Good Evening,
I have on my layout of 6 x 9 outside track (Fastrack) on the inner I have 027 two switches left and right.
I would like to join them so that I can have the train run on entire tracks.
What would I need to make this happen. I don’t want to get rid on my 027 but would like to make use of all available track to work together.
Thank you for the help