Simon Modelling CB&Q and Wabash See my slowly evolving layout on my picturetrail site http://www.picturetrail.com/simontrains and our videos at http://www.youtube.com/user/MrCrispybake?feature=mhum
It takes an iron man to play with a toy iron horse.
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by jpmorrison i started this 2 months ago for my dock it's 4 kits together jeff
https://tstage9.wixsite.com/nyc-modeling
Time...It marches on...without ever turning around to see if anyone is even keeping in step.
QUOTE: Originally posted by Master of Big Sky Blue If you build it, I will come. James
QUOTE: I'm planning a scratch-bash really soon. I want to build a Muir Models Mine, but the mine is a corregated metal building set. I want to replace all the metal with board and batton. So essentially, I'm using the plans to build my own version. Not really kitbashing because I'm not using the parts that came with the kit except the wood pilons.
Dr. Frankendiesel aka Scott Running BearSpace Mouse for president!15 year veteran fire fighterCollector of Apple //e'sRunning Bear EnterprisesHistory Channel Club life member.beatus homo qui invenit sapientiam
QUOTE: Originally posted by jeffrey-wimberly If that structure isn't already on the roster of historic places, it needs to be!