Lynn
Present Layout progress
http://cs.trains.com/mrr/f/11/p/290127/3372174.aspx#3372174
Oh K guys here it is its a bit out of date so just kinda sort it out with your imagiminations By the way the grey matter is roadway ( yes I know what it looks like ) the perimeter rail starting in the lower left is a 3% grade going up then leveling off at the top left inside then declines from the top right to just below the sawmill then there's a 2% grade rail inside of that doing the same . And lots of bridges :)