Posted by cwclark on Saturday, April 28, 2007 11:01 AM

Hi guys,

     So I have a code 100 Shinohara select control turnout that just won't work. There is a short between the metal point bar and the diverging route track. I've tried every wiring schematic I know to try and wire around the frog with tortoise machine contacts and still get the short on the diverging route. (even tried the pig tail from the points to the closure rails that Linn Wescott demonstrated in his old electrical MRR book and it was still a no-go.) My last hope for the turnout is to remove the metal point throw bar, the copper clips, and install an insulated circuit board throw bar. Does anyone know where there is a website demo of how this is done or what issue of MRR this was demonstrated in? I have the circuit board material but need to know the preferred way of mounting the points to it......thanks, chuck

 

  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Saturday, April 28, 2007 11:40 AM
 cwclark wrote:
install an insulated circuit board throw bar. .... need to know the preferred way of mounting the points to it...
We (my club) drill and tap for 00-90 screws.  We tried just using a screw in the center, but that makes them really stiff.  So we prefer to cut the bar between the points apart, redrill new holes, and use 1 screw for each point. 
  • Member since
    December 2001
  • From: Trois-Rivieres Quebec Canada
  • 1,063 posts
Posted by jalajoie on Saturday, April 28, 2007 11:46 AM

You may find your answer at "Wiring for DCC" web site. I did not book marked the URL as in my opinion this site is doing more wrong than good.

An easy way to get rid of the copper bar underneath the throw bar is to cut it with an Xacto blade #11. I don't think it is necessary to replace the throw bar.

In addition I always cut a gap into both diverging branch of the frog, regarless if it is necessary or not.

Been using these Shinohara since 52 years without any problem so far even with DCC.

Jack W. 

Jack W.

  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Saturday, April 28, 2007 4:28 PM

 There are some examples on the handlaid track web site (the Fast Tracks people - they have forums there as well). There is an example of making a pivoted throwbar using spikes and a PC board tie (vs soldering the points to the PC board tie).

 

                                    --Randy


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    January 2001
  • From: US
  • 1,774 posts
Posted by cmrproducts on Saturday, April 28, 2007 7:50 PM

To correct the shorting at the frog I cut through both rails about 3/4 inch from the point of the frog.

This makes the frog insulated from the rest of the switch.

I use the thick super glue to fill the cut and make sure the frog rails do not come loose.

I have 10 double curved Shinohara turnouts on my layout now and have done this with all of them and have never needed to do anything with the throw bar.

I also do not power the frog once it is cut.  So far I have been able to run the short 44 ton and 70 ton Bachmann factory decoder equiped engines through them without them stalling.

The Bachmann engines are about the shortest wheelbase engines there are, although I don't run steam!

BOB H - Clarion, PA 

 

  • Member since
    January 2004
  • From: Crosby, Texas
  • 3,660 posts
Posted by cwclark on Saturday, April 28, 2007 10:23 PM
 cmrproducts wrote:

To correct the shorting at the frog I cut through both rails about 3/4 inch from the point of the frog.

This makes the frog insulated from the rest of the switch.

I use the thick super glue to fill the cut and make sure the frog rails do not come loose.

I have 10 double curved Shinohara turnouts on my layout now and have done this with all of them and have never needed to do anything with the throw bar.

I also do not power the frog once it is cut.  So far I have been able to run the short 44 ton and 70 ton Bachmann factory decoder equiped engines through them without them stalling.

The Bachmann engines are about the shortest wheelbase engines there are, although I don't run steam!

BOB H - Clarion, PA 

 

That isn't the problem, I did cut thru the closure rails before the frog and insulated them with sheet styrene then wired around the frog using the tortoise machine contacts to power the frog and the rails past the frog. The problem is that the points never loose contact with the copper strips on either side of the rails. I'm going to have to remove the entire point throw bar and totally rebuild it so that it is insulated. I got a bum turnout and will try anything first before giving up and putting in a new one. Since soldering the turnout in various places, it's gonna be real hard to take it back for a refund.

 

  • Member since
    December 2004
  • From: Pa.
  • 3,361 posts
Posted by DigitalGriffin on Sunday, April 29, 2007 2:18 AM
 cwclark wrote:

Hi guys,

     So I have a code 100 Shinohara select control turnout that just won't work. There is a short between the metal point bar and the diverging route track. I've tried every wiring schematic I know to try and wire around the frog with tortoise machine contacts and still get the short on the diverging route. (even tried the pig tail from the points to the closure rails that Linn Wescott demonstrated in his old electrical MRR book and it was still a no-go.) My last hope for the turnout is to remove the metal point throw bar, the copper clips, and install an insulated circuit board throw bar. Does anyone know where there is a website demo of how this is done or what issue of MRR this was demonstrated in? I have the circuit board material but need to know the preferred way of mounting the points to it......thanks, chuck

 

I presume you are DCC.  DC usually doesn't have these problems.

As other's have suggested, have you tried cutting the frog to isolate it from the rest of the circuit?

 

Don - Specializing in layout DC->DCC conversions

Modeling C&O transition era and steel industries There's Nothing Like Big Steam!

  • Member since
    December 2001
  • From: Trois-Rivieres Quebec Canada
  • 1,063 posts
Posted by jalajoie on Sunday, April 29, 2007 8:16 AM
 cwclark wrote:

The problem is that the points never loose contact with the copper strips on either side of the rails. I'm going to have to remove the entire point throw bar and totally rebuild it so that it is insulated.

Please refer to my first post, the copper strips on either side of the rails can be cut very easily with an Exacto #11 blade. There is no need to remove or modify the throw bar.

Jack W.

Jack W.

  • Member since
    January 2001
  • From: US
  • 1,774 posts
Posted by cmrproducts on Sunday, April 29, 2007 10:20 AM

cwclark

Where I cut the frog and effectively insulating it I found that the flanges were still touching next to the ties further out.

I had to use a very thin Dremel abrasive cutting disk and cut away the rail flange way down inside the point rails. 

I could not figure out why I still had a short until I cut a gap in the rail flanges further from the frog.  I know that this might not make much sense but it took me a while to figure out a way to gap the rails past the frog. 

So far I have never had any other problems with those turnouts

BOB H - Clarion, PA 

 

cwclark stated

That isn't the problem, I did cut thru the closure rails before the frog and insulated them with sheet styrene then wired around the frog using the tortoise machine contacts to power the frog and the rails past the frog. The problem is that the points never loose contact with the copper strips on either side of the rails. I'm going to have to remove the entire point throw bar and totally rebuild it so that it is insulated. I got a bum turnout and will try anything first before giving up and putting in a new one. Since soldering the turnout in various places, it's gonna be real hard to take it back for a refund.

 

 

  • Member since
    October 2004
  • From: Colorful Colorado
  • 8,639 posts
Posted by Texas Zepher on Sunday, April 29, 2007 5:30 PM

 cwclark wrote:
I'm going to have to remove the entire point throw bar and totally rebuild it so that it is insulated.
Oh yeah, don't forget to file or sand the conductive surface of the circuit board, or a least cut the surface where you want it to conduct.

got a bum turnout and will try anything first before giving up and putting in a new one. Since soldering the turnout in various places
Another reason I never seldom solder track.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!