling back and forth transporting-machine at its unloading point has to wait for the ties to be conveyed out of the way then the load is lowered.


The movement is progressively passing 3rd Street (leftward).


Another eastbound train passes.


As one can tell, we have returned to the Rancho Ave. overpass, looking eastward.

Continued in Part J

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Friday, June 7, 2013 9:48 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “H” (of H-N, Overall A-S)

Slowly moving west still …




Continued in Part I

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    July 2009
  • From: San Francisco East Bay
  • 1,360 posts
Posted by MikeF90 on Thursday, June 6, 2013 7:40 PM

Per the latest ACE project minutes, some kind of 'agreement' has been reached between Kinder-Morgan (tenant pipeline owner) and UP regarding previous (pipeline protection) issues. Design and K-M / UP work will proceed, followed by flood control box construction starting about spring 2014. AFAIK the affected work area is around Humane Way in Pomona, CA. If the agreement is applicable system wide, perhaps more deferred projects *cough*Kaiser yard area* will proceed soon.

ACE is also overseeing the Hamilton Blvd (Pomona) grade separation project, and they estimate that the design will not be complete in mid 2014. That will be one challenging shoofly ....

  • Member since
    December 2012
  • 130 posts
Posted by BarstowRick on Thursday, June 6, 2013 1:31 PM

Awesome pictures and reporting.   

I'm starting to wonder how you get in so close to get those pictures.  Confused

RickH

BarstowRick.com Model Railroading How To's

Be careful  what you ask for you might get it.Cool
Lab
  • Member since
    May 2012
  • 65 posts
Posted by Lab on Thursday, June 6, 2013 11:39 AM

Impressive track laying equipment! Makes one wish they could be there to watch it in person. Keep up the good work.

  • Member since
    August 2008
  • From: Cape Coral, Florida
  • 412 posts
Posted by billio on Thursday, June 6, 2013 7:18 AM

K. P. Harrier

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “B” (of A-G, Overall A-S)

The bridging related to the BNSF Connecter (northwest quadrant transition track) at the Sunset Route seems relatively complete.


Agreed.  The local building inspectors have already given the structure their seal of approval.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Thursday, June 6, 2013 12:03 AM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “G” (of A-G, Overall A-S)

The super slow track laying train had gotten westward to where that incomplete flyover section is at.





------------

Parts H-N will be posted by Saturday, June 8, 2013 at 9:00 A.M. PDT

Parts O-S will be posted by Monday, June 10, 2013 at 9:00 A.M. PDT

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Wednesday, June 5, 2013 11:58 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “F” (of A-G, Overall A-S)

Back at ground level again, by 3rd Street:




Continued in Part G

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Wednesday, June 5, 2013 11:55 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “E” (of A-G, Overall A-S)

Train traffic continues to roll by.



The future Main 2’s rails end by the incomplete, missing flyover section presently blocked by the old Main 1.


Continued in Part F

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Wednesday, June 5, 2013 11:52 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “D” (of A-G, Overall A-S)

An eastward view from up on the Rancho Ave. overpass:


Some ribbon rails are in position now, aligned in preparation for the tie and rail laying equipment.


Those rails go through a guiding, advance piece of equipment.



Continued in Part E

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Wednesday, June 5, 2013 11:49 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “C” (of A-G, Overall A-S)

The tie laying train:




Continued in Part D

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Wednesday, June 5, 2013 11:46 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “B” (of A-G, Overall A-S)

The bridging related to the BNSF Connecter (northwest quadrant transition track) at the Sunset Route seems relatively complete.



Even so, finishing touches were being worked on.


Continued in Part C

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Wednesday, June 5, 2013 11:43 PM

Update as of May 29, 2013

Track Laying Over the Colton Flyover

Colton, CA

Part “A” (of A-G, Overall A-S)

We start looking north towards the La Cadena Drive underpass.  From bottom to top:  (1) the 1956-painted (probably built too) present Sunset Route multi-track bridge (foreground), (2) the high up I-10 walling and bridging (farthest back), and (3) the new flyover’s bridge (between the two).  Yellow track equipment is visible.


Two-unit UP GE power over the BNSF with trailing (left) track laying related cars.


The above photo was taken from the southeast quadrant of Colton Crossing.  By the time the camera had gotten to the southwest quadrant, the power had gone over to the east side.  An eastbound BNSF Intermodal train is passing (right to left).


Continued in Part B

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

mvs
  • Member since
    August 2008
  • 226 posts
Posted by mvs on Wednesday, June 5, 2013 11:59 AM

Looking forward to this photoset -- especially out by Sierra Blanca.  I'm a bit jealous of the 80 mph speed limit...

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Wednesday, June 5, 2013 12:45 AM

Back from Texas!

A total of 985 photos were taken June 1-3, 2013 on a California to Texas whirlwind round trip, with an emphasis on the following key areas:

California:

ONE:  Bertram by Salton Sea through Niland to Iris.

TWO:  An Offshoot from Niland, the El Centro trackage.  Likely this material will be presented last.

Arizona:

THREE:  The two-tracking WEST of Tucson.

FOUR:  The railroad bridge removal area near Marsh Station Road.  Only a handful of photos resulted, and at this point, the success of capturing the bridge removal site AREA is unknown.  But, while at Marsh Station Rd., something occurred that K.P. never thought he would ever see at that location, and considerable time was devoted to documental that occurrence.

FIVE:  The area of the Highway 191 overpass over the Sunset Route.

New Mexico:

SIX:  The under construction many miles-long Santa Teresa, NM facility.  While at the west end, a massive dust storm occurred!  Later, some dramatic “storm lighting” photos were able to be shot!

Texas:

SEVEN:  Sierra Blanca, where a key junction is located.  Leaving that sunny area, 20 minutes later it rained so hard traveling at 80 M.P.H. (the speed limit for I-10 in that area) that everyone suddenly was traveling 50 M.P.H.!

Composing a presentation for the forum hasn’t started yet, but preliminary indications are that it will be on an east to west basis, from Sierra Blanca, TX to California, but one or two of those east to west presentations will be on a west to east basis, like for the Santa Teresa facility.

Schedule for the May 29, 2013 Resultant “Track Laying Over the Colton Flyover”

As a general rule, the Colton, CA presentation will be on an east to west basis, with the following schedule:

First:  Thursday, June 6, 2013

Second:  Saturday, June 8, 2013

Third:  Monday, June 10, 2013.

350 photos were taken, but only 65 will be used, which is a sizable fraction.

Posts will be up BY 9:00 A.M. Pacific Daylight Time on the scheduled date, but likely much, much earlier.

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    December 2007
  • From: Southeast Michigan
  • 2,983 posts
Posted by Norm48327 on Saturday, June 1, 2013 2:11 PM

Thanks John.

Norm


  • Member since
    November 2011
  • 5 posts
Posted by John Kluender on Saturday, June 1, 2013 2:07 PM

The Grade on the east side is 0.58% off the Santa Ana River bridge, This is the original grade. On the flyover itself on the east side it is 1.20% On the west side it is 0.80%. The less severe grade on the west is because the original grade from the diamonds is a steep 1.21% from the diamonds to Rancho. 

John Kluender

  • Member since
    December 2012
  • 130 posts
Posted by BarstowRick on Saturday, June 1, 2013 1:52 PM

Norm48327

Question for K.P. What is the % grade on the Colton flyover?

I'd be surprised if it's anything more then 2%.    Pretty much the standard these days.   Like you I'd be interested in knowing......for sure.

RickH

BarstowRick.com Model Railroading How To's

Be careful  what you ask for you might get it.Cool
  • Member since
    December 2007
  • From: Southeast Michigan
  • 2,983 posts
Posted by Norm48327 on Saturday, June 1, 2013 8:39 AM

Question for K.P. What is the % grade on the Colton flyover?

Norm


  • Member since
    December 2012
  • 130 posts
Posted by BarstowRick on Friday, May 31, 2013 12:30 PM

K.P.

I will be looking forward to further news from Texas and the Colton Flyover.     It just hit me now what do we call the old Colton Crossover?   

The Colton Flyover?   Grin Devil

SO CAL's greatest success story for sure.

RickH

BarstowRick.com Model Railroading How To's

Be careful  what you ask for you might get it.Cool
  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Thursday, May 30, 2013 7:15 PM

Update as of Wednesday, May 29, 2013

Track Laying on the West Slope

The Colton Flyover

Colton, CA

Headway #3 (of 1-3)




A more comprehensive report may or may not follow in a week or two.  (A 20-post rough draft had already been semi-worked up, but preparing the photos and transferring them to media is the time killer!)  But, right now K.P. needs to focus on packing and other preparations for the quick Texas trip.

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Thursday, May 30, 2013 7:11 PM

Update as of Wednesday, May 29, 2013

Track Laying on the West Slope

The Colton Flyover

Colton, CA

Headway #2 (of 1-3)




Continued in Headway #3

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Thursday, May 30, 2013 7:08 PM

A Special Announcement

K.P. is slated to be in Texas this weekend, and hopefully will be able to cover some loose ends photographically for this thread.

Thus, in order for the forum to at least “see” what has transpired at and by the Colton Flyover, an abbreviated flyover picture series (from La Cadena Dr. to Rancho Ave.) without commentary is presented below and the next two following posts …

Update as of Wednesday, May 29, 2013

Track Laying on the West Slope

The Colton Flyover

Colton, CA

Headway #1 (of 1-3)




Continued in Headway #2

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Thursday, May 30, 2013 12:32 AM

Surprise Visit to Track Laying-Ville

The Colton Flyover

Colton, CA

Unexpected scheduling circumstances brought K.P. to the Colton Flyover Wednesday, May 29, 2013, and a two GE motive-powered concrete tie train was on the flyover right over the BNSF Transcon.


A train on top of a train was lowering ties onto the tie laying machine’s ramp.


The intention was originally to quickly check out the Colton Flyover progress, take a few photos, and head back to base.  But, an extended stay ensued with 350 photos taken.  K.P.’s schedule is very unclear for the next few days, but hopefully something (“something”) about Wednesday’s happenings will be able to be posted in a day or two.  Things are so up in the air at this point, it is unknown if some (“some”) photos will have to be held over and presented to the forum next week or not.

eolesen (5-28):

A consistent observation has been that within a couple of weeks of a group of new signals being cutover, even though the heads are turned aside, those new signals are left lit, as they were at Sunshine Blvd. (M.P. 933.62) in Eloy, AZ on March 21, 2012.




Those turned aside lit signals even changed indications as trains passed them.  It is like two signal systems operating at the same time, though the heads of one system are turned aside as mentioned above.

A week after that 2012 Arizona visit when the above photos were taken, the report here at the forum was that the new second-track was finally put in service.  So, eolesen, if you see some of the new signals near Tucson that you have reported being erected actually lit, though the heads might be turned aside, I think it would be safe to say a cutover is imminent.

Best,

K.P.

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Tuesday, May 28, 2013 6:56 PM

Colton Flyover Report

Colton, CA

Part VII (of I-VII)

The final three of six views …


A red board:  Typically someone on site authorizes a train to pass it with some very specific wordage that a train crew will repeat back to him (or her).


Lastly (in two photos), there has been some question about the Main 1 masts (plural) on the east side of the Santa Ana River, as in the reshown view below (photo left).


On this visit, however, the headless mast seems to be gone.


K.P. has no explanation for a mast popping up, and disappearing soon afterwards.

This will conclude the series.

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Tuesday, May 28, 2013 6:47 PM

Colton Flyover Report

Colton, CA

Part VI (of I-VII)

A collection of three of the six final views …

The temporary flyover walling (left) and the permanent wall (right).


The buffer walling (and small meshed fence) and freeway onramp barricading (background):


An angled view from Rancho Ave.:


Continued in Part VII

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Tuesday, May 28, 2013 6:38 PM

Colton Flyover Report

Colton, CA

Part V (of I-VII)

The freeway onramp railing in relation to the flyover protective fencing:


The freeway onramp is a very tight turn off of Rancho Ave., and the new concrete-work now has much tire marks on it already.


As can be discerned just above, any that visits the Rancho Ave. Bridge over the Sunset Route should always keep one eye on turning vehicle traffic, but especially 18-wheelers.

The nearby “Cement Mountain,” as many locals call it, had a strange sight of it.



It didn’t look like a special agent’s vehicle, but K.P. can’t imagine what the precariously parked guy was doing.

Continued in Part VI

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

  • Member since
    October 2003
  • 7,968 posts
Posted by K. P. Harrier on Tuesday, May 28, 2013 6:28 PM

Colton Flyover Report

Colton, CA

Part IV (of I-VII)

The unusual walling by Rancho Ave.:  There is that shadowy mystery guy again!  Also, the ribbon rail.


As noted in the bate announcement of this series, fencing is now on that concrete-work just east of Rancho Ave.


Some were hoping to maybe park their autos on that concrete work for picture-taking, but Caltrans’ erecting wood supported railing for the actual freeway onramp (lower left) kind of eliminates that possibility.


Continued in Part V

----------------------------------------------------------------------------------------------------------------------------------- K.P.’s absolute “theorem” from early, early childhood that he has seen over and over and over again: Those that CAUSE a problem in the first place will act the most violently if questioned or exposed.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy