I'm back!
Follow the progress:
http://ogrforum.ogaugerr.com/displayForumTopic/content/12129987972340381/page/1
Layout Design GalleryLayout Design Special Interest Group
--David
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.
I use switch lists which identify each car in a train and the lists are given to each operator. I only run two trains and a switcher in the yard. Takes a little bit of work up front.
Bear "It's all about having fun."
At home I use c carcard system with four sided waybills.
Our club uses carcards and eight sided waybills. Four waybill on each side of the paper, and fold in the middle. Getting to step five requires reversing the fold.
We use a " push" system where a car sits at an industry until a new car arrives, "pushing" a spotted car out, at which time the operator advances the waybill to the next location,
No maintenance required.
Dave