Hello all,
Its about darn time...this has been eating at me and I couldn't wait to glue the structure together.As soon as I got home from work,I started.
Glued the end pieces to the main sides of the building.Added the top portion,installed the center span,installed the braces. It looks rough as heck but its under way. Have to work of the roof,BOF vents and the charger crane area.
Right now you may be asking....Patrick where are all the pictures ? As soon as my sony camera charges,I'll post a few pictures of the build. Keep in mind this structure looks rough,due to the fact of using corugated plastic signs....with writing in tow.
Should have something to share soon.
Patrick
Beaufort,SC
Dragon River Steel Corp {DRSC}
Fear an Ignorant Man more than a Lion- Turkish proverb
Modeling an ficticious HO scale intergrated Scrap Yard & Steel Mill Melt Shop.
Southland Industrial Railway or S.I.R for short. Enterchanging with Norfolk Southern.