Modeling BNSF and Milwaukee Road in SW Wisconsin
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by PABELT how much for the entire thing?
QUOTE: Originally posted by SpaceMouse QUOTE: Originally posted by PABELT how much for the entire thing? The best thing to do is go to eBay and look. If you layout looks good, you might do well.
QUOTE: Originally posted by trainfreek92 QUOTE: Originally posted by SpaceMouse QUOTE: Originally posted by PABELT how much for the entire thing? The best thing to do is go to eBay and look. If you layout looks good, you might do well. Chip i think he was asking the poster how much the layout was[:D]
Simon Modelling CB&Q and Wabash See my slowly evolving layout on my picturetrail site http://www.picturetrail.com/simontrains and our videos at http://www.youtube.com/user/MrCrispybake?feature=mhum
QUOTE: Originally posted by 02F350PSD I guess i could try disassembling it (even tho i just finish or am about to finish) i figure i have about $3000 invested in DCC,locos, cars, scenery, and misc. for assembly. I don't know what it would be worth if i could possibly just cut it into smaller sections. I live near boston so i am near a major city. Any other imput? Thanks everyone.