Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

WPF 12/19-12-21 Locked

7119 views
49 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2007
  • From: Ottawa Canada
  • 216 posts
Posted by RRCanuck on Sunday, December 21, 2008 11:34 AM

Hi folks.  It's been a long time since I've posted.  Anyway, here are a couple of different views of Cliff Street.  Skies are digital.

Cheers.

 

 

  • Member since
    February 2008
  • From: Memphis, TN
  • 3,876 posts
Posted by Packers#1 on Sunday, December 21, 2008 11:34 AM

Tom, I'd be careful, she looks like she tinks she owns da joint Big Smile

EDIT: RRCanuck, great shots. Love the first one. Bow

Sawyer Berry

Clemson University c/o 2018

Building a protolanced industrial park layout

 

  • Member since
    February 2001
  • 872 posts
Posted by pike-62 on Sunday, December 21, 2008 12:11 PM

Local shortline moving past the tower enrout to pick up 1 boxcar to deliver to a local industry on it's line.

  • Member since
    July 2004
  • From: northern nj
  • 2,477 posts
Posted by lvanhen on Sunday, December 21, 2008 12:16 PM

RRCanuck

 

 

 

Don't you need a "One Way - Do Not Enteer" sign in front of Radio Shack?ConfusedBig Smile

Lou V H Photo by John
  • Member since
    January 2007
  • From: Ottawa Canada
  • 216 posts
Posted by RRCanuck on Sunday, December 21, 2008 12:25 PM

Yes, Lou - very observant!  I haven't figured out where to put it yet.

  • Member since
    July 2004
  • From: northern nj
  • 2,477 posts
Posted by lvanhen on Sunday, December 21, 2008 12:29 PM

In the States, they would plant it right in the sidewalk!!  (heck with the pedestrians!!)  BTW  Nice photos!!!Thumbs UpThumbs Up

Lou V H Photo by John
  • Member since
    January 2007
  • From: Ottawa Canada
  • 216 posts
Posted by RRCanuck on Sunday, December 21, 2008 12:32 PM

Thanks Lou.  I'm thinking of an overhead sign - need to scratchbuild one, but doubt that it will be very difficult.  Cheers.

  • Member since
    July 2006
  • From: Sorumsand, Norway
  • 3,417 posts
Posted by steinjr on Sunday, December 21, 2008 1:19 PM

Following the find of a some new prototype photos, I rebuilt my Mississippi coal barge from this (WPF 11/21):  

to this:

  Now I am waiting for my Walthers 25 ton brownhoist kit (http://www.walthers.com/exec/productinfo/932-5611), to try to recreate something like this prototype scene: http://collections.mnhs.org/visualresources/image.cfm?imageid=77011

 With Christmas coming up, I am waiting to see if Santa will bring an airbrush this Christmas. I have (mostly) been a good boy this year ... Smile,Wink, & Grin

Smile,
Stein

 

 

  • Member since
    April 2007
  • From: Memphis, Tennessee
  • 446 posts
Posted by SD60M on Sunday, December 21, 2008 1:49 PM

Its been a bit since i posted here so here goes! While i have been in a battle with my benchwork and money to finish it i have laid my tracks down on the floor once again and here is the small yard that i do have some fun with! BN SD24 and SW8 get ready to sort the ore cars from the box and ballast cars. Enjoy!

-Kade

Long Live The Burlington Northern!
  • Member since
    February 2005
  • From: England
  • 1,269 posts
Posted by jon grant on Sunday, December 21, 2008 4:59 PM

Nice photos guys.

With having a show last weekend, I am currently in modelling overload phase this week, so not much from me. I did manage to snap a few piccies off showing the layout in its sectional state, while I was unpacking it. A week later and it still looks pretty much the same.

First up, the layout at Wigan show last weekend - about 320 mile round trip, I don't get much time to take snaps at a busy show, so I usually take them before the show opens on the Sunday morning


The sections fit together for transportation to and from the show. This means attaching end supports and protecting the backscene with packing foam.


One of the boards seperated from its partner but with the end-divider and foam still in place


Two of the boards unpacked and ready for joining together on the frame I use at home. The layout rests on the metal frame in the basement, rather than the exhibition legs, to lower the layout to a workable height.


Jon

Sweethome Chicago is now on Facebook

Sweethome Alabama is now on Facebook

Hudson Road is now on Facebook

my videos

my Railimages

  • Member since
    May 2003
  • From: Australia
  • 297 posts
Posted by ngartshore350 on Sunday, December 21, 2008 5:03 PM

Nice images people!

Just a Water Tower I've completed.

Nige.

  • Member since
    November 2004
  • From: Cape Girardeau, MO
  • 3,073 posts
Posted by JimRCGMO on Sunday, December 21, 2008 5:07 PM

jacon12
 Let me echo the others here, I think the india ink wash is just right.  Get that dog and chair on the porch, some ground work around it and it's gonna be first class.  I wish I could do half this good.

 

Yeah!!, and Terry, maybe put an old wood stove in one corner for those cold nights. Thumbs Up

Great work and photos, everyone! I need to get a camera (preferably digital), but Christmas isn't here quite yet, so no pics from me. Have been looking
 over some structure kits I've started, and trying to figure how to get some 'Gothic' shaped openings cut in the board-n-batten walls for the windows.

 Jim in Cape Girardeau

Moderator
  • Member since
    November 2008
  • From: London ON
  • 10,392 posts
Posted by blownout cylinder on Sunday, December 21, 2008 5:41 PM

Nice pix everyone! eventually I'll get somewhere near presentable!

Jon--love the set up--how long does it take to put the display together once you are at the venue?

Any argument carried far enough will end up in Semantics--Hartz's law of rhetoric Emerald. Leemer and Southern The route of the Sceptre Express Barry

I just started my blog site...more stuff to come...

http://modeltrainswithmusic.blogspot.ca/

  • Member since
    February 2005
  • From: England
  • 1,269 posts
Posted by jon grant on Sunday, December 21, 2008 6:00 PM

blownout cylinder

Jon--love the set up--how long does it take to put the display together once you are at the venue?

About 3/4 of an hour to get the test train running, once all the stuff had been carried in from the cars - assuming 4 regular operators. Some shows are better than others in that you can drive right up to the layout site and unpack direct.

The legs can be erected in a few minutes and the boards plonked straight onto them once the packing has been removed. 

 

The lighting rig and the fascia board probably take the longest to fit.

The layout was designed as an exhibition layout so everything has been designed for speed of erecting and  dismantling. Two things that help greatly are to stick as much of the scenery, road vehicles and figures down as possible and use purpose-built stock boxes for the locos and freight cars, rather than try and pack each into their original boxes.

 

Jon 

 

Sweethome Chicago is now on Facebook

Sweethome Alabama is now on Facebook

Hudson Road is now on Facebook

my videos

my Railimages

  • Member since
    February 2008
  • From: Memphis, TN
  • 3,876 posts
Posted by Packers#1 on Sunday, December 21, 2008 8:26 PM

 Well, I don't have pictures of the wiring I did today, but I also created a switchlist today. I followed the instructions at http://www.zianet.com/awebsite4u/pformin.html , but customized it a little bit too make it unique. For some reason, some of the lines got cut off, but for the most part, they're there. All rows between the "foreman/Engine No." line to the "-Double A Service, To The T-" line are 16 point size font each:

Sawyer Berry

Clemson University c/o 2018

Building a protolanced industrial park layout

 

  • Member since
    June 2004
  • From: Orig: Tyler Texas. Lived in seven countries, now live in Sundown, Louisiana
  • 25,640 posts
Posted by jeffrey-wimberly on Monday, December 22, 2008 8:02 AM

 The WPF on page three? Not on my watch!


Running Bear, Sundown, Louisiana
          Joined June, 2004

Dr. Frankendiesel aka Scott Running Bear
Space Mouse for president!
15 year veteran fire fighter
Collector of Apple //e's
Running Bear Enterprises
History Channel Club life member.
beatus homo qui invenit sapientiam


  • Member since
    October 2006
  • From: Texas
  • 2,934 posts
Posted by C&O Fan on Monday, December 22, 2008 8:02 AM

JimRCGMO

jacon12
 Let me echo the others here, I think the india ink wash is just right.  Get that dog and chair on the porch, some ground work around it and it's gonna be first class.  I wish I could do half this good.

 

Yeah!!, and Terry, maybe put an old wood stove in one corner for those cold nights. Thumbs Up

Great work and photos, everyone! I need to get a camera (preferably digital), but Christmas isn't here quite yet, so no pics from me. Have been looking
 over some structure kits I've started, and trying to figure how to get some 'Gothic' shaped openings cut in the board-n-batten walls for the windows.

 Jim in Cape Girardeau

Thanks to all for the kind words

and Jim i had thought about adding a chimney but i think your suggestion makes more sense given the size of the house

TerryinTexas

See my Web Site Here

http://conewriversubdivision.yolasite.com/

 

 

  • Member since
    July 2003
  • From: Salisbury, NC
  • 70 posts
Posted by nasaracer32 on Monday, December 22, 2008 9:17 AM

Hey RR Canuck, great shots!  Where did you find that long retaining wall?

Terry in Texas, everyone is right, great job on the ink.  Good work!

 

Will www.nhvry.org
  • Member since
    December 2003
  • From: Ft. Wayne Indiana Home of the Lake Division
  • 574 posts
Posted by Ibflattop on Monday, December 22, 2008 9:54 AM

Jon.

 When ya do go to a show, How much rolling stock and engines do you fellas take?     Kevin

Home of the NS Lake Division.....(but NKP and Wabash rule!!!!!!!! ) :-) NMRA # 103172 Ham callsign KC9QZW
  • Member since
    November 2007
  • From: Utah
  • 1,315 posts
Posted by shayfan84325 on Monday, December 22, 2008 11:30 PM

I ventured into the train room at the opening kickoff of the Bears/Packers game.  I've been working on Campbell's Gramma's House since Saturday evening - tonight was the night to assemble the 20 wall sections together.  By the time the Bears won in OT I was just gluing the last of the sections into place:

One thing I'll say for Gramma,her house has plenty of corners.  I used the grid on my cutting pad to help keep it all square.

I'll post progress photos next week on WPF.  In the mean time, you all have a great Christmas.

Phil,
I'm not a rocket scientist; they are my students.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!