Trains.com Sites
Resources
Shop
E-mail Newsletters
SEARCH THIS SITE
Help
Contact Us »
|
Customer Service
Get our free e-mail newsletters
Model Railroader
(weekly)
Model Railroader VideoPlus
(weekly)
Trains
(weekly)
Classic Toy Trains
(bi-weekly)
Garden Railways
(bi-weekly)
Classic Trains
(bi-weekly)
By signing up I may also receive reader surveys and occasional special offers from Trains.com. We do not sell, rent or trade our e-mail lists.
Details about our newsletters »
Read our privacy policy »
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Search Community
Searching
Please insert search terms into the box above to run a search on the community.
Users Online
Erik_Ma...
see all ยป
Thread Details
Rate This
1
Reply — 547 Views
0
Subscribers
Posted
over 17 years ago
Thread Options
Subscribe via RSS
Share this
Tag Cloud
1950s
advice
Amtrak
Atchison, Topeka and Santa Fe
Baltimore and Ohio
Boxcars
Bridges
Burlington Northern Santa Fe
Caboose
Canada
Canadian National Railway
Canadian Pacific Railway
cargo
Chicago
Chicago, Burlington and Quincy
Colorado and Southern
Coupler
Coupling
CSX
dcc sound
Depots
Diesel Engines
education
Emporia
fec
Home
»
Discussion Forums
»
General Discussion (Trains.com)
»
gas contractors shut down CSX
Forums
|
Want to post a reply to this topic?
Login
or
register
for an acount to join our online community today!
gas contractors shut down CSX
Posted by
FJ and G
on
Thu, Aug 9 2007 8:24 AM
No trains moving for hours. I went to sleep in the train and got home late.
This Message is for all VRE Riders:
CSX has informed us that a gas company contractor has cut a line that supplies power to several switches and signals in the rail interlocking south of Alexandria. Consequently, all VRE trains may encounter delays of 30-45 minutes past Alexandria due to crews having to hand throw switches in the area. We will update you when more information is available.
--
For the latest information, don't forget to check out the VRE web site at:
http://www.vre.org. If you would like to unsubscribe yourself or change
your delivery information, simply go to the VRE website at
http://traintalk.vre.org/vre.
You have posted to a forum that requires a moderator to approve posts before they are publicly available.
Replies to this thread are ordered from "oldest to newest". To reverse this order, click
here
.
To learn about more about sorting options, visit our
FAQ page
.
Posted by
FJ and G
on
Thu, Aug 9 2007 11:46 AM
FLASH! THis just in from VRE!!!
************
Shortly after 3:00pm a gas company contractor, relocating a gas line, cut a three power cables that supply the power to what is known as the AF Interlocking, just south of the Alexandria station. The AF Interlocking is about 1.5 miles long, consists of three main lines and several sidings. A multitude of switches and signals accommodate travel through the area between both Norfolk Southern and CSX tracks. As a result, rail traffic was halted while train crews were required to walk the entire interlocking to manually align the switches. This situation created rail congestion and both Fredericksburg and Manassas line trains encountered delays once they were south of the Alexandria station.
Initial estimates were that the situation would not be corrected until 7:00p. Fortunately, the power, signals, and switches were restored at 4:45p, but not without having severely disrupted our service. The incident forced the cancellation of Manassas Line train 329 and caused significant delays to the early evening service.
FRCs were passed out to those who were 60 minutes or more late. If you did not receive an FRC and believe you are due one, send an FRC request form (http://www.vre.org/programs/frc-request.pdf) to VRE along with a copy of your ticket and a brief explanation.
************
L'Enfant Cut-In Reminder
As a reminder, the cut-in for the third track at L'Enfant is scheduled for this weekend. In the unlikely event that project is not completed Sunday evening, VRE will operate on the "S" Schedule on Monday, August 13 on both lines. Please check for service updates on the website, Train Talk, or our 800-RIDE-VRE for an update after 6:00p on Sunday evening.
--
You have posted to a forum that requires a moderator to approve posts before they are publicly available.
Home
»
Discussion Forums
»
General Discussion (Trains.com)
»
gas contractors shut down CSX