Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Bridge Track Extending beyond Bridges: How Far?

4883 views
26 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Bridge Track Extending beyond Bridges: How Far?
Posted by Capt. Grimek on Friday, March 1, 2013 8:22 PM

Hi, tried a search lst.  I'm about to cut bridge track (Micro Engineering) for a girder plate bridge that is 1o: long.  In Jeff Wilson's Kalmbach book he shows the bridge track ties ending at the respective ends of his bridge. Did they ever extend further?

I also wondered about the lack of guard rails (the ones that come to a point beyond brige ends 30-50 ft. on the Micro Engineering bridge track. Were guide rails not used on girder bridges? Would knowledgable viewers miss seeing them?

I'll probably use the Walthers Bridge Track for the two truss bridges, later, but wondered about the 2 things above concerning girder plate bridges. 

Thanks much,

Jim

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Friday, March 1, 2013 8:22 PM

Make that 10 inches long for the girder plate bridge.  Thanks again.

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    July 2006
  • From: west coast
  • 7,652 posts
Posted by rrebell on Friday, March 1, 2013 8:58 PM

It varied so much in real life. Some did not have guardrails, some one, some both. Some ended in a point on both ends, some only one and in every thing less than a point. Also every length imaginable. Saw one that was on only one side and started quite a distance before the bridge and ended just before the bridge end. The one end was just bent into the balast with the one on the bridge just cut off.

  • Member since
    September 2003
  • 10,582 posts
Posted by mlehman on Friday, March 1, 2013 9:05 PM

One of the issues with variable length was any need to protect elements of the bridge. Derailments are bad enough and definitely part of the reason for guardrails. But the ultimate worst result is something that compromises the structure of the bridge itself. So your bridge and abutments will give you some clues about what will look right.

As for pointy ends for your ME bridge track, it's code 55 for HOn3 bridges, but I don't know what comes with SG bridge track. Code 55 would be good anyway, as it will keep things low and less likely to snag when cleaning.

Mike Lehman

Urbana, IL

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Friday, March 1, 2013 10:38 PM

I have seen the curved/pointed guard rail ends met just inches beyond the abutments of the bridge all the way out about 20'.

Crandell

  • Member since
    February 2008
  • 8,825 posts
Posted by maxman on Friday, March 1, 2013 10:50 PM

Looks like a lot of good information is contained in this thread from 2010: http://cs.trains.com/mrr/f/11/p/169494/1861665.aspx#1861665

Even has some links to PRR specification drawings.

  • Member since
    December 2011
  • From: Northern Minnesota
  • 2,774 posts
Posted by NP2626 on Saturday, March 2, 2013 5:58 AM

I have many bridges on my layout.  Most have been made from kit Atlas bridges: Through-truss, Deck-Truss, Plate Girder, Through-Girder.  Some of these have been Kit-bashed together, by cutting up parts of the various types mentioned to make bridges that are different-longer than the standard Atlas Bridge kit.  In all of these cases, the bridge deck and guard rails all ended precisely at the abutments of the bridge itself and in all cases the guard rails just bend inward, running about a 1/2 inch or so and do not come to a point.  In the Kalmbach book:  Bridges and Trestles, they discuss the length of the guard rails as generally extending past the abutments of the bridge, maybe 10-70 feet.  They also show that Guard rails were not always used.  The ends of the guard rails were treated in various ways, bent inward and down, between the ties, bent inward; but, not meeting and bent inward and meeting and show that where they are bent inward to meet, they meet in various ways; notched and lapped, simply meeting in a miter cut, meeting with a special tip part.  I don't see them showing the closer spaced and longer bridge ties extending past the abutments in the book.  But who knows/who cares, if you want to do so, it's your railroad, do what you want! 

In fact, on the last trestle I scratch built, I used Micro Engineering bridge track which had Code 83 rail with Code 70 guard rails.  I extended the bridge ties several feet past the abutments, as I simply liked how this looked.  If someone feels they need to correct me on this, I will insist they prove me wrong and even if they could, it still boils down to it being my railroad and I will do what ever I like!!        

NP 2626 "Northern Pacific, really terrific"

Northern Pacific Railway Historical Association:  http://www.nprha.org/

  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Posted by BATMAN on Saturday, March 2, 2013 11:20 AM

I have explored along the CPRs mainline through the mountains etc. When it comes to bridges, nothing is neat and tidy like we see in the MRR books. Guard rails are made up of old worn out sometimes bent sections of rail. That makes sense, rail is very expensive so use some crap to do that job. They are also usually different lengths and never come to a neat point like they do in the books. Except maybe in urban areas.

As far as bridge track goes, I have noticed that it extends beyond the actual bridge structure quite often. In areas where the RR crosses a river and the banks are river gravel for a ways on each side, I have noticed the bridge track go on for a distance. I think this is because of erosion concerns at high water.

Where the bridge terminates into rock, the bridge track ends close to the structure of the bridge.

One thing for sure Railroads seem to keep things very neat and tidy near civilization, however get into the wilds and you will see piles of spikes, ties and rail sitting by the mainline for years before they are picked up.

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

  • Member since
    December 2011
  • From: Northern Minnesota
  • 2,774 posts
Posted by NP2626 on Saturday, March 2, 2013 2:20 PM

The book I mentioned above,shows photos of the guard rail ends I mentioned.  So, at one point in time the "Neat Point" you state never existed, must have.  Maybe they weren't used on the CP/CN, I don't know. 

I've always found that the things shown; or, mentioned in the books I have of Kalmbach's or Carsten's, existed.  The idea is for these books to show the reality of railroading with generally accepted practices, not go off the deep end. 

I've walked the rails here in Minnesota (in the wilds) as you say and have occasionally found an old spike, tie plate and even some old ties in piles when the track gang has done some recent work.  Old welded rail may also lay along  the road bed.  However, I don't find the right of way to be anymore cluttered with crap than in urban areas. 

NP 2626 "Northern Pacific, really terrific"

Northern Pacific Railway Historical Association:  http://www.nprha.org/

  • Member since
    February 2008
  • From: Potomac Yard
  • 2,767 posts
Posted by NittanyLion on Saturday, March 2, 2013 3:41 PM

Urban ROWs do seem to have less materiel just laying around because there's more people around to help it find a way to wander off.

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Saturday, March 2, 2013 4:12 PM

I'd like to separate two things which have gotten somewhat tangled:

Bridge track - larger-than-standard ties, closer than standard tie spacing, usually with a timber bolted along the tie ends.  That kind of structure is only used on the bridge structure itself.  Take a close look at the point where the rail crosses the abutment - 'stock' tie on the ground, bridge tie on the metalwork 

Guard rails - always found on through bridges, may or may not be installed on deck bridges.  May also be found on high fills and in tunnels.  May be anything from used mine car rail (on a poster three meters from my right shoulder) to main-line re-lay (HO, Code 80 for Code 83 running rails.)  Your prototype's Common Standards (or its historical society) will indicate which way to bounce this ball.

The long, pointy ends on guard rails usually extend 25-40 feet beyond the abutments.  They may or may not end in fancy castings, or just close together (and not necessarily the same length.)  Some lines even bent them into the ballast.  Again, this is prototype and era specific, so some research may be in order.

Guard rails were intended to keep derailed trucks in line with the rails, and the carbody out of contact with the bridge (or tunnel) structure.  On deck structures, the latter wasn.t a concern,, so some roads didn't  use guard rails there.  OTOH, some railroads use guard rails (but not bridge track) on ballasted-deck bridges.

There was another, odd, form of guard rail used where long-wheelbase steam ran tight curves with blind drivers.  On the inside of the curve, there would be a rail the same height as the running rail laid just outside it, barely separated enough to allow spikes to be used.  The same on the outside rail, but there the extra rail would form a super-long flangeway.  Without those extra rails the blind drivers could drop off the rails and not be able to climb back on.

My prototype (JNR) installed single guard rails on high speed mainlines - on the field side of double-track mains, to keep derailed equipment from collecting something running in the opposite direction.

Chuck (Modeling Central Japan in September, 1964 - with guard rails in odd places)

  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Sunday, March 3, 2013 1:25 AM

Thanks very much, guys.

Tom, the issue that confuses me is that (I think) a plate girder bridge IS a through bridge. Is that correct?

So...if so, should it really have guard rails as well as the existing micro engineering guard timbers?

Sounds like the close ties should end at the abutment like in Wilson's book as in the real world.

Just tryin' to do it like the real world.

Thanks for any further clarifications,

Jim

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Sunday, March 3, 2013 10:53 AM

Jim, a "Plate girder bridge" can be either a deck girder or a through girder bridge.  If it has a floor structure supported by girders that extend above track level it is a through bridge.  Current NS practice puts guard rails on through girders with ballasted decks.  They appear to be in the 100# range - code 70 in HO.

Chuck (Modeling Central Japan in September, 1964)

  • Member since
    May 2010
  • From: Cresco, IA
  • 1,773 posts
Posted by ChadLRyan on Sunday, March 3, 2013 12:26 PM

Thanks, interesting topic!
On a bridge project I am doing, I'm going to use just the ends of the Walthers 948-886,  ½ Meter bridge track, as it has the ends with the Pointed Gaurd Rail points that are a seperate section, & I can use those on each end of my 3 span Bridge set & then add in the appropriate rail throughout the span.
Those removable parts are about 2 inches (or so) long, & yes it is a lot of joints, but will give a very nice look, in my opinion.
I also plan on soldering fish plates to all the joints to provide the strength & conductivity, I have some nickel plated units from Proto 87 Stores, & hope that testing, & application will be successfull.

If you wanted ready made gaurd rail leade's & tail's that may be a nice option.  

Chad L Ryan
  • Member since
    December 2011
  • From: Northern Minnesota
  • 2,774 posts
Posted by NP2626 on Sunday, March 3, 2013 1:42 PM

Capt. Grimek

Tom, the issue that confuses me is that (I think) a plate girder bridge IS a through bridge. Is that correct?

So...if so, should it really have guard rails as well as the existing micro engineering guard timbers?

Sounds like the close ties should end at the abutment like in Wilson's book as in the real world.

Just tryin' to do it like the real world.

Thanks for any further clarifications,

Jim

A "Through Bridge" would be a bridge that has any type of support structure above the deck of the bridge.  A "Deck Bridge" therefore, would be a bridge that the support stucture would be below the deck.   

NP 2626 "Northern Pacific, really terrific"

Northern Pacific Railway Historical Association:  http://www.nprha.org/

  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Sunday, March 3, 2013 3:00 PM

Tom, thanks very much. Tom and NP, I figured my girder plate was indeed a 'through' bridge but wanted to be sure that term applied before making the decision about whether or not guard rails would be needed to be prototypical.

Thanks again everyone,

Jim

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    July 2006
  • 3,312 posts
Posted by locoi1sa on Sunday, March 3, 2013 3:32 PM

Jim.

 Everything you need to know about how the mighty PRR built track. This book is dated 1957.

http://prr.railfan.net/documents/CE78%28j%29.pdf

Guard rails for bridge and trestles are paragraphs 1001 to 1015. Interesting in fact is the speed limit  and curve radius determines the length of the guard rails.

          Pete

 I pray every day I break even, Cause I can really use the money!

 I started with nothing and still have most of it left!

  • Member since
    December 2011
  • From: Northern Minnesota
  • 2,774 posts
Posted by NP2626 on Sunday, March 3, 2013 7:00 PM

I find it interesting the lengths some of you feel you need to take adherence to prototype practices.  You reference prototype information contained in books written for real railroads and espouse points of view that really can not be proven!  You seem to think things are always black and white and maybe they are; but, who really cares.

I guess I look at building my model railroad from a slightly different perspective.  I only really care if my railroad looks real.  I think it is far more important that all my cars show realistic weathering, as opposed to small details that probably aren't even noticeable/visible at the distance we observe our trains running around the layout.  99.5% of the people who visit our layouts have no idea if a detail we have added; or, left out, is prototypically correct and likely do not care one way or the other.

I can understand this interest in adherence to prototype and please understand this post is not being critical of your choice.  I chalk it up to your doing what you want to do, which is what the hobby is all about.  However, I wonder if you can understand my point of view.       

NP 2626 "Northern Pacific, really terrific"

Northern Pacific Railway Historical Association:  http://www.nprha.org/

  • Member since
    July 2006
  • 3,312 posts
Posted by locoi1sa on Sunday, March 3, 2013 7:59 PM

NP2626
I can understand this interest in adherence to prototype and please understand this post is not being critical of your choice.  I chalk it up to your doing what you want to do, which is what the hobby is all about.  However, I wonder if you can understand my point of view.  

 Its called rivet counting thank you!  Some of us feel that track is a model too. This is why I chose to hand lay rail on ties with tie plates. Code 70, 55, and even a spur in code 40 for HO stripped from N scale. I even started putting joint bars on the visible sides of my track work. I just like doing insane things to keep me from going nuts.

         Pete

 I pray every day I break even, Cause I can really use the money!

 I started with nothing and still have most of it left!

  • Member since
    December 2011
  • From: Northern Minnesota
  • 2,774 posts
Posted by NP2626 on Monday, March 4, 2013 5:48 AM

locoi1sa

NP2626
I can understand this interest in adherence to prototype and please understand this post is not being critical of your choice.  I chalk it up to your doing what you want to do, which is what the hobby is all about.  However, I wonder if you can understand my point of view.  

 Its called rivet counting thank you!  Some of us feel that track is a model too. This is why I chose to hand lay rail on ties with tie plates. Code 70, 55, and even a spur in code 40 for HO stripped from N scale. I even started putting joint bars on the visible sides of my track work. I just like doing insane things to keep me from going nuts.

         Pete

And Pete, my guess is, you are enjoying adding all the detail to your track that you do.  I certainly don't think of what you are doing as an indicator of insanity and yes, you could call this strict adherence to what the prototype does/did as "Rivet Counting".  I have super detailed my locomotives, added interiors and lights to buildings and built many Proto 2000/Branchline/Intermountain/etc. type freight car kits.  I've enjoyed doing this! 

However, your choice to be a "Rivet Counter" doesn't mean that the rest of us need to follow this belief;or, that we're less of a modeler than you are!

Again, I am only attempting to express my point of view and not singling anyone out for how they enjoy conducting their Model Railroading hobby! 

NP 2626 "Northern Pacific, really terrific"

Northern Pacific Railway Historical Association:  http://www.nprha.org/

  • Member since
    July 2006
  • 3,312 posts
Posted by locoi1sa on Monday, March 4, 2013 6:03 PM

NP.

 I posted the book for the OP to flip through. He asked a good question about guard rails. Many modelers do not even attempt to model guard rails on bridges, tunnels, going into load out areas, even under coaling and water tanks. I do not begrudge anyone for not doing this. I see it all the time and never say "hey where are your guard rails". Its their railroad and that's that. I run mine about 8 inches before the bridge abutments and I even did guard rails under my sand and gravel loading facility but ended them a couple inches from the hoppers. My layout is still being constructed and one scene will be some track pans. The track where the pans were are not on ties and ballast but cut stone. This stuff fascinates me and doing the research is half the fun. I do not consider myself a rivet counter but I want to do it right the first time and have it look decent. I figure the better the track looks the less people will focus on my poor scenery painting and crummy looking trees.

   No one is telling the OP what to do. Just answering the questions is all.

             Have fun.

             Pete

 I pray every day I break even, Cause I can really use the money!

 I started with nothing and still have most of it left!

  • Member since
    December 2012
  • 213 posts
Posted by singletrack100 on Tuesday, March 5, 2013 7:22 AM

locoi1sa
I run mine about 8 inches before the bridge abutments and I even did guard rails under my sand and gravel loading facility but ended them a couple inches from the hoppers. 

 

locoi1sa
Many modelers do not even attempt to model guard rails on bridges, tunnels, going into load out areas, even under coaling and water tanks. 

I'm no rivet counter, nor am I modeling anything near a prototypical RR, however, I never thought about guard rails until a post a while back where someone asked about what glue to use to attach them. With that, I began adding them to my deck bridges, at least the ones on curves.

I never even thought about coaling and water facilities, but with this I envision more guard rails being added there as well! So, this thread has been informative, or inspiring anyways, for me. Thanks Pete!

Duane

  • Member since
    February 2008
  • 8,825 posts
Posted by maxman on Tuesday, March 5, 2013 10:42 AM

locoi1sa

NP2626
I can understand this interest in adherence to prototype and please understand this post is not being critical of your choice.  I chalk it up to your doing what you want to do, which is what the hobby is all about.  However, I wonder if you can understand my point of view.  

 Its called rivet counting thank you!  Some of us feel that track is a model too. This is why I chose to hand lay rail on ties with tie plates. Code 70, 55, and even a spur in code 40 for HO stripped from N scale. I even started putting joint bars on the visible sides of my track work. I just like doing insane things to keep me from going nuts.

         Pete

 
No, none of what you have described is rivet counting.  It is called detailing.  And it can be carried out to any extent from none through super detailed.
 
It becomes rivet counting when a debate ensues over whether the end of the guard rails should be 60 feet instead of 65 feet beyond the end of the bridge.
  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Sunday, March 10, 2013 5:42 PM

I've searched on the internet for just the pointed guard rail end bits (Walther's Shinohara Code 83) but haven't seen them listed separately. Anyone have a source for them or something similar? Are they pretty easy to add later if I misse seeing them? Either spiking or gluing?

I have 3 lengths of ME bridge track so hate to buy Walthers to just get the ends-and probably wouldn't.

Thanks guys. I've learned about the existence of coaling/water facilities guard rails here so glad I asked the original question(s).

Jim

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Sunday, March 10, 2013 5:47 PM

Just get some rail stock and file the ends.  A small mill file, lay the rail on its side on a small block of wood to protect its shape, and gently file a sharpened end.  Repeat three times, and then bend the ends so that they come to a point.  I haven't seen welded points, just the tips bent to be close to each other, almost touching.

Crandell

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Sunday, March 10, 2013 6:08 PM

I have seen actual steel castings, sort of similar to the pointy part of a frog without the guard rails.  A few minutes whittling and filing on a scrap of styrene, followed by a coat of white or grunge-colored paint, wiuld produce a satisfactory approximation.

Why white paint?  I have seen the prototype painted white.

Note that I'm not telling anyone to do this.  It's just an interesting detail.

Chuck (Modeling Central Japan in September, 1964 - with details appropriate to the location)

  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Sunday, March 10, 2013 7:48 PM

Super glue work just fine?      Or should they be spiked-I've got plastic ties/M.E. bridge track.

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!